Laserfiche WebLink
ORDINANCE NO. 112 <br />AN ORDINANCE ESTABLISHING SEWER SERVICE AVAILABILITY AND CONNECTION <br />CHARGE TO PAY RESERVE CAPACITY COSTS OF METROPOLITAN SEWER BOARD. <br />The Village Council of the Village of Hugo, Washington County, <br />Minnesota, hereby ordains: <br />Section 1. RECITALS. The Metropolitan Sewer Board has deter- <br />mined to reserve unused capacity in the metropolitan disposal system <br />each year commencing in 1973 for local government units in which new <br />buildings to be connected to the system and new connections to the <br />system are commenced during such year; and to allocate the debt <br />service costs of such unused capacity for the year among local govern- <br />ment units. In order for the Village to pay such costs allocated to <br />it each year, it will be necessary to establish sewer service avail- <br />ability and connection charges for all buildings to be constructed <br />or connected to the metropolitan disposal system on or after January 1, <br />1973. <br />Section 2. ESTABLISHMENT OF CHARGES. For the purpose of paying <br />costs of reserve capacity allocated to the Village each year by the <br />Metropolitan Sewer Board, there is hereby established a charge for: <br />Subd. A. The availability of treatment works and <br />interceptors comprising the metropolitan disposal <br />system; and <br />Subd. B. Connections, direct and indirect, to the <br />metropolitan disposal system. <br />The charge is imposed on each building or structure in the Village, <br />or each connection to the metropolitan disposal system directly or <br />through the Village's system inside the Sewer Service Area established <br />by the Metropolitan Sewer Board, construction of which is commenced <br />on or after January 1, 1973. The charge shall be payable upon the <br />issuance of a building permit or a connection permit, as the case <br />may be, but no charge shall be due upon the issuance of a connection <br />permit if a charge was paid upon issuance of a building permit. <br />The charge for each building or structure shall be equal to <br />the number of units of sewage volume which it will discharge, multiplied <br />by $275 for 1973, and $300 for 1974, $325 for 1975, $350 for 1976 and <br />$375 for 1977, unless amended. A unit of sewage volume shall be <br />100,000 gallons per year and shall be assigned as follows: <br />Subd. A. Single family houses, townhouses and duplex <br />units shall each comprise one unit; <br />