HomeMy WebLinkAbout2007.10.01 RESO 2007-0053RESOLUTION NO. 2007-53
RESOLUTION OF THE CITY OF HUGO,
WASHINGTON COUNTY, MINNESOTA, REGARDING SANITARY SEWER
MAINTENANCE POLICY
WHEREAS, the City is served by a system of sanitary sewer improvements which include,
sanitary sewer lines and mains, lift stations and other related equipment; and
WHEREAS, the City desires to establish a routine and organize a policy to provide the City
of Hugo procedures for maintaining its sanitary sewers in order to assist and prevent sewer backup
into homes, businesses and the natural environment and to protect and extend the life of the City's
sanitary sewer system and the investment therein.
NOW, THEREFORE, be it resolved that by the City Council of the City of Hugo,
Washington County, Minnesota as follows:
1. The attached policy is adopted until modified or rescinded.
WHEREUPON the following members voted in favor: Mike Granger, Chuck Haas,
Becky Petryk, Frank Puleo, and Fran Miron
WHEREUPON the following members voted against: NONE
This Resolution was declared duly passed and adopted and signed by the Mayor and City .
Council this 1 s'day of October, 2007.
i
ATTEST:
Mary reager, City Clerk 61
Hugo.
p 11889 FRngerW AVWW North
WW. MN 55838
Rwa (651) 762.6390
Fu(651)425-MO Sanitary Sewer Maintenance Policy
1. Puroose
The purpose of the policy is to provide the City of Hugo procedures for
maintaining its sanitary sewer system. These procedures are necessary to
prevent sewer backups into homes, businesses and the natural environment.
Maintenance protects and extends the life of the City's sanitary sewer system.
The City will provide such maintenance in a safe and cost effective manner,
keeping in mind environment concerns, personnel, budget and safety.
Maintenance will be done by private contractors, equipment and City
employees.
2. Routine Maintenance and insuection
A. Sanitary Sewer Lines -
1. Scope of City's responsibility — The City sanitary sewer lines
will be maintained by the city and private property owners are
responsible for maintaining private lines from the City's main
lines to any buildings.
2. Schedule — Each City sanitary sewer line will be cleaned every
three years by the City.
3. Problem Area — Defined as an area known to have problems
such as grease accumulation, shallow slope, blockage or
backups .These areas will be cleaned once per year, unless
more frequent cleaning is necessary. A chemical or proofer
may be used in sanitary sewer lines to help with grease build
UP.
4. Equipment — A jetter machine will be used to clean the sewer
lines. Depending on location, type of pipe and if a known
problem exists will determine what type of cleaning method
will be used.
5. Television Inspection — A television camera will inspect the
sanitary sewer system lines every ten years. All sanitary sewer
lines that are on a street maintenance project will be televised /
recorded and inspected prior to the project. The City will
televise / record and inspect all sanitary sewer lines in new
developments before the City will accept them as city lines. A
camera will be available to inspect sanitary sewer lines for
possible problem areas.
6. Visual Inspection — A visual inspection of the sanitary sewer
lines will be done every three years by looking down the
manholes to determine if there are any problems by City
employees.
7. Flushing Inspection — Every dead end manhole will be flushed
every three years to clean out the sanitary sewer line and
determine if there are any problems with flow.
B. Sanitary Sewer Lift Stations —
1. Schedule — A monthly maintenance checklist on each lift station will
be done by the City and may differ at each lift station. Monthly
checklist include checking all alarms, alarm lights, floats,
control systems, motors, piping, sump pump operation,
blower/air exchange system, transducer, bubbler, air
compressor and greasing.
2. Electrical Component — Lift station electrical components will be
inspected and maintained by an electrician annually.
3. Operations — The hour meters at each lift station will be checked on
a daily basis to ensure the lift stations are working properly and
to detect any problems in the system. The City also uses a
SCADA system to monitor all lift stations.
3. Emeraenev Response
A. Definition — Response to a call from an alarm, employee or citizen that
indicates there is a problem in the sanitary sewer system.
B. Response — After being notified about the problem, a City employee will
respond within one hour to determine if there is a problem with
the City's sanitary sewer system. If a problem does exist the
employee will remedy the problem by himself / herself, other
City employees or contractor.
4. Inflow / Infiltration
A. Definitions — Inflow is where rain water is discharged into a sanitary sewer
system by catch basins, manhole covers, sump pumps and roof
leaders. Infiltration is ground water entering the sanitary sewer
system through joints, cracks in pipes or manholes. Inflow and
2
t � s
infiltration can lead to backups, over flows, and unnecessary
expenses to treat storm water.
B. Inflow — Reducing inflow will be done by enforcing an ordinance banning
illegal connections to the sanitary sewer system and public
education to encourage voluntary compliance.
C. Infiltration — Reducing infiltration will be done by routine maintenance
and inspection found in section 2 of this policy. Manholes will
be inspected every three years by the city employees and those
that contribute to the problem will be repaired.
5. Training
Training on proper use of equipment and procedures to follow will be
provided by the city for those employees that will be involved in routine
maintenance and emergency responses on a regular basis.
6. Work Schedule for City Employees
At the discretion of the Public Works Director, public works employees will
be expected to work eight hour shifts Monday - Friday from October 1 st —
March 31st. Ten hour shifts will begin April lst — September 3& with one half
of the city employees working Monday — Thursday and the other one half
working Tuesday — Friday. In emergency situations employees sometimes
have to work over- time, but may be limited to over time hours do to budget
and safety concerns.
7. Weather Conditions
Sewer maintenance operations will be conducted only when weather
conditions do not endanger the safety of City employees and equipment.
Factors that may delay sewer maintenance operations include severe cold,
flooding, snow and wind.
8. Documentation
The City will document all sanitary sewer system inspections, maintenance,
emergency responses and any circumstances where something has occurred
that limits the compliance with this policy. These records will be kept in
accordance with the City's record retention schedule.
ADOPTED BY THE HUGO CITY COUNCIL ON OCTOBER 1, 2007.