Laserfiche WebLink
Figure 5.8 of the TPP <br />Identified Projects"" in Highway Current Revenue Scenario <br />Reference Items <br />\� Principal Arterial Highways <br />Other Trunk Highways <br />Rivers <br />City Boundary <br />County Boundary <br />2040 urban SeNka Ares <br />MPO Area <br />*Not intended to represent <br />allprojects until 2040. <br />lndudes only those projects <br />identified by May 2014. <br />Su*cf to change and <br />amendment <br />0 5 10 20 Nfiles <br />0 2015-2018 TIP Bridges <br />2019 - 2024 Bridges <br />OV440 Strategic Capacity <br />Roadside Infrastructure <br />Roadside Infrastructure 1 Safety <br />2015-2018 TIP Pavement <br />Ora 2019 - 2024 Pavement Projects <br />*01%w/ 2015 - 2018 Pavement 1 MnPass <br />#'%/ 2015 - 2018 Pavement 1 Safety <br />Tier 1 MnPASS Expansion <br />Page- 14 1 2015 SYSTEM STATEMENT— HUGO TRANSPORTATION <br />