HomeMy WebLinkAbout2005.04.28 PC MinutesMINUTES HUGO PLANNING COMMISSION April 28, 2005 Call to Order Chairman Schumann called the meeting to order at 7:03 p.m. PRESENT: Bailly, Kleissler, McRoberts, Rosenquist, Schumann, Weidt Hoffbeck arrived after roll call. ABSENT: None ALSO PRESENT: Bryan Bear, Community Development Director Michele Lindau, Community Development Assistant Sam Crosby, Planner Minutes of April 14, 2005 Weidt made motion, Bailly seconded, to approve the minutes of April 14, 2005 as amended. Ayes: Bailly, Hoffbeck, Kleissler, Rosenquist, Schumann, Weidt Abstain: McRoberts Motion carried. Randy Nugent - Pavement Guys Holdings, LLC for Site Plan, Variance, CUP The Commission continued the public hearing to consider the application of Pavement Guys Holdings, LLC, 6937 West Shadow Lake Drive, Lino Lakes, for approval of a site plan, variance, and conditional use permit to allow construction of a 15,065 square foot office/warehouse building on a vacant lot in the Peloquin Industrial Park. The application was considered at the Planning Commission meeting on April 14, 2005. The Commission tabled the request to allow the applicant to address issues raised by the Commission. The applicant had revised the plans to show the relocation of the west entrance of the building, revised ponding and parking stalls, and additional sidewalks, landscaping, and curbing. The Planner pointed out that the plan still did not show all curbing and did not show the trash enclosures in the rear of the building. Planning Commission Minutes — April 28, 2005 Page 2 of 5 Randy Nugent asked to be exempt from the curbing requirement. The Ordinance requires that concrete curbing be installed. Nugent offered to construct asphalt curbing. Schumann explained that curbing prevents encroachment and aides in water runoff. He felt that could be accomplished with a lay -down curb or bump -up asphalt curb. He suggested asphalt curbing in only certain areas. Nugent said he was in the business of asphalt and would be sure to maintain asphalt curbing. Rosenquist pointed out that the plan did not show the storage tank to be located in the exterior storage area. He asked that a condition of approval be added that the applicant work with the building inspector on the tank construction. He said he felt the building could be redesigned so a variance was not necessary. Hoffbeck said she felt the applicant had complied with their previous concerns and was not worried that the applicant would not maintain the asphalt. Weidt said he felt the applicant had made the changes to the plan that were requested and noted that it was tough property to put a building on. Bailly said she felt that either curbing would accomplish what it was intended to do and she was okay with the project. McRoberts said he could live with the setback variance, pointing out that no neighbors came forward to oppose it. Kleissler felt they made a good effort to make the requested changes and approved of the changes to the ponding on the east end. Since asphalt was the applicant's business, she felt a bituminous curbing would be appropriate and a condition could be added to the approval that the curbing be maintained. Schumann said they needed to consider what would happen if the building was sold to someone else. He would be okay with lay -down curbing. Rosenquist agreed with Schumann that lay -down curbing would still control the water. Weidt made motion, McRoberts seconded, to approve the request with the conditions established adding a variance for the bump -up curbing. Ayes: Bailly, Hoffbeck, Kleissler, McRoberts, Schumann, Weidt Nays: Rosenquist Planning Commission Minutes — April 28, 2005 Page 3 of 5 Motion carried. Schwieters Properties Site Plan The Commission considered the application of Schwieters Properties for site plan approval to allow for the construction of a 45,000 square foot building on Lots 4 and 5, Block 1 of Bald Eagle Industrial Park, 3rd Addition. The building would be located directly south of the three existing Schwieters buildings and would be intended primarily for storage of lumber and other materials currently being stored at the former Interstate Lumber site on the southwest corner of TH61 and 140th Street North. Construction on the site will also include the installation of a railroad spur. The CDD explained that the railroad spur would be a team track that can be used for unloading of materials for Schwieters as well as other businesses in the City. Schumann asked if there was a road to be constructed to the spur and who would pay for it. The CDD explained that the entrance would be off the existing cul-de-sac and Schwieters would construct the driveway. It would be maintained in agreement with the railroad, Schwieters Properties, and the City. The CDD pointed out that additional landscaping needed to be added and the exterior storage on the existing Schwieters' site was not adequately screened. Materials stored on the site are stacked extremely high, making it a challenge to screen. Schumann wondered if the site could be screened by conifers planted near the highway which would be in the line of site from roadway traffic. Rosenquist questioned whether planting in the railroad or highway right-of-way would be permitted. McRoberts said that allowing the exterior storage without the required screening would be setting a bad precedence, and the City needed to ensure compliance with the ordinance. Schwieters was currently using the track located at the former Interstate Lumber site and was also storing materials there. They would like to terminate that and use the proposed team track and the building. When the interior storage reaches capacity, they would store materials outside and construct the screening at that time. It was anticipated they would reach building capacity in a few years. Rosenquist said the exterior storage was very visible and they should not wait two years to screen. Something should be done in the interim. Planning Commission Minutes — April 28, 2005 Page 4 of 5 Hoffbeck asked about how the railroad spur would be constructed and how the public would have access. The CDD explained that the tracks would be installed by a contractor through Minnesota Commercial Railroad and Schwieters Properties would dedicate an easement for access to the railroad spur. Weidt said he felt the screening should be brought into compliance. Bailly questioned the impacts to the wetlands. The CDD said the City was working with all agencies involved with the wetland and it would be a conditional of approval. Brenda Kunkel, representative for Schwieters, explained they had been working on the agreement for the team track for the last few years and they need to move out of the Interstate Lumber site. She said Schwieters Properties was looking into different types of screening. Schumann suggested they come up with a tentative plan and provide some escrow to ensure it would be done. Hoffbeck said she would like to see a plan of the whole campus showing the entire screening area. McRoberts made motion, Rosenquist seconded, to table the request to allow the applicant to work on a plan to screen the whole exterior storage area All Ayes. Motion carried. Miscellaneous McRoberts referred to previous discussions regarding the Victor Gardens North development. One of the conditions added by the Planning Commission was that anyone buying a home in the area be advised that agricultural zoning existed on adjacent properties and what types of uses were permitted there. McRoberts was disturbed by the fact that the condition was deleted by staff without consulting the Commission and asked that it not happen again. The CDD apologized and said the condition was part of the plat approval. He stressed it was not staff's intention to do things differently than what is intended by the Planning Commission. Many items are discussion topics and are not included in the motions. Planning Commission Minutes — April 28, 2005 Page 5 of 5 Adiournment McRoberts made motion, Kleissler seconded, to adjourn at 8:14 pm. All Ayes. Motion carried. Michele Lindau, Secretary Planning Commission