Laserfiche WebLink
Figure 6-9 of the TPP <br />Increased Revenue Scenario Transitways <br />Building an Accelerated Transitway Vision <br />Reference Items <br />Principal Arterial Highways <br />'115 <br />%*Northstar Line <br />Other Tfunk Highways <br />v.� <br />Arterial BRT <br />Lakes and Rivers <br />Accelerated Transitways <br />under study <br />♦00 Red Line <br />City Bandary <br />Orange Line <br />Regional Multimodal Hub <br />Gold Line <br />County Boundary <br />2010 Urban Service Area <br />MPO Area <br />_Fn <br />1n <br />a <br />4 hu.ra <br />Cap.rer <br />0 <br />5 10 20 Miley <br />t I r i i 1 <br />%*Northstar Line <br />Accelerated <br />Blue Line <br />Arterial BRT <br />Green Line <br />Accelerated Transitways <br />under study <br />♦00 Red Line <br />mode and alignment <br />not yet specified <br />Orange Line <br />Regional Multimodal Hub <br />Gold Line <br />0."iafS'a� <br />W N <br />Nov 2014 <br />A <br />Increased Revenue Scenario would <br />also include at least 1% average <br />annual bus expansion. <br />Page - 17 1 2015 SYSTEM STATEMENT — HUGO TRANSPORTATION <br />