My WebLink
|
Help
|
About
|
Sign Out
Home
2026.05.18 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2026 CC Packets
>
2026.05.18 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 2:10:51 PM
Creation date
7/2/2026 1:55:13 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/18/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Hugo <br />Fire Department <br />5323 140th Street North <br />Hugo, Minnesota 55038 <br />PH: (651) 762-6362 FAX: (651) 429-3212 <br /> <br /> <br /> <br />To: Bryan Bear, City Administrator <br /> <br />From: Jim Compton, Jr., Fire Chief <br /> <br />Date: May 14, 2026, for the City Council Meeting on May 18, 2026 <br /> <br />Subject: Fire Department Equipment Capital Improvement Plan (CIP) <br />_______________________________________________________________________________ <br /> <br />City Council Goals Update <br /> <br />In the 2026 City of Hugo Focus Goals under Public Safety, it was approved to evaluate the <br />equipment CIP to accommodate future Fire Department trucks. A truck committee was put together, <br />consisting of Deputy Chief Dave Jensen, Chief Engineer Tom Kaspszak, Lieutenants Ryan Nadeau <br />and Bob Bieniek, and Firefighter Tom Robinson. The committee was directed to evaluate the <br />feasibility of consolidating trucks to minimize the City of Hugo's costs and streamline department <br />operations. <br /> <br />Direction to the committee was given to complete a full fleet evaluation which included maintenance <br />costs, number of fire apparatus, and replacement options. The committee has met several times to <br />discuss the future needs of apparatus within the Fire Department. They requested quotes from <br />several fire truck manufacturers to gain a clear understanding of the potential cost to replace our <br />apparatus. <br /> <br />CIP Background <br /> <br />The equipment CIP is scheduled for 5-year cycles and budgeted annually. Current CIP practices are <br />to replace with new trucks on schedules of 30 years for the large apparatus, 20 years for small <br />apparatus, and 10 years for chief squads. The large apparatus includes a ladder, a pumper/tanker, a <br />tender (tanker), and a heavy rescue. Small apparatuses include two brush pick-up trucks and a utility <br />pick-up truck. Chief squads include two pick-up trucks and one SUV. Assuming the 30-year <br />replacement schedule, the equipment CIP would need to accommodate replacement of the tender in <br />2032 and the heavy rescue in 2034. The CIP includes the replacement of a brush truck this year. <br /> <br />Analysis <br /> <br />Incorporation of a re-chassis strategy into CIP: <br />As part of this evaluation, the possibility of a re-chassis of our large apparatus was explored. What <br />that means is we would take the stainless-steel truck box, fire pump, and tank off the back of the <br />chassis and put it on a new chassis, saving approximately 30-40% of the total cost of buying new. <br />Currently, manufacturers are telling us they would re-chassis one time in a truck’s life. This strategy <br />would include a re-chassis every 25 years and a completely new built truck every 50 years. This <br />changes the CIP from a completely newly built truck every 30 years. By doing this re-chassis model, <br />the City of Hugo could consider lowering the expected replacement costs to large fire apparatus for <br />years to come.
The URL can be used to link to this page
Your browser does not support the video tag.