My WebLink
|
Help
|
About
|
Sign Out
Home
2026.06.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2026 CC Packets
>
2026.06.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 2:11:23 PM
Creation date
7/2/2026 1:56:07 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/15/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2 <br /> <br />SECTION 2. TERM. This Agreement shall become effective upon execution by both <br />Parties and shall remain in effect until terminated by mutual written agreement of the <br />Parties, or as otherwise expressly provided herein. The provisions of this Agreement <br />relating to payment obligations, maintenance responsibilities, and cost reconciliation <br />shall survive completion of the Overlay Project and any termination of this Agreement to <br />the extent applicable. <br /> <br />SECTION 3. DESIGN AND CONSTRUCTION. <br /> <br />A. Design. Lino Lakes shall be responsible for the design and construction of both <br />the portion of the Overlay Project located within Hugo and the portion of the <br />Overlay Project located within Lino Lakes. Therefore, the parties agree that: <br /> <br />1) Lino Lakes shall design the Overlay Project, administer the construction, <br />and conduct inspections of the construction process. Hugo shall have the <br />right to inspect, review, and comment upon construction of the Overlay <br />Project. Hugo shall have the right to review and approve the final plans <br />and specifications prior to Lino Lakes submitting the advertisement for <br />bids, with such approval not being unreasonably withheld, delayed, or <br />conditioned. <br /> <br />2) For purposes of performing its obligations under this Agreement, Hugo <br />hereby grants to Lino Lakes the right to use the streets, public ways, and <br />easements of Hugo for purposes of constructing the Extension Project and <br />Overlay Project, including any excavations necessary to perform work <br />incidental to the performance of this agreement. <br /> <br />3) Lino Lakes and Hugo agree to notify property owners in their own <br />communities of the construction Overlay Project scope and schedule. <br /> <br />4) The project is planned to be constructed within existing public right of <br />way. Stormwater management will be coordinated between Lino Lakes <br />and Hugo during the design. Lino Lakes will obtain the Rice Creek <br />Watershed District permit, if necessary. <br /> <br />B. Cost Sharing. Hugo shall be responsible for fifty percent (50%) of the engineering <br />costs and fifty percent (50%) of the construction costs of the Overlay Project. <br />Estimated project costs and each Party’s respective share shall be set forth in <br />Exhibit C, which may be updated to reflect actual bid prices and project phasing. <br /> <br />Lino Lakes shall invoice Hugo for one hundred percent (100%) of Hugo’s share <br />of design engineering costs upon completion of design engineering services. <br />Hugo shall pay such invoice within thirty (30) days of receipt. <br /> <br />With respect to construction engineering and construction costs, Hugo shall pay <br />ninety percent (90%) of its estimated share, as updated based on awarded bid
The URL can be used to link to this page
Your browser does not support the video tag.