Loading...
HomeMy WebLinkAbout1995.02.01 CC Minutes - Joint meeting with Lino LakesM I NL TE UF= THE HL GU/L'I NU L...AKES JU I NT-OUNf." L. MEET I PJG OF FEBF;LJF iF:Y i . 1995 Pursuant to due call and notice thereof, the Hugo and Lino Lakes City Councils held a joint meeting at the White Bear Country Inn. White Bear, Minnesota. Lino Lakes Mayor Reinert called the meeting_ to order at 8:13PM. PRESENT: Lino Lakes - Mayor Reinert; Council members k:uether, Elliot, Bergeson, Neal; Administrator Schumacher; Engineer Powell; residents Cyril LaCasse, Tom L.aCasse, Jay Cain. Hugo - Mayor Miron; council members Barnes, Goiffon, Leroux, L._aVal le; Administrator Museus; Engineer Dresel. Orr, . Schelen, Maeron and Associates (OSM) representative yt. W.i..l 1 enbring . CLEARWATER CREEK DRAINAGE OSM Engineer Wi l lenbring made a presentation following a letter dat.eci February 1, 1995 titled "Preliminary Findings and Recommendations Associated with Hydrologic Study for Clearwater Creek Watershed (:J'SM Project No 5465.06". A copy of this letter is attached to and made a part of these minutes. It was noted that wetlands make up approximately 20 1,500 acres) of the subject area. Three options reviewed were as follow.: 1. Restriction of flow from Bald Eagle Lake. Minimum benefits would be obtained from this caption. 2. Effective use of wetlands as storage areas. It m+..+.s:-t be determined whether the current wetland areas remain full or if they empty between storms. It .is important that the wetlands are drawn down after storms to ensure future capacity. _. Utilize storage areas within Clearwater Creek itself. It may be beneficial to increase the "low flow" within the creel:: system. The most restrictive creed: area is under Interstate 05F.. It would be a goal that the flow underneath Interstate 05E: be less than 500 cubic fleet per second to prevent overtopping of 35E. Options and recommendations of OSM Engineers with regard to financing wee: 1. As development takes place, require the developer to construct on site ponding utilizing existing wetlands or constructing holding areas, limiting discharge rates. 2. Require monetary contributions from developers that would be dedicated to a fund to increase storage capacity. This could include improvements such as on site drainage, regional facilities, and/or within the drainageway. It appeared to be the recommendation of OSM Engineers that the cities consider incorporating both options. Hl::lyUNQU LOW Minutes - February 1, 1995 Page 2 OSM Engineer Willenbring responded to several questions and answers from Council and audience members as follows: - It may be possible to construct an additional culvert to handle low -flow conditions, creating additional capacity underneath 35E (5 to 15 years into the future). - The Rice Creek Watershed District (RCWD) has been briefly updated, but it would be appropriate to obtain direction from the City Councils prior to "selling" the project to the RCWD. - The RCWD probably would not support an increase in capacity or peak rate across 35E, but may be more receptive to downstream improvements. - It would be important to assure wetland draw down, versus draining of the wetlands. Of concern is the Wetland Conservation Act. - Increasing the amount of wate=r- in wetlands during storms and controlling runoff is the most cost effective way to deal with drainage concerns with the subject area. - The most effective utilization of water storage is within the em i.sting wetlands. - It would be a goal to drain water out of wetlands between storm events to ensure storage. - The proposed Lino Lakes development south of Cedar Street and west of Elm Street will not significantly affect this proposed drainage concept. - Funding will be the most difficult issue. - It would be appropriate to meet with representatives from the City of Centerville if the Councils from Hugo and l....i.no (....cakes would like to promote this drainage concept. - The issues that the RCWD will be considering are ditch laws, wetland issues, development of a regional ponding area and controlled runoff. Hugo Administrator Museus summarized the proposed process to include three issues: 1. Low flow under Int:.erstat:.e -SSE 2. Rechannelizing Clearwater Creek 3. Regulating development_ to improve wetland storage. OSM Engineer Willenbring advised that if the Hugo and Lino Lake City Councils are comfortable with the project, the planning process could be completed through the following Steps: 1. Identify the project as high priority. 2. Present to project to the RCWD. 3. Discuss the project with the City of Centerville. 4. Prepare a preliminary draft plan for the Cities of Hugo and Lino Lakes to review. 5. Draft a Joint Powers Agreement. (JPA). Hugo Administrator Museus noted that Clearwater Creek has not been cleaned since 1958. He suggested that the RCWD help pay for the cost of creek improvements. OSM Engineer Willenbring suggested that possibly the RCWD could abandon the Creek as a judicial ditch and redesignate it as a municipal ditch. He did express concern that other contiguous cities may want to continue the Creek as judicial. Hugo/Lino Lakes Meeting - February 1, 1995 Page = Lino Lakes Administrator Schumacher suggested that before a JPA is drafted, it may be beneficial for each City to independently discuss financing issues and funding resources. OTHER RELATED DEVELOPMENT ISSUES Hugo Engineer Dresel outlined transportation plan issues which may be in conflict with those of the City of Lino Lakes. The area in question is south of Frenchman Rd., east of Elmcrest Ave., north of 130th Street, and west of High 61. The Hugo transportation plan calls for east/wes-.t extensions within the above area. Lino Lakes Engineer Powell, advised that the City of Liao Lakes .is trying to discourage through traffic from west of Elmcrest Ave. (area of a proposed housing development) and the City of Hugo is trying to utilize the area as a thoroughfare. Hugo Administrator Museus noted that all traffic in this area is through residential streets Hugo is trying to create east/ west routes to decrease vehicular traffic through residential neighborhoods. Lino Lakes Engineer Powell expressed concern that the Hugo Transportation plan will increase traffic through Lino Lakes residential developments=. (i.e. proposed Elmcrest subdivision). It was noted that through the Hugo municipal water- system, there arc-. opportunities for the City of Lino Lakes to ;hare water to service the proposed Elmcrest s=ubdivision in Lino Lakes. The City of Lino Lakes will prepare a feasibility study for an elevated water tower in the Interstate :_•:,0- area. The study would address fire flow needs of future commercial, industrial, and residential development. It may be possible for the City of Hugo to interconnect with this system in the future. Lino Lakes Mayor Reinert advised that he and Lino Lakes Council member Bergeson had met with the Centerville Mayor and a Centerville Council member to discuss the Interstate 35E intersection. Mayor Reinert. suggested that it may be beneficial for the Cities of Centerville. Hugo and Lino Lakes to consider development of this area as a joint effort, erasing boundary lines. He appeared to feel that it would be important to worth; together to create compatible zoning districts. He noted that it does not make a difference who obtains the first development, all will benefit. Mayor Reinert further noted that developers may be very anxious to worth: with a cooperative Cities group. He felt the three cities together could create an interchange that we could all be proud of. Meeting disassembled at 9:43PM. Respectfully submitted, Tamara M. Miltz-Miller City of Hugo