My WebLink
|
Help
|
About
|
Sign Out
Home
2000.06.14 Parks Minutes
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Minutes
>
2000 Parks Minutes
>
2000.06.14 Parks Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 8:41:39 AM
Creation date
1/11/2016 3:49:39 PM
Metadata
Fields
Template:
Commissions
Meeting Date
6/14/2000
Document Type
Minutes
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks Commission Meeting 6-14-00 <br />Minutes <br />Hugo, Minnesota <br />Parks and Recreation Open Space Commission Meeting <br />June 14, 2000 <br />6:30 p.m. <br />Firstar Hugo Bank Building <br />No. A-HUG000009.00 <br />Meeting Chair: Robynn LaCasse <br />Minutes By: Laurie McRostie <br />Page 1 of 2 <br />Present: Robyn LaCasse, Bunny Peterson, Nancy Chelmo, Bronwen Kleissler, Peter Pedersen, David <br />Strub, Laurie McRostie <br />Absent Chuck Haas <br />Copies To: Commission Members, Michele Lindau - Deputy City Clerk <br />Sunset Lake — Dave Snyder reviewed the deeds and it appears that the City could sell the properties or <br />do whatever they would like to with them. The City Council has approved closing the entrance and Chris <br />Petree will put up a concrete barrier and a sign. The Parks Commission needs to study this problem and <br />recommend solutions to the City Council. <br />Il. The City Council authorized the preparation of the City maps. These maps should be available by late <br />August. <br />III. The Water Tower Site at 130th and Fenway Boulevard was reviewed. The parking lot arrangement was <br />revised and the small lot will be located at the end of the entry drive. The contractor for Townhomes of <br />Bald Eagle Lake is going to be parking his trailer on the site for the duration of the project. The <br />agreement with the City is that the contractor would leave class 5 in the drive going out to 130th. Parks <br />does not want access to 130th and the loop through is not needed by Public Works. Laurie will contact <br />the contractor and coordinate the placement of gravel and discuss the grading that is required on the site. <br />IV. Beaver Ponds — we are now waiting for a quote to seed and fine grade the park from the irrigation <br />contractor. It has been very difficult to get some one to work on this job. Laurie still needs to get <br />property maps for the Hauble property and plan the park expansion. <br />V. The topography and wetland maps for the Mallinger piece were reviewed. This property has very little <br />high ground and a DNR controlled wetland in the middle of it. We will not be pursuing this property for <br />parkland at this time. <br />http://www.ci.hugo.mn.us/Parks_Recreation/minutes/06.14.00.htm 10/3/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.