My WebLink
|
Help
|
About
|
Sign Out
Home
1991.09.16 CC Minutes
Hugo
>
City Council
>
City Council Minutes
>
1991 CC Minutes
>
1991.09.16 CC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 1:45:24 PM
Creation date
9/23/2015 8:13:02 AM
Metadata
Fields
Template:
City Council
Document Type
Minutes
Meeting Date
9/16/1991
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES FOR THE CITY COUNCIL MEETING OF SEPTEMBER_16, 1991 <br />The meeting was called to order by Mayor Stoltzman at 7:00 PM. <br />PRESENT: Brunotte, Jesinski, McAllister, Miron, Stolt man <br />City Administrator, Ken Huber <br />City Engineer, Howard Kuusisto <br />City Clerk, Mary Ann Creager <br />Jesinski made motion, Brunotte seconded, to approve the minutes for the <br />City Council meeting of September ._., 1991, as amended. <br />All aye. Motion Carried. <br />Miron made motion, McAllister seconded, to approve the claims for <br />September 16, 1991 in the amount of $21,419.36. <br />All aye. Motion Carried. <br />COUNTS( ROAD J ROAD PROJECT <br />In 1987, the City Council authorized participation, by the City, with <br />White Bear Township and Ramsey County for the improvement of 120th Street, <br />from Highway 61 to a point approximately 112 mile to the east. In 1988, <br />the City entered entered into a Joint Powers Agreement with White Bear <br />Township to proceed with this project. Thip appropriate public hearings <br />were held, and the City set aside the financing for their share of the <br />project. The City's share of this project was to be approximately <br />$68,000, while the Township would be paying approximately $156,000, and <br />the balance coming from the Ramsey County federal aid urban account. To <br />avoid duplication of effort, and coordination of the project effort, the <br />City of Hugo appointed the engineering firm of Toltz, King, Duvall, and <br />Anderson as the engineer for this public improvement. This project has <br />moved along rather slowly because of the many agencies involved and the <br />requirements that need to be met. Mr. Bob Toddie of Tk::DA appeared before <br />the City Council to review the status of this project, and outline what <br />steps are now necessary to bring this project to a point where <br />construction can beqin. <br />Mir -on made motion, Jesinski seconded, to approve the plans for the County <br />Road J Project, and authorize Tolt" King, Duvall, and Anderson to proceed <br />with negotiations to obtain the required right-of-way needed to proceed <br />with the project. <br />All aye. Motion Carried. <br />AMBULANCE CONTRACT <br />The City of Hugo is in the last year of a 5 -year contract with the City of <br />White Bear Lake for ambulance service. As ,-equested by the City Council, <br />the City Administrator met with the White Rear Lake and Forest Lake <br />ambulance services, and prepared background information and a <br />recommendation for Council consideration. Fire Chief, Ron Istvanovich, <br />recommended that the City retain WBL_ for ambulance service. Jack: Lannon <br />and Dan Beyers from District Memorial Hospital were present to again <br />explain their service and answer any questions from the Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.