Laserfiche WebLink
CITY OF HUGO <br />2010 FEES, RATES AND CHARGES <br />ESCROW <br />FEES AND OTHER <br />Farm Site Plan <br />$ <br />30.00 <br />Partial Reconstruction <br />Sketch Plan Review <br />$ <br />110.00 <br />$ 3,400.00 <br />STREET & ROADWAY RELATED: <br />Urban Roadway Overlay <br />$ 2,100.00 <br />per unit <br />Street and Easement Vacation <br />$ <br />110.00 <br />$ 5,000.00 <br />SUBDIVISION RELATED: Payable with Preliminary AND Final Plat Applications <br />Minor Subdivision - Rural (3 lots or less) <br />$ <br />220.00 <br />Minor Subdivision - Urban (3 lots or less) <br />$ <br />220.00 <br />$ 2,000.00 <br />Subdivision - 4 to 15 lots <br />$ <br />540.00 <br />$ 5,000.00 <br />Subdivision - 16 to 30 lots <br />$ <br />700.00 <br />$ 10,000.00 <br />Subdivison - Over 30 lots <br />$ 1,632.00 <br />$23 per lot <br />$ 20,000.00 <br />VARIANCE RELATED: <br />per SAC unit <br />Sewer Utility Permit <br />$ 30.00 <br />Variance to Zoning Ordinance <br />$ <br />200.00 <br />per SAC unit <br />Water Infrastructure Trunk Fee <br />$ 1,960.00 <br />per SAC unit <br />v <br />PUBLICATIONS: <br />per SAC unit <br />Water Meter Rental - Residential <br />$ 285.00 <br />Audit <br />$ <br />55.00 <br />Comprehensive Plan <br />$ <br />55.00 <br />Water Meter Rental - Commercial - Larger than 2" <br />Municipal Code <br />$ <br />125.00 <br />$ 575.00 <br />Zoning Map <br />$ <br />7.00 <br />Zoning Ordinance <br />$ <br />65.00 <br />Water Meter Rental - Irrigation - Larger than 2" <br />Other Publications <br />+ WACs to be determined by City Engineer <br />Cost + 10% <br />$ 80.00 <br />DVD Recordings <br />$ <br />10.00 <br />Official Newspaper Exempt <br />Water Utility Permit <br />$ 30.00 <br />PUBLIC WORKS RELATED: <br />Grass/Weed Mowing <br />$ <br />75.00 <br />first half hour (minimum charge) <br />Grass/Weed Mowing <br />$ <br />50.00 <br />each additional hour or fraction thereof <br />Street Sweeping <br />$ <br />150.00 <br />per hour <br />ROADWAY RECONSTRUCTION/REHAB <br />Single -Family Residential/Duplex Rates: <br />Complete Reconstruction <br />$ 5,200.00 <br />per unit <br />Partial Reconstruction <br />$ 4,100.00 <br />per unit <br />Roadway Reclamation/Overlay <br />$ 3,400.00 <br />per unit <br />Urban Roadway Overlay <br />$ 2,100.00 <br />per unit <br />Rural Roadway Overlay <br />$ 1,800.00 <br />per unit <br />UTILITY RELATED: <br />Hydrant Water (per truck load) <br />$ 20.00 <br />Hydrant Meter Rental Deposit <br />$ 700.00 <br />Hydrant Meter Rental <br />$ 20.00 <br />per day + $2.20/thousand gallons <br />Sewer Infrastructure Fee (in lieu of assessment) <br />$ 3,100.00 <br />per SAC unit <br />Sewer Infrastructure Trunk Fee <br />$ 1,632.00 <br />per SAC unit <br />Sewer Infrastructure (SAC) Fee <br />$ 588.00 <br />per SAC unit <br />Sewer Utility Permit <br />$ 30.00 <br />Water Infrastructure Fee (in lieu of assessment) <br />$ 3,100.00 <br />per SAC unit <br />Water Infrastructure Trunk Fee <br />$ 1,960.00 <br />per SAC unit <br />Water Infrastructure (WAC) Fee <br />$ 680.00 <br />per SAC unit <br />Water Meter Rental - Residential <br />$ 285.00 <br />Water Meter Rental - Commercial - 1&1/2" Meter <br />$ 575.00 <br />Water Meter Rental - Commercial - 2" Meter <br />$ 695.00 <br />Water Meter Rental - Commercial - Larger than 2" <br />Cost + 10% <br />Water Meter Rental - Irrigation - 1&1/2" Meter <br />$ 575.00 <br />+ 2 WACs <br />UTILITY RELATED: (continued) <br />Water Meter Rental - Irrigation - 2" Meter <br />$ 695.00 <br />+ 2 WACs <br />Water Meter Rental - Irrigation - Larger than 2" <br />Cost + 10% <br />+ WACs to be determined by City Engineer <br />Water Meter Testing <br />$ 80.00 <br />Refundable if meter is faulty <br />Water Meter No -Access Penalty <br />$ 75.00 <br />Water Utility Permit <br />$ 30.00 <br />Page 3 <br />