My WebLink
|
Help
|
About
|
Sign Out
Home
2015.02.10 EDA Agenda Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2015 EDA Packets
>
2015.02.10 EDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 9:42:31 AM
Creation date
1/11/2016 8:59:49 AM
Metadata
Fields
Template:
Commissions
Meeting Date
2/10/2015
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Concept Two: <br />• Least liked concept. <br />• Don't like the massive parking lot on the west end —this would just be more parking for <br />the assisted living residents to look at which would not be appreciated. <br />• Skate park too far away from viewing. <br />• Parking is too far away from the main pavilion. <br />• Feel the playground and splash pad need to be close to each other. <br />• Don't like Fitzgerald completely cut off. <br />Concept Three: <br />• Liked the alignment of parking, memorial and shelter in relation to City Hall but should <br />verify with City employees that the parking lot modifications are acceptable. <br />• Like the long linear green space that can be separated for different uses at the same time. <br />• Move skate park just north of the parking lot by City Hall for better viewing. <br />• Like that Fitzgerald goes through but the parking lot design makes them slow down to <br />maneuver. <br />• Like the curvilinear parking lot on the west side that is more appropriate for a park rather <br />than one massive parking space. <br />• Would like the general skating to meet up to the main pavilion. <br />• Assisted housing may appreciate active site use for residences to view. <br />• Off street parking along 146' street is appreciated for quick parking or drop-off/delivery <br />(location adjacent to active park elements). <br />Updated Proiect Schedule: <br />Conceptual Design <br />• Early January: Meet with stakeholders to discuss conceptual plans <br />• January 14th: Parks, Recreation and Open Space Commission Meeting — City to provide <br />project update to the Commission members. <br />• February 2"d: City Council Meeting — City to provide the three concept plans and <br />comments to the City Council for comment. <br />Master Plan design <br />• WSB to prepare one refined/preferred master plan design with estimate of probable costs <br />• February 1 Vh: Parks, Recreation and Open Space Commission Meeting — WSB to present <br />Preliminary Master Plan for review and comment. <br />• February 16d': City Council Meeting — WSB to present Preliminary Master Plan for <br />review, comment and adoption. <br />
The URL can be used to link to this page
Your browser does not support the video tag.