My WebLink
|
Help
|
About
|
Sign Out
Home
1972.08.07 ORD 1972-108
Hugo
>
City Council
>
City Council Ordinances
>
1972 CC Ordinances
>
1972.08.07 ORD 1972-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:11:36 PM
Creation date
10/12/2015 10:27:36 AM
Metadata
Fields
Template:
City Council
Document Type
Ordinances
Meeting Date
8/7/1972
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. The fees and charges listed herein are exclusive ot toes <br />and charges required by the State of Minnesota pertaining <br />to electrical permits and lospectiorm <br />F. At the discretion of the Adminish*ative Audioi*,: an <br />additional dwV, not to exceed actual expenses incurried, <br />may be required In such instances where repeated vidldlOns <br />of the building codes and ordinances make necessary sa <br />cessive number of reinspections.in order to insure <br />ance with the provislonsjot said codes and <br />charges -shall':be payable by the permitee prior to the <br />ante' of Certificate *of Octujiam.- <br />G. Fee Schedules <br />(I)BUELDINGPERMIT FEES. Afee for each building pat 1* <br />shall be paid to the Administrative Authority as set A r* <br />below. <br />PLUMBING INVECTMN FEEL Fees fano in- <br />spection shall. In P&M to the Administrative "hortas <br />ISO forth below.. <br />(a) First fixture - 0.00 <br />Each additional ftture - $2.00 <br />(c) ftboPection - $5.00 <br />(d) Drain Odd opening - $10.00 <br />(e) Well drgft permit - 47.9 <br />(3) HEATING AND APPLIANCE INSPECTION FEEL lees <br />for inspection of beating system or appliance Installsoons <br />shall be paid to the Administrative Authority as ad Orth <br />below: <br />(a) Natural Gas <br />4.00 for each burner using 400,000 B.T.U. or *as <br />1.00 for each additional 400,000 B.T.U. or traction <br />1.00 for gas line <br />.2.00 for sheet metal work " air system) <br />W Steam or ildt Water System <br />4.00 for each burner - using 400,000 B.T.U. or less <br />1.00 for each additional 400,000 B.T.U. or tract an <br />1.00 for the line <br />.50 for each radiator or other fees as shown In Cod for <br />figured radiation as given by contractor <br />Af <br />BUILDING PERMIT. FEE SCH <br />PLAN <br />VALUATION <br />ALUM <br />PERMIT <br />STATE OF h13NN <br />CHECKING <br />9011C HAROE <br />FEE <br />$2-5VOAO to $4000.00 <br />.0 to 1140 <br />F <br />$10.00 <br />$.50 <br />N.A. <br />$1001M to $5000.00 <br />A10.00 far first $1000.00 <br />.0005 at permit <br />NA,* <br />plus .50 for each additional <br />fee -$.50 mkd- <br />100.00 or fraction <br />MUM. <br />t to 2 <br />o $26,000.00 <br />$30.00 for the first $5000. <br />0006 of permit. <br />N.A. <br />plus $1.50 for each additiond <br />fee <br />1000.00 or fraction I <br />$25,001.00 to $65,09000 <br />'$60.00 for first $25,000 plus <br />0005 otpermit <br />24%.of <br />2.00 for each additional <br />f" <br />permit fee <br />1000.00 or fraction t <br />1.00 to $150,000.00 <br />$140.00 for first $65,000.00 1 <br />M5 otpermit <br />25% of <br />Plus 1.M JDr each additional I' <br />fee. <br />permithe <br />1000.00 or fraction <br />$$60,001.00 and up <br />$267.50 for first $150,000 <br />*0005 of permit <br />2896 of <br />plus 1.00 for each additional <br />too <br />permit fee <br />1000.00 or traction <br />*In specific instances where special des* <br />or akkeserks cou- <br />cepts are involved or other unusual cm <br />Mass s3d$4 a Ow <br />cbedcing fee not to exceed 25% of *9 p <br />=A he nM k* re- <br />Quired. <br />PLUMBING INVECTMN FEEL Fees fano in- <br />spection shall. In P&M to the Administrative "hortas <br />ISO forth below.. <br />(a) First fixture - 0.00 <br />Each additional ftture - $2.00 <br />(c) ftboPection - $5.00 <br />(d) Drain Odd opening - $10.00 <br />(e) Well drgft permit - 47.9 <br />(3) HEATING AND APPLIANCE INSPECTION FEEL lees <br />for inspection of beating system or appliance Installsoons <br />shall be paid to the Administrative Authority as ad Orth <br />below: <br />(a) Natural Gas <br />4.00 for each burner using 400,000 B.T.U. or *as <br />1.00 for each additional 400,000 B.T.U. or traction <br />1.00 for gas line <br />.2.00 for sheet metal work " air system) <br />W Steam or ildt Water System <br />4.00 for each burner - using 400,000 B.T.U. or less <br />1.00 for each additional 400,000 B.T.U. or tract an <br />1.00 for the line <br />.50 for each radiator or other fees as shown In Cod for <br />figured radiation as given by contractor <br />Af <br />
The URL can be used to link to this page
Your browser does not support the video tag.