My WebLink
|
Help
|
About
|
Sign Out
Home
2026.07.06 ORD 2026-549 Replace Zoning and Land Use Ordinance
Hugo
>
City Council
>
City Council Ordinances
>
2026 CCOrdinances
>
2026.07.06 ORD 2026-549 Replace Zoning and Land Use Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2026 10:00:09 AM
Creation date
7/7/2026 1:27:50 PM
Metadata
Fields
Template:
City Council
Document Type
Ordinances
Meeting Date
7/6/2026
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Created: 2025-05-22 16:40:50 [EST] <br />(Supp. No. 36) <br /> <br />Page 34 of 198 <br />ii. The applicant shall transmit one copy of the information described in subsection (i) to a <br />designated engineer or other expert person or agency for technical assistance, where <br />necessary, in evaluating the proposed project in relation to flood heights and velocities, the <br />seriousness of flood damage to the use, the adequacy of the plans for protection, and <br />other technical matters <br />iii. Based upon the technical evaluation of the designated engineer or expert, the City shall <br />determine the specific flood hazard at the site and evaluate the suitability of the proposed <br />use in relation to the flood hazard. <br />(9) Application fees and escrow, as established by the city council. <br />(b) Upon receipt of a completed application for a conditional use permit, the community development director <br />or designee shall schedule the application for a hearing before the planning commission. <br />(1) If the conditional use permit application relates to any floodplain or shoreland area, notice of the <br />application shall be provided to the commissioner of the department of natural resources at least ten <br />days prior to the hearing date. <br />(2) If the conditional use permit application relates to any development fronting a county highway, the <br />county engineer shall be given notice of the application ten days prior to the hearing date. <br />(3) Notice of the conditional use permit application shall be provided to the property owner of record for <br />properties located within 350 feet of the lot or parcel to which the application applies, at least ten days <br />prior to the hearing date. <br />(4) If the application relates to the floodplain district, the city engineer shall determine as necessary, the <br />100-year flood elevation, floodway, and flood fringe boundaries and also make a determination and <br />report to the planning commission the impact the proposed use will have on the floodplain, including <br />any expected increase to the regional flood elevation and peak discharge of the regional flood. Such <br />determination shall be based upon a hydraulic analysis of the stream channel and overbank areas, in <br />accordance with Minnesota Rules 6120.5000—6120.6200, and assume an equal degree of <br />encroachment on both sides of the stream within the reach. In making a determination, the city <br />engineer shall use existing floodway and flood fringe boundaries shown as Zone AE on the city's official <br />floodplain map. The property owner may request a map revision in accordance with section 90-138. <br />(c) In order to recommend approval of a conditional use permit, the commission must find all of the following: <br />(1) The proposed use is permissible by law. <br />(2) The proposed use is in keeping with the spirit and intent of this chapter. <br />(3) The proposed use is compatible with the city's comprehensive plan, and the character of the <br />surrounding area. <br />(4) The proposed use has adequate drainage, water supply, electrical, gas, and sewage treatment facilities. <br />(5) The proposed use has adequate road access, and does not reduce the safety or capacity of the public <br />road system. Road access shall be no lower than the regional flood elevation. <br />(6) The technical evaluation of the floodplain, if required, accurately represents the conditions and <br />boundaries of the floodplain area, as well as correctly represents the proposed use's impact on the <br />floodplain. <br />(7) The proposed use may not create a danger that materials may be swept onto other lands, or <br />downstream to the injury of others, or block bridges, culverts, or other hydraulic structures. <br />(8) The proposed use will not damage or reduce the benefits the public receives from public waters.
The URL can be used to link to this page
Your browser does not support the video tag.