My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 06.25.26
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2026 PC Packets
>
PC Packet 06.25.26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:18:28 PM
Creation date
6/18/2026 1:13:01 PM
Metadata
Fields
Template:
Commissions
Meeting Date
6/26/2026
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-503 <br />DETAILS <br />DRW25001 <br />PROJECT NO. <br />PRELIMINARY PLAT, <br />SITE PLAN, AND <br />REZONING REVIEW <br />04/20/26 <br />NOT FO <br />R <br />CONST <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br />SHEET <br />CERTIFICATION <br />REVISION DATE <br />ISSUE <br />PROJECT <br />D E S I G N <br />C I V I L E N G I N E E R I N G | L A N D S C A P E A R C H I T E C T U R E <br />3 1 0 4 T H A V E S O U T H , S U I T E 1 0 0 6 <br />M I N N E A P O L I S , M N 5 5 4 1 5 <br />www.elanlab.comp 612.260.7980 <br />f 612.260.7990 <br />1 2 3 4 5 6 <br />E <br />D <br />C <br />B <br />A <br />I hereby certify that this plan, specification <br />or report was prepared by me, or under my <br />direct supervision, and that I am a duly <br />Licensed Professional Engineer under the <br />laws of the state of MINNESOTA. <br />Stephen M. Johnston <br />18914 04/20/2026 <br />NOT FO <br />R <br />CONST <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br />REGISTRATION NO. <br />DATE <br />ONEKA LAKE <br />RESERVE <br />HUGO, MN <br />ONEKA LAKE, LLC <br />DON WILLENBRING <br />2120 WUTHERING <br />HEIGHTS ROAD <br />EAGAN, MN 55122 <br />651-363-3915 <br />C1 TURBIDITY CURTAIN <br />NO SCALE <br />CONSTRUCTION ENTRANCE <br />1 1/2" <br />10" <br />FLOW <br />FLOW <br />FLOW <br />FLOW <br />EROSION CONTROL BLANKET <br />A.BURY THE TOP END OF <br />THE MATTING STRIPS IN A <br />TRENCH 6 INCHES OR <br />MORE IN DEPTH. <br />B.TAMP THE TRENCH FULL OF SOIL. <br />SECURE WITH ROW OF STAPLES, <br />10 INCH SPACING, 4 INCHES <br />DOWN FROM THE TRENCH. <br />C.OVERLAP - BURY UPPER END OF <br />LOWER STRIP AS IN "A" AND "B". <br />OVERLAP END OF TOP STRIP 18 <br />INCHES AND STAPLE. <br />D. EROSION STOP - FOLD OF <br />MATTING BURIED IN SLIT <br />TRENCH AND TAMPED DOUBLE ROW <br />OF STAPLES. <br />NOTES: <br />1.APPLY LIME, FERTILIZER AND SEED BEFORE LAYING THE NET OR MAT. <br />2.START LAYING THE NET FROM THE TOP OF THE CHANNEL OR SLOPE AND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAY LOOSELY ON THE SOIL <br />BUT WITHOUT WRINKLES - DO NOT STRETCH. MAT OR BLANKET - TYPE PRODUCT SHOULD PROVIDE AT LEAST 30% COVERAGE OF THE SURFACE WHERE IT <br />IS APPLIED. <br />3.TO SECURE THE NET, BURY THE UPSLOPE END IN A SLOT OR TRENCH NO LESS THAN 6 INCHES DEEP, COVER WITH SOIL, AND TAMP FIRMLY AS SHOWN. <br />STAPLE THE NET EVERY 12 INCHES ACROSS THE TOP END AND EVERY 3 FOOT AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS OF NET ARE LAID SIDE <br />BY SIDE, THE ADJACENT EDGES SHOULD BE OVERLAPPED 3 INCHES AND STAPLED TOGETHER. EACH STRIP OF NETTING SHOULD ALSO BE STAPLED DOWN <br />THE CENTER, EVERY 3 FOOT. DO NOT STRETCH THE NET WHEN APPLYING STAPLES. <br />4.TO JOIN TWO STRIPS, CUT A TRENCH AND ANCHOR THE END OF THE NEW NET. OVERLAP THE END OF THE PREVIOUS ROLL 18 INCHES, AS SHOWN, AND <br />STAPLE EVERY 12 INCHES JUST BELOW THE ANCHOR SLOT. <br />MAINTENANCE: <br />INSPECT ALL MULCHES PERIODICALLY, AFTER RAINSTORMS TO CHECK FOR RILL EROSION, DISLOCATION, OR FAILURE. WHEN EROSION IS OBSERVED, APPLY <br />ADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED, AND REINSTALL MULCH. CONTINUE INSPECTIONS UNTIL VEGETATION IS <br />FIRMLY ESTABLISHED. <br />TYPICAL STAPLES #8 <br />GAUGE WIRE <br />PRESS ENDS 6 INCHES INTO <br />THE SOIL AROUND <br />STRUCTURES AND STAPLE <br />SECURELY <br />WHEN USING NETTING IN CHANNELS, ROLL OUT STRIPS OF <br />NETTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE <br />PROTECTIVE MULCH. <br />ALTERNATE - RUMBLE RACKS <br />ALTERNATE - FODS MAT <br />C3 <br />SILT FENCE <br />NO SCALE <br />A1 NO SCALE A2 NO SCALE A4 NO SCALE <br />TREE PROTECTION FENCE <br />DRIPLINE <br />4-FT MIN <br />6-FT. HIGH TEMPORARY ORANGE CONSTRUCTION FENCE SHALL BE PLACED AT <br />THE DRIPLINE OF THE TREE TO BE SAVED. FENCE SHALL COMPLETELY ENCIRCLE <br />THE TREE(S). INSTALL FENCE POSTS USING PIER BLOCKS ONLY. AVOID DRIVING <br />POSTS OR STAKES INTO MAJOR ROOTS. <br />FOR ROOTS OVER 1-IN DIA. THAT ARE DAMAGED DURING CONSTRUCTION, MAKE <br />A CLEAN, STRAIGHT CUT TO REMOVE THE DAMAGED PORTION. ALL EXPOSED <br />ROOTS SHALL BE TEMPORARILY COVERED WITH DAMP BURLAP TO PREVENT <br />DRYING, AND SHALL BE COVERED WITH SOIL AS SOON AS POSSIBLE. <br />WORK WITHIN PROTECTION FENCE SHALL BE DONE MANUALLY. NO STOCKPILING <br />OF MATERIALS, VEHICULAR TRAFFIC, OR STORAGE OF EQUIPMENT OR <br />MACHINERY SHALL BE ALLOWED WITHIN THE LIMIT OF THE FENCING. <br />BOTTOM <br />WATER SURFACE <br />ANCHOR CABLE <br />CARRIER FLOAT <br />STEEL TENSION CABLE <br />VA <br />R <br />I <br />A <br />B <br />L <br />E <br /> <br />D <br />E <br />P <br />T <br />H <br />12 <br />" <br />ANCHOR CURTAIN WEIGHT <br />VARIABLE LENGTH <br />CURTAIN FABRIC <br />FLOATATION SILT CURTAIN <br />STILL WATER TYPE <br />AP <br />P <br />R <br />O <br />X <br />. <br /> <br />2 <br />0 <br />' <br />STREAM, LAKE OR MARSH <br />PLAN VIEW <br />SIDE VIEW <br />CURRENT <br />D1 NO SCALE <br />DITCH CHECKC6 NO SCALE <br />POINT A <br />POINT B <br />SEDIMENT LOG <br />SEDIMENT <br />LOG WOOD <br />STAKESFLOW <br />PLAN <br />1.SEDIMENT LOG SHALL CONSIST OF STRAW OR FIBERS ENCASED IN AN OUTSIDE OPEN WEAVE <br />CONTAINMENT FABRIC. <br />2.SEDIMENT LOG SHALL BE INSTALLED IN ACCORDANCE WITH <br /> THE MANUFACTURER'S INSTRUCTIONS. <br />3.POINT A SHALL BE HIGHER THAN POINT B TO ENSURE THAT <br /> WATER FLOWS OVER THE CHECKS AND NOT AROUND THE ENDS. <br />1 <br />TURF REINFORCEMENT MAT <br />SEE 6/C-501 <br />EROSION CONTROL BLANKET <br />INSTALL ECB IN ACCORDANCE WITH THE <br />MANUFACTURER'S INSTRUCTIONS. <br />NOTES: <br />SECTION <br />INLET PROTECTION <br />ANCHOR <br />POINT A
The URL can be used to link to this page
Your browser does not support the video tag.