My WebLink
|
Help
|
About
|
Sign Out
Home
2016.01.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2016 CC Packets
>
2016.01.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2016 9:43:23 AM
Creation date
1/5/2016 3:50:09 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
1/4/2016
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Criteria of approval of a solar farm. An application for a solar farm interim use permit may <br />be granted only upon finding that all of the following criteria have been met: <br />a. The applicant owns the property or has secured a proper lease agreement on the <br />property, unless the City Council determines that unique conditions or circumstances <br />warrant special arrangement. <br />b. The proposed solar farm is allowed as a principle use in the respective zoning district <br />and conforms to this chapter. <br />c. The proposed solar farm is keeping with the spirit and intent of this chapter. <br />d. The construction of a solar farm shall not impede the City's ability to implement its <br />comprehensive plan. <br />e. The proposed solar farm is compatible with the present character of the surrounding <br />area. <br />f. The proposed solar farm shall have a set date in which the permit shall be reviewed <br />or terminated. <br />g. The proposed solar farm shall be subject to any conditions that the City Council <br />deems appropriate for the permission of the use. <br />(4) Conditions of approval. In permitting a new solar farm interim use permit or amending an <br />existing solar farm interim use permit, the Planning Commission may recommend and the <br />City Council may impose additional conditions and requirements to protect the health, safety, <br />and welfare of the surrounding area and the community at large, mitigate unfavorable <br />consequences of activities resulting from the solar farm, enforce laws and regulations, and <br />ensure compliance with the conditions of the permit. These conditions may include, but are <br />not limited to, the following: <br />a. Limitations on period of use and operation. <br />b. Buffering and screening measures. <br />c. Approval periods between one to twenty-five years. <br />(5) Renewal of a solar farm interim use permit. Because of its temporary nature, an interim <br />use permit for a solar farm shall not be renewed. Continuation of a solar farm beyond the <br />date of expiration of its interim use permit requires approval of a new interim use permit. <br />(6) Interim use permit nontransferable. Solar farm interim use permits do not run with the <br />land. The permit is not transferable from person-to-person, and shall expire if there is a <br />change in ownership of the property, unless the following conditions are met: <br />a. The new permit holder must own the property or have a written lease agreement with <br />the property owner stating the land will continue to be used for the production of <br />energy via a solar farm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.