My WebLink
|
Help
|
About
|
Sign Out
Home
2025.03.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.03.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:13:46 PM
Creation date
3/18/2025 1:09:06 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/17/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 3 of 5 <br /> <br /> <br />cost. The estimated amount is set forth in Table 1. <br /> <br />5. County-Furnished Material <br />County-furnished material costs shall be items such as light poles, traffic signal control equipment, and <br />street name signs which are separately procured outside of the construction contract and installed <br />within the Project limits. The City shall pay their share of the final County-furnished material cost. The <br />estimated amount is set forth in Table 1. <br /> <br />TABLE 1 – ESTIMATED COSTS <br />City of Hugo Cost Summary <br />ITEM TOTAL COST <br />LPP MnDOT COUNTY CITY <br />GRANT STORM COST COST <br />Construction $1,036,541.95 $ 890,332.95 $85,379.00 $ 23,650.00 $37,180.00 <br />Design Engineering $ 289,943.00 $ - $ - $ 279,534.05 $10,408.95 <br />Construction Engineering/ <br />Contract Administration $ 78,056.96 $ 71,226.64 $ 6,830.32 $ - $ - <br />Right of Way $ - $ - $ - $ - $ - <br />County Furnished Material $ - $ - $ - $ - $ - <br />TOTAL ESTIMATED COST $1,404,541.91 $961,559.59 $92,209.32 $303,184.05 $47,588.95 <br /> <br />6. The costs and shares attributable to the City and payable to the County as shown in Table 1 are merely <br />estimated and a final reconciliation of costs as set forth in Section G below shall be done at the end of <br />the Project. Actual City costs and shares are based on the following: <br />a. Construction shall be based on the contractor's unit prices and final quantities at Project <br />completion including all contract changes. <br />b. Design engineering shall be based on the contractor’s unit prices at the time of contract award. <br />c. Construction engineering/contract administration shall be based on the contractor’s unit prices <br />and final quantities at Project completion including all contract changes and liquidated damages. <br />d. Right of way shall be based on the final costs to acquire right of way. <br />e. County-furnished material shall be based on the final costs to acquire County-furnished <br />material. <br /> <br />G. PAYMENT <br />1. Construction and Construction Engineering/Contract Administration <br />a. After the County has awarded the construction contract, the County shall update Exhibit B to <br />conform the Exhibit to the amounts in the awarded bid and shall invoice the City 10 percent of the <br />City's estimated construction and construction engineering/contract administration cost based on <br />the updated Exhibit B. <br />b. During construction, the County shall submit to the City partial estimates of work performed by the <br />contractor. The City shall pay to the County its share of the partial estimate as determined in Section <br />F. <br />c. Upon substantial completion of the work the County shall submit to the City a final invoice and final <br />reconciliation of costs. The reconciliation will add or subtract contract amendments to the City’s <br />Project components, adjustments for liquidated damages pursuant to Section I., and previous <br />Project cost payments made by the City to the County. <br />2. The costs set forth in Table 1 for design engineering and right of way shall be separate line items on the <br />invoice and paid by the City on a reimbursable basis. <br />Docusign Envelope ID: 1CFFC712-947A-44CC-ADF6-818462F3D23D
The URL can be used to link to this page
Your browser does not support the video tag.