Laserfiche WebLink
RIGHT-OF-WAY ORDINANCE 2026-547 <br /> CITY OF HUGO <br /> WASHINGTON COUNTY,MN <br /> AN ORDINANCE OF THE CITY OF HUGO,MINNESOTA AMENDING CHAPTER 82— <br /> UTILITIES,ARTICLE IV RIGHT-OF-WAY <br /> THE CITY OF HUGO ORDAINS: <br /> Section 1.the City Council of the City of Hugo does hereby amend Chapter 82 Utilities, Article IV <br /> Right-of-way to read as follows: <br /> Chapter 82, Article IV, Sec. 82-301.—Definitions. <br /> Amend section to add the following: <br /> Construction Specifications means such requirements and conditions imposed by the City on an <br /> applicant,permit,permittee,registrant, or right-of-way user for use of the right-of-way in order to <br /> protect the health, safety, and welfare, or when necessary to protect the right-of-way and its current use. <br /> Chapter 82, Article IV, Sec. 82-312.—Other obligations. <br /> Rename Chapter 82, Article IV, Sec. 82-312 to read: <br /> Sec. 82-312.—Other obligations and construction specifications. <br /> Amend section to add the following: <br /> (e) Construction Specifications. <br /> General: Every applicant,permit, permittee, registrant, or right-of-way user shall: <br /> (1) Prior to issuance of any permit, comply with section 82-312 of this chapter. <br /> (2) Conduct all work in a matter to ensure the least obstruction to the adjacent roadway and to <br /> pedestrian and vehicular traffic and shall comply with section 82-305(3), 82-312(b), and 82- <br /> 317, as applicable. <br /> (3) To the greatest extent possible, provide space in the installation area for other right-of-way <br /> users, in accordance with section 82-320 of this chapter. <br /> (4) Maintain alignment and grade unless otherwise authorized by the City in writing. <br /> (5) Except as otherwise permitted by the City in writing, not commence any project work until <br /> all requirements of this section, sections 82-305 and 82-306 of this chapter, and all other <br /> applicable requirements, have been met. <br /> (6) Prior commencement of any project work, including materials delivery, notify all abutting <br /> property owners of the planned project. Notification must include a local contact(name, <br /> address, email address, telephone number) for both the contractor and the facility owner. <br /> Mailed notice must be provided 3-4 weeks in advance of the work; and door hangers 7-10 <br /> days in advance of the work. Copies of these documents must be provided to the City. If the <br />