My WebLink
|
Help
|
About
|
Sign Out
Home
2015.06.10 Parks Minutes
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Minutes
>
2015 Parks Minutes
>
2015.06.10 Parks Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 2:14:31 PM
Creation date
1/12/2016 1:22:20 PM
Metadata
Fields
Template:
Commissions
Meeting Date
6/10/2015
Document Type
Minutes
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes <br />Parks Commission, City of Hugo <br />June 10, 2015 <br />7:01 P.M. <br />Council Chambers, City Hall <br />Call to Order <br />Present: Cinde Morris, John Pontrelli, Dave Strub, Ranell Tennyson, Nicole Schmid, Tom <br />Windisch <br />Absent: Mat Rauschendorfer <br />Staff Present: Shayla Denaway, Parks Planner <br />Scott Anderson, Public Works Director <br />Debi Close, Secretary <br />I. Approval of Minutes from May 13th, 2015 Meeting <br />Pontrelli made a motion, Strub seconded to approve the minutes of May 13, 2015 Parks <br />Commission meeting. <br />Aye: Morris, Pontrelli, Strub, Tennyson, and Schmid <br />Abstained: Windisch <br />Motion carried. <br />II. RC Car Proposal from Steve Hanke <br />Steve Hanke presented a proposal to build a radio controlled car and truck race track and <br />driving area at Irish Avenue Park. The RC cars and trucks would be primarily battery powered <br />with electric motors. Hanke demonstrated how an RC car sounds as it is driven and shared that <br />they are quiet and would not disturb neighbors, horseback riders, walkers, dogs, etc. The <br />hobby is for kids of all ages but primarily ages 10 and up. Because the average run time per <br />battery is 15 minutes, a driver would be at the park for approximately 60 to 90 minutes at a time. <br />The track would be built and maintained by volunteers. It would be temporary and easy to move <br />or re -locate. The suggested track size is 100' by 40' with a practice driving space. Hanke <br />proposed that the track be constructed near the existing parking lot. Hanke asked for support <br />
The URL can be used to link to this page
Your browser does not support the video tag.