Laserfiche WebLink
Status Unit Cost Quantity Estimate Subtotals Source Description <br />Demolition and Gutting <br />Asbestos Abatement Estimated 15,000.00$ R. Trudeau - Red Pine Industries <br />Reviewing ARM survey and will be back in touch. Indicated if we are <br />going down to the studs, abatement will be a smaller deal. <br />Compliance with Renovation, Repair, Painting Rule Estimated 15,000.00$ R. Trudeau - Red Pine Industries <br />Reviewing ARM survey - will refer us to contractor with RRP <br />certification. <br />Dumpster/Waste Removal Quoted 525.00$ 6 3,150.00$ Gene's <br />33,150.00$ <br />Structural Repairs <br />Foundation Repair Quoted 2,250.00$ B. LeTourneau Coalroom ceiling and floor <br />Attic and Main Floor Joist Repairs Estimated 3,000.00$ Primarily in Chimney area and in bathroom area <br />Basement Floor Repair/Leveling Quoted 1,000.00$ B. LeTourneau Basement stair chip and hole in the furnace room. <br />6,250.00$ <br />Interior Restoration <br />Hardwood Floor Repair & Refinish Quoted 10,000.00$ Dave's Floor <br />West side of floor must be replaced on the main level. Remaining <br />floors need to be refinished. <br />Rebuild stairs and hardwood Quoted 9,000.00$ Dave's Floor Rebuild stringers, risers, treads and finish with hardwood. <br />Framing/Reframing Estimated 20,000.00$ <br />Adjustments for ADA, reframing water damaged areas, new <br />framing in basement. <br />Decorative Tin Ceiling Priced Out 17.00$ 200 3,400.00$ <br />Decorative Tin Cove Molding Priced Out 150.00$ 20 3,000.00$ <br />New and Restored Light Fixtures Estimated 8,000.00$ <br />Drywall Quoted 21,000.00$ Universal drywall and spray.Main level, basement, ceiling <br />Insulation Quoted 20,575.00$ Houle Insulation Foam for walls and ceiling. Blown to get to R50. <br />Painting Priced Out 55.00$ 50 2,750.00$ Sherwin Williams <br />Trim, Doors, Windows Estimated 15,000.00$ <br />112,725.00$ <br />Bathrooms <br />Bathroom Tile Donated -$ 0 -$ <br />Materials and labor donated by J. Alwin - Functional bathroom only <br />(East side). <br />Square Pedestal sink Priced Out 100.00$ 1 100.00$ <br />Historic hardware/knobs Estimated 200.00$ <br />Historic non-functioning fixtures Estimated 1,000.00$ Non-functional historic bathroom toilet, sink (west side) <br />Vanity and Vanity Top Priced Out 250.00$ 1 250.00$ <br />Beveled frameless mirror Priced Out 45.00$ 1 45.00$ <br />ADA Toilet Priced Out 275.00$ 1 275.00$ <br />ADA Handrails Priced Out 50.00$ 1 50.00$ <br />Toilet Paper Holder Priced Out 20.00$ 1 20.00$ <br />Soap Dispenser Priced Out 40.00$ 1 40.00$ <br />Paper Towel Dispenser Priced Out 60.00$ 1 60.00$ <br />2,040.00$ <br />Core Systems <br />Electrical System Estimated 20,000.00$ <br />Plumbing Quoted 13,279.00$ Bartylla Plumbing & Heating, Inc. <br />Toilet and sink in bathroom and kitchen sink in basement. Septic <br />will either need to be level with the floor, or have a pump installed. <br />Hot water heater Estimated 3,000.00$ Bartylla Plumbing & Heating, Inc.Pending update to quote to confirm specific pricing <br />Septic Design Estimated 2,000.00$ <br />Septic System Estimated 20,000.00$ <br />HVAC System Estimated 15,000.00$ <br />Repair to Existing Well Quoted 7,592.50$ McCullough <br />Quote includes labor and materials to clean, treat, and develop the <br />well, and the necessary equipment to make it functional again. If <br />well sealing is needed it will be an additional charge. If a stub is <br />needed it will be $450. If the existing well cannot be used, a new <br />well will be needed. Estimate $20,000 for new well. <br />80,871.50$ <br />Exterior Improvements <br />Building Signage Estimated 3,000.00$ 1 3,000.00$ Historic Hopkins Schoolhouse- Est. 1928 <br />Exterior Lantern Lights Priced Out 250.00$ 3 750.00$ <br />Exterior Flood Lights Priced Out 60.00$ 4 240.00$ <br />ADA Compliant Lift - Front Porch Priced Out 10,000.00$ 1 10,000.00$ <br />ADA Compliant Sidewalks Estimated 10,000.00$ <br />Site Prep & Grading Estimated 15,000.00$ <br />Asphalt Paving Estimated 72,000.00$ <br />Drainage / Stormwater Management Estimated 20,000.00$ <br />Curbing / Landscaping Estimated 15,000.00$ <br />145,990.00$ <br />Furnishings & Finishing Touches <br />Classroom furniture Estimated 2,000.00$ <br />Display Cases / Historical Panels Estimated 1,000.00$ <br />Storage Shelving / Cabinetry Estimated 500.00$ <br />Interior Signage Estimated 1,000.00$ Donor recognition <br />4,500.00$ <br />Estimated Total with Repair of Existing Well 385,526.50$ <br />(7,592.00)$ Removal of repair to existing well <br />20,000.00$ New Well <br />Estimated Total with New Well 397,934.50$