HomeMy WebLinkAbout1999.02.24 PC MinutesMINUTES FOR THE PLANNING COMMISSION MEETING OF 2-24-99
The meeting was called to order by Planning Commission member Schumann at 7:00 PM.
PRESENT: Kellison, Kleissler, Malaski, Peltier, Schumann, Puleo
City Administrator, Robert Museus
Deputy Clerk, Michele Lindau
Schumann made motion, Peltier seconded, to approve the minutes of January 27, 1998, as amended.
Ayes: Kellison, Kleissler, Peltier, Schumann, Puleo
Abstain: Malaski
Motion carried.
Beaver Ponds -Second Addition
Oakwood Land Development Company, 1611 Highway 10, Spring Lake Park, MN, requested to develop the second phase of the
Beaver Ponds Subdivision consisting of 32 townhomes along the south side of 130th St., east of Flay Avenue.
Puleo read the public notice as published in the White Bear Press, and opened the meeting for public comment.
Mr. John Peterson, owner of the Oakwood Land Development Company, presented the new plan showing the change in the
number of townhomes. Previous preliminary plat approval for Phase 2 & 3 provided for four -unit townhomes in Phase 2. Mr.
Peterson requested to change it to two unit townhomes. He also cited a change in the buildings along the wetlands in Phase 4.
Tom Jackson, owner of a triangular section of land west of Phase 4, expressed his concern regarding sewer access, and requested
the sewer be set at such an elevation to ensure it would be available to serve his property, and requested the charges to dump into
the lift station be recalculated.
Mr. Peterson responded by saying the sewer line would serve all of the Jackson property but only a portion of the Jesperson
property.
Jerry Hauble, 5460 125th St. N., would like the sewer elevations and gravity -feed system designed appropriately to
accommodate his 80 acres to the south.
Warren Arcand, 5510 130th St., was concerned about how his property to the north would be affected by the sewer line.
Kevin Peltier, 13194 Goodview Ave. N, asked if the sewer hookups on the east end of their property line would change from the
previously -approved Phase 2 plans. The City Administrator stated it should not affect his property and that the City Engineer
was aware of Mr. Peltier's concerns.
Puleo closed the public hearing.
Kellison expressed approval of the reduction in density, but was concerned about how the roads will connect to future
development in the area. Schumann stated Ferrara Avenue should be constructed all the way to the property line of the
development.
Schumann made motion, Malaski seconded, to recommend approval of Beaver Ponds Second Addition subject to the Findings of
Fact and Recommendations.
Ayes: Kellison, Kleissler, Malaski, Schumann, Puleo
Nay: Peltier
Motion carried.
Special Use Permit -Wayne Scanlan
Wayne Scanlan, 5379 Grand Ave., White Bear Lake, applied for a special use permit to construct a 44'X 70' horse barn, to
replace an existing 40' X 120' horse barn, prior to construction of a house on the lot. The property is located in the Lakeshore
Zoning District of Horseshoe Lake. Hugo City Code, Chapter 320-5, Subd. 8(1), states that no accessory building or use shall be
constructed on a lot prior to the time of construction of the principal building to which it is accessory, except by special use
permit.
Minutes for the Planning Commission February 24, 1999 - Page 2
Puleo read the public notice as published in the White Bear Press, and opened the meeting for public comment but there was
none.
Mr. Scanlan explained that the existing horse barn is quickly rotting due to extensive water damage and expressed concerns
about safely running his horse operation. Mr. Scanlan currently has 15 horses and is unable to keep all of them in the barn.
Mr. Scanlan said he would be approaching the Planning Commission again in the near future to discuss issues involving the
home he planned to construct such as driveway access and setbacks from the lake.
Malaski questioned whether a special use permit should be permitted prior to addressing these issues. Mr. Scanlan assured the
Planning Commission he would definitely be building the home, but the details would have to be worked out.
Kellison felt a letter of credit would be necessary to ensure the house would be built.
Kellison made motion, Peltier seconded, to recommend approval of the special use permit to construct a 44' x 70' accessory
building prior to construction of residence with the following conditions:
1. The property owner is to combine Government Outlot 1 and 2, Section 4, T3 1N, R2 IW into one parcel of record.
2. Construction of a residence on the property is to commence within 18 months of the issuance of this SUP.
3. The existing 40' x 120' barn on the property shall be demolished and removed within twelve (12) months of the completion
of the new barn.
4. The property owner is to provide the City with a letter of credit or cash deposit, in the amount of $10,000 to insure removal
of the existing building and construction of the residence, as specified.
5. Use of the accessory building shall comply fully with the City's zoning ordinance.
All Ayes.
Motion carried.
Site Plan Approval-Sotelo Body & Paint
Mr. Brian McGoldrick, 14715 Square Lake Trail, Stillwater, MN, and Mr. Bruce A. Sotelo of Sotelo Body & Paint, 1556 5th
St., White Bear Lake, MN, had requested site plan approval to use McGoldrick's building at 5100 130th St. N. (the old Dyna
Glass building), for auto body repair and painting. The property is located in the City's Industrial Zoning District, which allows
auto body repair shops as a permitted principal use.
Bruce Sotelo and his fiancee, Nancy, were present at the meeting and stated that according to Mr. McGoldrick, an asphalt
driveway was to be installed by September 1, 1999. They had also been working with the Fire Chief and Building Inspector
regarding building code requirements.
It was determined by the Planning Commission and staff that Mr. McGoldrick has not been in compliance with conditions of his
previous site plan.
Kellison made motion, Malaksi seconded, to table the site plan approval until the owner, Mr. McGoldrick, presented an
adequate plan on how he will accommodate two tenants in the building.
Ayes: Kellison, Kleissler, Malaski, Peltier, Puleo
Abstain: Schumann
Motion carried.
Kellison directed staff to contact Mr. McGoldrick and advise him to be at the next meeting.
Street Design Standards
The Rice Creek Watershed District had requested the City of Hugo consider reducing its required street widths for urban
residential development.
The Planning Commission agreed the street issue should be considered
Minutes for the Planning Commission February 24, 1999 - Page 3
Schumann requested staff obtain copies of "Residential Streets" by The American Society of Engineers for the Planning
Commission and City Council. He also felt a joint meeting with the Parks Commission and an outside expert would be
appropriate.
New Easel or Board for Visual Displays
Kellison made motion, Schumann seconded, to request staff purchase a new easel for residents, developers, etc., to use when
presenting their plans.
All Ayes.
Motion carried.
Staff Reports and Recommendations
Kellison asked to have the staff reports and recommendations presented at the meetings prior to discussion of the issue and
public hearings. It is felt that this would ensure all Planning Commission members and residents attending meetings are taking
into account the same issues.
Job Description for Planning Commission Members
Puleo asked that staff continue to work on a job description for Planning Commission members.
Planning Commission Vacancy
Schumann expressed concern over the vacancy on the Planning Commission. The City Administrator informed him it was on
the agenda for the next City Council meeting.
Kellison made motion, Malaksi seconded, to adjourn at 8:55 PM.
All Ayes.
Motion carried.
Michele Lindau, Secretary
for the Planning Commission