My WebLink
|
Help
|
About
|
Sign Out
Home
2025.04.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.04.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:18:32 PM
Creation date
4/9/2025 2:15:13 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/7/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Shores of Oneka Lake 5th Addition 8 <br />Engineer. Seeding shall be completed as follows: <br /> a) All areas shall be restored with a minimum of four (4) inches of adequate <br />topsoil prior to seeding. <br /> b) Upland areas shall be seeded in accordance with the grading, drainage, and <br />landscape plans listed in Exhibit A. The rate of application shall be one hundred (100) pounds per <br />acre. Areas seeded shall be mulched with Type 1 mulch at a rate of two (2) tons per acre. All <br />mulch shall be disk anchored. <br /> c) Wetlands, wetland replacement areas and storm water ponding areas shall be <br />seeded with MN/DOT Seed Mixture 25B, or as required by the permitting regulatory agency. The <br />minimum rate of application shall be thirty (30) pounds per acre, or as recommended by the <br />supplier. <br /> d) All seeded areas shall be maintained for the term of this Agreement. Upland <br />areas shall be mowed as necessary or as directed by the City Engineer. <br /> e) All disturbed areas within the development shall be maintained to limit <br />vegetation growth to less than ten (10) inches except designated natural areas or designated open <br />spaces as shown on the approved plans. <br /> <br /> 15. Safe Rooms. The Developer shall require all builders to offer a safe room as an <br />option to any and all potential homebuyers. All safe rooms offered and built within the City <br />must meet or exceed FEMA requirements and standards. <br /> <br />B. ESCROWS, CHARGES AND UTILITY OVERSIZING: <br /> <br /> Developer shall pay the escrows, fees and charges listed on Exhibit C. <br /> <br />C. SPECIAL PLANNING REQUIREMENTS: <br /> <br /> The Plat shall be built and maintained in accordance with the planning requirements <br />listed on Exhibit A hereto, and any miscellaneous requirements listed on Exhibit B hereto. <br /> <br />D. ADMINISTRATIVE REQUIREMENTS: <br /> <br /> 1. Miscellaneous Provisions. Developer specifically understands that this Plat <br />approval is given subject to the following requirements: <br /> a) Expiration. The final plat documents for the Plat, which is the first <br />phase of The Shores of Oneka Lake preliminary plat, have been submitted to the City Council <br />within one hundred twenty (120) days of preliminary plat approval. The final plat must be recorded <br />with the Washington County Recorder (and the mylar "hardshells" must be fully executed) within <br />sixty (60) days of the City Council motion giving final plat approval, unless such deadline is
The URL can be used to link to this page
Your browser does not support the video tag.