My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 07.11.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 07.11.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 11:44:43 AM
Creation date
3/6/2025 11:39:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) <br />a. <br />b. <br />d. <br />If the solar energy system remains nonfunctional or inoperative for a continuous period of 12 months, the <br />system shall be deemed abandoned and shall constitute a public nuisance. The owner shall remove the <br />abandoned system at their expense within 90 days. Removal includes the entire structure including <br />transmission equipment, structures and foundations, and the restoration of soil and vegetation. <br />Criteria for approval of an accessory commercial or industrial solar energy system. An <br />application for an accessory commercial or industrial solar energy system permit may be <br />granted only upon a finding that all the following criteria have been met: <br />The applicant owns the property or has a leasing contract with the owner of the property. <br />The proposed solar energy system conforms to this chapter. <br />The proposed solar energy system shall be subject to, by agreement with the property <br />owner or lease holder, any conditions that the city deems appropriate for permission of <br />the use. <br />(Ord. No. 2016-475, 12-21-2015; Ord. No. 2023-523, § 1, 5-1-2023) <br />5/6/24, 5:05 PM Hugo, MN Code of Ordinances <br />about:blank 7/7
The URL can be used to link to this page
Your browser does not support the video tag.