Loading...
HomeMy WebLinkAbout1998.04.01 PC MinutesMINUTES FOR THE PLANNING COMMISSION MEETING OF 4-1-98 The meeting was called to order by Chairperson Peltier at 7:05 P.M. PRESENT: Peltier, Rubenzer, Kellison, Malaski, Puleo City Engineer, Tom Angus City Administrator, Bob Museus Kellison arrived at 7:45 P.M. Rubenzer arrived at 8:00 P.M. ABSENT: Schumann, Harrison Future roads between 147th St. and 165th St. west of Oneka Lake Boulevard Residents, the Planning Commission, the City Administrator, and City Engineer, gathered at City Hall to consider the options for future road construction between 147th Street and 165th Street, west of Oneka Lake Boulevard, initiated by several property owners' desire to develop in the area. After much discussion the following decision was made: The collector street entrance to the development will be from Oneka Lake Boulevard and head north near the section line between Section 16 and Section 17, taking into consideration the location of existing residents on Oneka Lake Boulevard, and the potential of extending the road in the future. The road will proceed North parallel to the existing Northern States Power easement, then curve to the west through the Peloguin property to T.H. 61. In addition, this will allow for a future collector street connection to the north through the Arcand property. Kellison made motion, Peltier seconded, to direct Tom Angus, City Engineer, to address concerns of individuals and work with the parties involved to develop a sketch plan of the area. All AYES. Motion passed. Kellison made motion, Sandy seconded, to adjourn at 8:30 P.M. All AYES. Motion passed. ,1 I l� � i�c� Michele Lindau, Secretary Planning Commission