My WebLink
|
Help
|
About
|
Sign Out
Home
2015.03.02 RESO 2015-13
Hugo
>
City Council
>
City Council Resolutions
>
2015 CC Resolutions
>
2015.03.02 RESO 2015-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2015 3:07:35 PM
Creation date
3/3/2015 11:51:11 AM
Metadata
Fields
Template:
City Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2015-13 <br />A RESOLUTIN ORDERING IMPROVEMENT AND ORDERING THE <br />PERPARATION OF PLANS AND SPECIFICATIONS FOR THE PROPOSED RICE <br />LAKE MEADOWS ROADWAY AND DRAINAGE IMPROVEMENTS INCLUDING: <br />Geneva ave from oneka lake blvd to 305 ft south of 144th st, 147th St from Geneva Ave to <br />Glenbrook Ave., 146th St from Geneva Ave to Glenbrook Ave, Gleenbrook Ave from 144th St <br />to 145th St, Glenbrook Ave from 146th St to 147th St from Geneva Ave to Goodview <br />Ave, 144th St from Geneva Ave to Glenbrook Ave <br /> <br />WHEREAS, a Resolution adopted by the City Council on December 16, 2014 called for the City's <br />consultant City Engineer to prepare a feasibility study related to the proposed Rice Lake <br />Meadows roadway and drainage improvements. The nature of the improvements include <br />roadway reconstruction, storm drainage, and sanitary sewer repair, and appurtenant work; <br />and <br />WHEREAS, such feasibility report was received by the City Council at the February 2, 2015, regular <br />City Council meeting; and <br />WHEREAS, a motion of the City Council adopted on February 2, 2015, fixed a date for a Public <br />Hearing on the proposed improvements to be held on March 2, 2015; and <br />WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing was given, and the <br />hearing was held thereon on the 2nd day of March, 2015, at which time all persons <br />desiring to be heard were given an opportunity to be heard thereon. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF HUGO, MINNESOTA: <br />1. Such improvements are necessary, cost-effective, and feasible as detailed in the feasibility report. <br />2. Such improvement is hereby ordered as outlined in the feasibility report adopted the 2°a day of <br />February, 2015. <br />3. WSB & Associates, Inc. is hereby designated as the engineer for this improvement. The engineer shall <br />prepare plans and specifications for the making of such improvement. <br />Whereupon said resolution was moved for adoption by Council Member Weidt and duly seconded by <br />Council Member Klein. <br />Council members voting AYE: Haas, Klein, Petryk, Weidt <br />Council members voting NAY: None <br />Whereupon said resolution was declared passed and adopted this 2nd day of R1arc]a 2 15. <br />C <br />Tom Weidt, Mayor <br />ATTEST: <br />Michele Lindau, City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.