Washington <br />County It-Huea <br />IMPROVEMENTS UPDATE <br />Rice Lake Meadows: As part of the City's C.I.F. for streets, the City <br />removed pavement and spot repaired concrete curb and gutter in <br />the Rice Lake Meadows Development. This project started the week <br />of July 7th with minor improvements to the utility infrastructure followed <br />by pavement removal and replacement. A sidewalk was installed along <br />145th St. and Geneva Ave., which will ultimately connect to TH 61. <br />This project is anticipated to be completed by the first week in September. <br />ROAD <br />CLOSED <br />mis <br />DETOUR % <br />Finale Avenue: As part of the Senior Living project the City reconstructed <br />Finale Ave. from 145th St. to 146th St. This project is scheduled to be <br />completed by the first week in September. <br />County Road 7 and 8 Intersection Alignment: The City is working <br />cooperatively with Washington County on this project, which is scheduled <br />to start August 24th. This section of roadway will be completely closed to <br />through traffic for the duration of construction. A detour will be posted <br />to help traffic around the construction area. This project is scheduled for <br />completion by mid- September. <br />Seal Coating: The City will be seal coating the roadways east of Oneka <br />Lake Pkwy. to T.H. 61 from 159th St. N, south to 157th Way N. <br />- ems! <br />�� 1111111111M, <br />Become <br />Better <br />Int <br />Wellhead <br />Protectii <br />The City has <br />been <br />taking <br />steps to protect local <br />their current <br />Wellhead <br />Protection Plan and v <br />of the Plan <br />is to identify <br />and <br />manage potential <br />to the City <br />wells. <br />The <br />City's <br />Wellhead Proted <br />federal resource <br />staff <br />and <br />will be ultimately apr <br />The City will <br />be doing <br />a variety <br />of education ar <br />Become better <br />informed <br />about wellhead protei <br />•Y <br />a�j <br />LAM <br />' �`I <br />'� <br />Finale Avenue: As part of the Senior Living project the City reconstructed <br />Finale Ave. from 145th St. to 146th St. This project is scheduled to be <br />completed by the first week in September. <br />County Road 7 and 8 Intersection Alignment: The City is working <br />cooperatively with Washington County on this project, which is scheduled <br />to start August 24th. This section of roadway will be completely closed to <br />through traffic for the duration of construction. A detour will be posted <br />to help traffic around the construction area. This project is scheduled for <br />completion by mid- September. <br />Seal Coating: The City will be seal coating the roadways east of Oneka <br />Lake Pkwy. to T.H. 61 from 159th St. N, south to 157th Way N. <br />- ems! <br />�� 1111111111M, <br />