3/11/2026 <br />11 <br />21 <br />Implementation Timeline <br />Community <br />Vision <br />Long Range <br />Plan <br />•Develop high- <br />level concept <br />•Identify areas <br />for additional <br />study <br />Feasibility <br />Study / <br />Preliminary <br />Design <br />• Reengage <br />stakeholders <br />• Work through <br />challenges, <br />refine designs <br />and costs <br />Final Design <br />•Finalize <br />design <br />•Formalize <br />funding and <br />agreements <br />Construction <br />• Construction <br />coordination, <br />likely in phases Open to <br />Public <br />Stakeholder Engagement <br />22 <br />Washington County Policy <br />Cost Share <br />•Initial implementation: 50% County Contribution <br />•Replacement/repaving: 100% County <br />Operations and Maintenance <br />•County (on County-owned land): <br />•Waste/recycle pickup <br />•Trailheads, kiosks, graffiti <br />•Seasonal mowing <br />•Local agency <br />•Winter plowing (optional) <br />•Minor maintenance <br />21 <br />22