Laserfiche WebLink
(b) Streams or other bodies of water <br /> 100 feet <br /> (c) Occupied buildings 20 feet <br /> (d) Large trees (see alternate in Subd. D, <br /> No. 6 , (d) 10 feet <br /> (e) Property lines or buried pipe <br /> distributing water under pressure <br /> 10 feet <br /> (2) When coarse soil formations are encountered, <br /> the distances specified in this Subd. D (1) <br /> shall be increased appropriately. <br /> (3) A distribution box with removable cover and <br /> of sufficient size to accommodate the <br /> necessary tile field lateral lines shall be <br /> constructed at the head of each disposal <br /> field. <br /> (a) Each tile field lateral line shall be <br /> connected separately to the distribution <br /> box and shall not be subdivided. <br /> (b) The inverts of all outlets shall be at <br /> the same elevation, and the inlet <br /> invert shall be at least one inch <br /> above the outlet inverts. <br /> (c) The outlet inverts shall be at least <br /> four (4) inches above the distribution <br /> box floor for the purpose of securing <br /> equal distribution of the septic tank <br /> effluent to each tile lateral. <br /> (d) In the event that septic tank effluent <br /> is delivered to the distribution box <br /> by pump or siphon, a baffle wall shall <br /> be installed in the distribution box. <br /> The baffle shall be secured to the <br /> bottom of the box and shall extend <br /> vertically to a point at least level <br /> with the crown of the inlet pipe. <br /> The plane surface of the baffle shall <br /> be perpendicular to the inlet flow line. <br /> -9- <br />