Laserfiche WebLink
C:\Users\Michele.lindau\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\QIVA9AZR\MEMO-Receive Feasibility Report and Set Public Hearing <br />111725.docxC:\Users\Michele.lindau\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\QIVA9AZR\MEMO-Receive Feasibility Report and Set Public <br />Hearing 111725.docx <br />17 <br />8 <br /> <br />E <br /> <br />9 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br /> <br /> <br />| <br /> <br />SU <br />I <br />T <br />E <br /> <br />2 <br />0 <br />0 <br /> <br />| <br /> <br /> <br />SA <br />I <br />N <br />T <br /> <br />P <br />A <br />U <br />L <br />, <br /> <br />M <br />N <br /> <br /> <br />| <br /> <br />55 <br />1 <br />0 <br />1 <br /> <br /> <br />| <br /> <br />65 <br />1 <br />. <br />2 <br />8 <br />6 <br />. <br />8 <br />4 <br />5 <br />0 <br /> <br /> <br />| <br /> <br />WS <br />B <br />E <br />N <br />G <br />. <br />C <br />O <br />M <br /> <br />Memorandum <br />To: Honorable Mayor and City Council <br />Bryan Bear, City Administrator <br />From: Mark Erichson, City Engineer <br />Date: November 17, 2025 <br />Re: 2026 Bald Eagle Industrial Park Street Improvement Project <br />WSB Project No. 028436-000 <br />The 2026 Bald Eagle Industrial Park Street Improvement Project consists of full-depth <br />pavement removal, paving, mill and overlay improvements, spot curb and gutter <br />replacement, trail improvements, street lighting improvements, and minor utility <br />improvements on the following streets: <br />•130th Street N from Europa Trail to Forest Blvd N / Trunk Highway 61 (TH 61) <br />•Farnham Avenue N from the south terminus to 130th Street N <br />•Fenway Blvd N from 130th Street N to 140th Street N <br />•140th Street from Fenway Blvd N to Forest Blvd / TH 61 <br />The project scope includes improvements at Water Tower Park, which will involve <br />demolishing an abandoned communications building and removing old watermain <br />infrastructure. Additionally, the existing trail along Europa Court will be reconstructed as <br />part of this project. <br />The total estimated cost for the 2026 Bald Eagle Industrial Park Street Improvement <br />Project is approximately $4,690,400. This figure includes the projected construction <br />costs for 2026, a 5% construction contingency, and indirect costs amounting to 20% of <br />the estimated construction expenses. Enclosed is a copy of the feasibility report.