Laserfiche WebLink
3 <br /> <br /> <br /> <br />1. Oriana CSG 2020-12 LLC Vegetation Management Plan (VMP) <br />Overview <br />1.1. Site Developer <br />Cedar Creek Energy <br />3155 104th LN NE <br />Blaine, MN 5549 <br />763.450.9763 <br />1.2. Project Description <br />The proposed community solar project is a .999 MW AC project planned for approximately <br />5 acres of solar footprint in Washington County, Hugo, Minnesota. Tracker-style panels <br />with approximately 24” ground clearance at max tilt and above- ground drivelines are <br />planned. <br />An existing tree line on the north, west, and south west of the site will provide vegetative <br />screening. One wetland has been delineated and identified within the entrance area to the <br />project area. The site will be planted with a fully-native pollinator mix to achieve the Habitat <br />Friendly Solar status as defined by the Board of Water and Soil Resources.1 <br />1.3. VMP Use and Objectives <br />The VMP was written to provide a brief overview and description of the project and to act <br />as a guide for vegetation installation and management. It has been custom-written based <br />on information known at the time of writing. The VMP should be treated as a living <br />document and adjusted as additional information about the site is gathered both pre and <br />post construction. A qualified native vegetation contractor with a history of success <br />working on native vegetation restorations should be contracted to implement the <br />procedures outlined in this document and to provide feedback and suggestions for the VMP <br />during the lifespan of the project. <br /> <br />1https://www.revisor.mn.gov/statutes/cite/216B.1642 <br />