My WebLink
|
Help
|
About
|
Sign Out
Home
2014.07.14 RESO 2014-19
Hugo
>
City Council
>
City Council Resolutions
>
2014 CC Resolutions
>
2014.07.14 RESO 2014-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:52 PM
Creation date
1/8/2015 4:27:47 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
7/14/2014
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2014-19 <br />APPROVING A SITE PLAN FOR NEW LIFE CHURCH FOR CONSTRUCTION <br />OF A BUILDING ADDITION ON THE PROPERTY LOCATED AT 6000148TH <br />STREET NORTH <br />WHEREAS, New Life Church has requested approval of a site plan for a construction of <br />a building addition to the church and is legally described as follows: <br />(See Attached) <br />WHEREAS, the Planning Commission has reviewed said site plan on June 26, 2014, and <br />recommends approval subject to the conditions listed in this resolution. <br />NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF <br />THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the site <br />plan for New Life Church for construction of a building addition with the following <br />findings: <br />1. A site plan is approved to allow construction of an approximately 4,560 square foot <br />building addition to the church in accordance with the plans dated May 20, 2014, and <br />June 5, 2014, except as amended by this resolution. <br />2. If parking issues occur, additional parking shall be constructed as deemed necessary <br />by the City. <br />3. The applicant will be responsible for the City's water and sewer trunk fees, as well <br />the water (WAC) and sewer (SAC) connection fees to be paid at the time of the <br />building permit. The applicant will also be responsible for the Met Council sewer <br />connection fee (Met Council REC). <br />4. The applicant shall obtain all necessary local, state, and federal permits. <br />Prior to commencement of any grading or site development work: <br />5. All items on the Engineer's memo and "red -line" detailed engineering comments that <br />have been sent directly to the applicant's engineer dated June 18, 2014, shall be <br />addressed. <br />Prior to the issuance of a building permit: <br />6. The gutters and downspouts shall be integrated into the building design and shall be <br />reviewed and approved by staff. <br />7. A landscape plan shall be reviewed and approved by staff. <br />8. Cut -sheets of pole or wall mounted lights to be installed shall be reviewed and <br />approved by staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.