Laserfiche WebLink
A.A structure or the use of a structure <br /> or premises which was lawful before the <br /> pertinent structure, fill, or storage passage or amendment of this Or- <br /> elevations, size, location; and spatial dinance but which is not in conformity <br /> arrangement 14 all proposed and with the provisions of this Ordinance <br /> existing structures on the site;location may be continued subject to the <br /> and elevations of streets; photographs following conditions: <br />' showing existing land uses and 1. No such use shall be expanded, <br /> vegetation upstream and.downstream; changed,enlarged,or altered in a way <br /> and soil type. which increases its nonconformity. <br /> iii YProfile showing the slope of the 2. No structural alteration or ad- <br /> bottom of the channel or flow line of the clition to any nonconforming structure <br /> stream for at least 500 feet in either over the life of the structure shall exceed <br /> direction from the proposed develop- 50percent of its market value at the time <br /> ment. of its becoming a Nonconforming Use, <br /> b.One copy of the above information unless the structure is permanently <br /> shall be transmitted to the City Engineer changed to a Conforming Use or unless <br /> for technical assistance in determining the alteration or addition would sub- <br /> whether the proposed use is in the stantially reduce potential flood <br /> floodway or flood fringe and to deter- damages for the entire structure. <br /> mine the regulatory flood protection 3.Any alteration or addition to any <br /> elevation Procedures consistent with Nonconforming Use which would result <br /> Minnesota Regulations NR 86-87 shall be in substantially increasing its flood <br /> followed in this expert evaluation.The damage potential shall be protected in <br /> City Engineer shall: accordance with Section 320-28.Subd.D <br /> i.Estimate the peak discharge of (6)eofthis Ordinance. <br /> the repional flood. 4.If such use is discontinued for 24 <br /> u. Calculate the.water surface consecutive months, any future use of <br /> profile of the regional flood based upon a the building premises shall conform to <br /> hydraulic analysis of the stream channel this Ordinance. <br /> and overbank areas. 5. If any Nonconforming Use is <br /> iii. Compute the floodway destroyed by any means, including <br /> necessary to convey the regional flood floods,to an extent of 50 percent or more <br /> without increasing flood stages more of its market value, it shall not be <br /> than 0.5 feet. An equal degree of en- reconstructed except in conformity with <br /> croachment on both sides of the stream the provisions of this Ordinance. <br /> within the reach shall be assumed. However,the City may issue a Special <br /> c. Based upon the technical Use Permit for reconstruction if the use <br /> evaluation of the City Engineer,the City ,is located outside the floodway and,upon <br /> shall determine whether the proposed reconstruction, is adequately flood- <br /> use is in the floodway or flood fringe and proofed, elevated, or otherwise <br /> the regulatory flood protection elevation protected in conformity with Section 320- <br /> at the site. 28,Subd.D(6). <br /> (3).Procedures to be Followed by the 6.Except as provided in Section 320- <br /> City in considering Special Use Permit 29, A, 5, any use which has been per- <br /> Applications <br /> erApplications Within all Flood Plain mitted as a Special Use shall not be <br /> Districts considered as a Nonconforming Use. <br /> a.Require the applicant to furnish 7. Nonconforming Uses located in <br /> such of the following information and the Floodway District shall be <br /> additional information as deemed eliminated or brought into conformity <br /> necessary by the City for determining with the standards contained in this <br /> the suitability of the particular site for Ordinance within a reasonable period of <br /> the proposed use: time as determined by the City,after a <br /> i. Plans in triplicate drawn to hearing for each such Nonconforming <br /> scale showing the nature, location, Use. The City shall make its deter- <br /> dimensions, and elevation of the lot, mination upon the basis of the normal <br /> existing or proposed structures, fill, useful life of any improvement upon the <br /> storage of materials, floodproofing premises. In addition, the monetary <br /> measures, and the relationship of the value of any competitive advantage <br /> above to the location of the channel. derived by the operation of such Non- <br /> ii. Specifications for building conforming Use, by reason of the <br /> construction and materials, flood- limitation on establishment of corn- <br /> proofing, filling, dredging, grading, peting businesses as a result of this <br /> channel improvement, storage of Ordinance, shall be consideredas a <br /> materials, water supply and sanitary reduction of losses resulting from the <br /> facilities. requirements of termination of the use <br /> b. Transmit one copy of the in- under this Ordinance. <br /> formation described in Section 320-28, 8. The Zoning Administrator shall <br /> Subd.D(3)to the City Engineer where prepare a list of those Nonconforming <br /> necessary in evaluating the proposed Uses which have been floodproofed or <br /> project in relation to flood heights and otherwise adequately protected in <br /> velocities, the seriousness of flood conformity with Section 320-28,Subd.D <br /> damage to the use,the adequacy of the (6).He shall present such list to the City <br /> plans for protection,and other technical which may issue a certificate to the <br /> matters. owner stating that such uses,as a result <br /> c. Based un the technical of these corrective measures; are in <br /> evaluation of the City Engineer,the City conformity with the provisions of this <br /> shall determine the specific flood hazard Ordinance. <br /> at the site and evaluate the suitability of 320-30. PENALTIES FOR <br /> the proposed use in relation to the flood VIOLATION.Violation of the provisions <br /> hafard. of this Ordinance or failure to comply <br /> (4) Factors Upon Which the Decision with any of its requirements(including <br /> of the City Shall Be Based. In con- violations of conditions and safeguards <br /> sidering Special Use applications, the established in connection with grants of <br /> City shall consider all relevant factors Variances or Conditional Uses) shall <br /> specified <br /> naified in other sections of this Or- constitute a misdemeanor punishable as <br /> dinance,and: ' provided in Chapter 230 of the Hugo City <br /> a.The danger to life and property Code.Each day such violation continues <br /> due to increased flood heights or shall be considered a separate offense. <br /> velocities caused by encroachments. Nothing herein contained shall <br /> b.The danger that materials may be prevent the City from taking such other <br /> swept onto other lands or downstream to lawful action as is necessary to prevent <br /> the injury of others. or remedy any violation. <br /> c. The proposed water supply and 320-31. AMENDMENTS. The flood <br /> sanitation systems and the ability of plain designation on the Official Zoning <br /> these systems to prevent disease, Map shall not be removed from flood <br /> contamination, and unsanitary con- plain areas unless it can be shown that <br /> ditions. the designation is in error or that the <br /> d.The susceptibility of the proposed area has been filled to at or above the <br /> facility and its contents to flood damage elevation of the regional flood and is <br /> and the effect of such damage on the contiguous to lands outside the flood <br /> individual owner. plain. Special exceptions to this rule <br /> e. The importance of the services may be permitted by the Commissioner <br /> provided by the proposed facility to the of Natural Resources if he determines <br /> community. that,through other measures,lands are <br /> f. The requirements of the facility adequately protected for the intended <br /> for a waterfront location. use. <br /> g. The availability of alternative All amendments to this Ordinance <br /> locations not subject to flooding for the including such amendments to the Of- <br /> proposed use. ficial Zoning Map which relate to flood <br /> h.The compatibility of the proposed plain designation must be submitted to <br /> use with existing development and and approved by the Commissioner of <br /> development anticipated in the Natural Resources prior to adoption. <br /> foreseeable future. Changes in the Official Zoning Map also <br /> i.The relationship of the proposed require prior approval by the Federal, <br /> use to the comprehensive plan and flood Insurance Administration. <br /> plain management program for the 320.32.FEES. <br /> area. a. The fee for the application for <br /> j. The safety of access to the Special Use Permit shall be set by <br /> property in times of flood for ordinary resolution of the City Council. <br /> and emergency vehicles. b. The applicant shall also be <br /> k. The expected heights, velocity, responsible for engineering expenses <br /> duration, rate of rise, and sediment incurred by the City relative to his ap- <br /> transport of the flood waters expected at plication, <br /> the site. Upon adoption, approval, and <br /> 1. Such other factors which are publication according to law,the Hugo <br /> relevant to the purposes of this Or- City Code and the Zoning Map will be <br /> dinance. amended to reflect the provisions of this <br /> (5) Time for Acting on Application. Ordinance. <br /> The City shall formally consider an Adopted this 30 day of October,1978. <br /> application in the manner above Voting for: <br /> described with 60 days from receiving Against: <br /> the application,except that where ad- /s/Marvin LaValle <br /> ditional information is required pm-- Mayor <br /> suant to this Ordinance the City may Attest: <br /> provide for an extension.The City shall /s/Carol A.Williams <br /> render a decision with 45 days from the Clerk <br /> formal consideration. <br /> (6)Conditions Attached to Special Use (Published in the Forest Lake Times, <br /> Permits. Upon consideration of the November 22&30,1978.) <br /> factors listed above and the purposes of <br /> this Ordinance,the City may attach such <br /> conditions to the granting of Special Use <br /> Permits as it deems necessary to fulfill <br /> the purposes of this Ordinance. Such <br /> conditions may include, but are not <br /> limited to,the following: <br /> a. Modification of waste disposal <br /> and water supply facilities. <br /> b. Limitations on period of use, <br /> occupancy,and operation. <br /> c. Imposition of operational con- <br /> trols,sureties,and deed restrictions. <br /> d.Requirements for construction of <br /> channel modifications, dikes, levees, <br /> and other protective measures. <br /> e. Flood proofing measures, in <br /> accordance with the State Building <br /> Code.The applicant shall submit a plan <br /> or document certified by a registered <br /> professional engineer or architect that <br /> the flood proofing measures are con- <br /> sistent with the regulatory flood <br /> protection elevation and associated flood <br /> factors for the particular area. <br /> 320-29.NONCONFORMING USES. <br />