My WebLink
|
Help
|
About
|
Sign Out
Home
2026.04.20 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2026 CC Packets
>
2026.04.20 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 2:10:15 PM
Creation date
7/2/2026 1:54:42 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/20/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />7 <br />0 <br />1 <br /> <br />X <br />E <br />N <br />I <br />A <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br /> <br />S <br /> <br /> <br />| <br /> <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />3 <br />0 <br />0 <br /> <br /> <br />| <br /> <br /> <br />M <br />I <br />N <br />N <br />E <br />A <br />P <br />O <br />L <br />I <br />S <br />, <br /> <br />M <br />N <br /> <br /> <br />| <br /> <br /> <br />5 <br />5 <br />4 <br />1 <br />6 <br /> <br /> <br />| <br /> <br /> <br />7 <br />6 <br />3 <br />. <br />5 <br />4 <br />1 <br />. <br />4 <br />8 <br />0 <br />0 <br /> <br /> <br />| <br /> <br /> <br />W <br />S <br />B <br />E <br />N <br />G <br />. <br />C <br />O <br />M <br /> <br /> <br /> <br />April 13, 2026 <br /> <br />Ms. Shayla Denaway <br />Parks Planner <br />City of Hugo <br />14669 Fitzgerald Ave N <br />Hugo, MN 55038 <br /> <br />Re: Professional Services Proposal – Veterans Memorial Design Development <br /> <br />Dear Shayla: <br /> <br />This letter serves as a proposal on behalf of WSB, LLC (Consultant) to the City of Hugo (Client) <br />to complete professional consulting and design services for design development of the planned <br />Veterans Memorial to be located at Lions Volunteer Park. <br /> <br />A.1 PROJECT UNDERSTANDING <br /> <br />It is understood that the Client seeks professional services for the preparation of design <br />development documents for a Veterans Memorial to include fundraising marketing documents. <br />Our design team includes review and guidance by a WSB staff member that is a current member <br />of the military for conformance to military design standards. <br /> <br />B.1 BASE SCOPE OF SERVICES <br /> <br />B.1.1 DESIGN DEVELOPMENT <br />(1) Project Management & Kick-Off Meeting: Consultant will facilitate a virtual kick- <br />off meeting with City staff to review the project schedule and deliverables along <br />with a discussion of programming ideas for the proposed improvements. Project <br />management tasks include ongoing coordination with the client, vendors, and <br />related oversight. Consultant will review the design guidelines, and prepare base <br />map drawings necessary for the design process. <br /> <br />(2) Schematic Design: The Consultant will prepare up to three schematic plans <br />illustrating varying design approaches to the veteran’s memorial area as it relates <br />to entrance points, circulation patterns, views, seating and gathering spaces, <br />monument sizes and materials, and overall scale. <br /> <br />(3) Veterans Memorial Committee Meeting #1: The Consultant will attend an in- <br />person meeting to allow the committee to review the schematic design options <br />and provide feedback on overall design preferences. <br /> <br />(4) Preferred Design Approach: The Consultant will develop a preferred design <br />approach based upon the outcomes and direction of the committee to include <br />draft landscaping elements and a corresponding estimate of probable costs. The <br />preferred plan will include draft imagery to illustrate the design components, <br />including general sizes, materials, location of landscaping, and an estimate of <br />probable costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.