My WebLink
|
Help
|
About
|
Sign Out
Home
1980.10.06 CC Minutes
Hugo
>
City Council
>
City Council Minutes
>
1980 CC Minutes
>
1980.10.06 CC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 10:29:05 AM
Creation date
11/6/2015 10:29:04 AM
Metadata
Fields
Template:
City Council
Document Type
Minutes
Meeting Date
10/6/1980
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 111 <br /> October 6, 1980 <br /> 5.3 Benson Kennel - Change in Building Structure <br /> The original plan for the kennel was for construction of an all-block building. <br /> Mr. Barbour stated that because of financial reasons, he is contemplating a <br /> change in the wing sections from block to metal. The metal wings will be en- <br /> tirely insulated, and should have the same limitations in regard to the noise <br /> factor. The center section of the building will be block. Barbour is proposing <br /> construction of the building in three pases: 1 ) the first wing to be con- <br /> structed immediately, 2) the center section within one year, and 3) the last <br /> wing at an unknown time. Planning Commission member, McAllister, requested the <br /> matter be tabled because of a:-possible change in ownership of the business. <br /> Barbour stated that Mr. Benson is approaching 80 years old, and would remain <br /> in the business operation, but not actively or financially. Engineer Kuusisto <br /> reviewed the perc tests for the kennel, and found them to be adequate. <br /> MOTION: Spitzer made motion, seconded by Irsfeld, to amend the conditions of <br /> the Special Use Permit for Benson Kennels as follows: <br /> 1 . The building to be constructed will be a combination of metal and block, <br /> as indicated on the plans submitted. <br /> 2. The metal portion, indicated as Phase 1 , will be completed by December. 31 , <br /> 1980, and block and frame building' indicated as Phase 2, will be completed <br /> by December 31 , 1981 . The metal wing, indicated as Phase 3, will be built <br /> only upon amendment of this Special Use Permit. <br /> 3. Should Phase 2 not be completed on or before December 31 , 1981 , the Special <br /> Use Permit granting a commercial kennel operation shall become null and <br /> void. If Phase 1 is not completed on or before December 31 , 1980, the <br /> entire Special Use Permit shall become null and void. <br /> 4. This permit shall be reviewed by the City Council for compliance to these <br /> conditions in January of 1981 and January, 1982. <br /> 5. The entire Special Use Permit shall be null and void unless agreed to by <br /> applicant no later than October 31 , 1980. <br /> VOTING FOR: LaValle, Spitzer, Schletty, Irsfeld, Vail <br /> MOTION CARRIED <br /> 5.4 A & B Construction - Special Use Permit (Public Hearing 7:30 PM) <br /> Public hearing called to order by Mayor LaValle at 7:40 PM. Mr. Atkinson, <br /> A & B Construction, withdrew his application of the permit to allow for a mobile <br /> home and residence in the Industrial zone. <br /> MOTION: Spitzer made motion, seconded by Irsfeld, to close the public hearing <br /> at 7:41 PM. <br /> VOTING FOR: LaValle, Spitzer, Schletty, Irsfeld, Vail <br /> MOTION CARRIED <br /> MOTION: Spitzer made motion, seconded by Vail, that upon the implied petition <br /> Of the applicant, the A & B Construction application is vacated. <br /> VOTING FOR: LaValle, Spitzer, Schletty, Irsfeld, Vail <br /> MOTION CARRIED <br />
The URL can be used to link to this page
Your browser does not support the video tag.