HomeMy WebLinkAbout1994.11.16 CC Minutes - Joint meeting with Lino LakesJOINT COUNCIL MEETING
WITH THE CITY OF HUGO
CITY OF LINO LAKES
COUNCIL MINUTES
RECEIyED DEC 2 2 0%
NOVEMBER 16, 1994
Staff members present: Acting City Engineer, John Powell, City
Administrator, Randy Schumacher and Clerk -Treasurer Marilyn
Anderson. City of Hugo Council members: Francis Miron, Debra
Barnes and Jim LeRoux. Newly elected Hugo Council members Marvin
LaValle and Andy Goiffon, Hugo City Administrator Bob Museus and
Consulting Engineer, Joel Dresel were also present.
The purpose of the meeting, which was held at the White Bear
Country Inn, was to discuss issues of mutual interest to both the
City of Lino Lakes and the City of Hugo.
The City of Lino Lakes and the City of Hugo have entered into an
agreement to prepare a study of the Clearwater Creek drainage
area. The study is being prepared by Hugo's consulting engineer,
OSM and is expected to be completed in February, 1995. Rice
Creek Watershed District (RCWD) is aware that the study is being
prepared and has noted that it meets their criteria. Mr. Dresel
said that he would present the completed study to both the City
of Lino Lakes and the City of Hugo.
Mr. LaValle and Mr. Miron discussed elements of the study noting
that the intention was to coordinate the study with RCWD because
the study area involves several entities as well as Bald Eagle
Lake, Otter Lake and the entire Clear Watercreek area. Mr. Miron
said he could envision a control structure at Bald Eagle Lake and
a revision of the structure that lies under I35E. The result of
the study will be a plan to control drainage in the entire
Clearwater Creek basin. The impact of the plan will be known and
communicated to the public to avoid a situation that now is
occurring in the City of Centerville.
Mr. LaValle explained that when I35E was constructed, a mistake
PAGE 1
JOINT COUNCIL MEETING
WITH THE CITY OF HUGO
NOVEMBER 16, 1994
occurred in the size of the pipes laid under the highway. He
indicated the Minnesota Department of Transportation realized
their mistake but did not correct it. Mr. Dresel explained that
if another pipe is installed under I35E, Centerville will be
impacted. Mr. LaValle asked Mr. Dresel to obtain a copy of the
study that was completed in 1977 or 1978 to use as background
information.
Mr. Powell outlined the proposed Clearwater Creek subdivision in
Lino Lakes noting the location, the proposed traffic pattern, and
the plan for providing utility services. He also noted a desire
to work with the City of Centerville and the City of Hugo to
jointly provide services for the corridor.
This area appears to be ready for development and mutual
cooperation by all three (3) cities could benefit each city. Mr.
Powell noted that the proposed Clearwater Creek subdivision will
be constructed in phases and could ultimately include 450 homes.
The developer has submitted a request for a rezone and
preliminary plat approval. Eventually two (2) municipal wells
and a water tower may be constructed to service the subdivision
and the commercial development expected at the intersection of
I35E and Main Street. Mr. Powell explained how services would be
provided for the area and noted that the proposed subdivision and
future commercial development is consistent with the Lino Lakes
Comprehensive Land Use Plan.
Mr. Dresel asked Mr. Powell if any studies have been prepared to
determine the ultimate land use for the area. Mr. Powell
explained that an intersection study was prepared in 1992 and
outlined how development is planned for the area.
Mr. LaValle explained that originally the frocemain along Cedar
Street between the City of Centerville and the Forest Lake
interceptor in the City of Hugo was constructed to alleviate a
problem in the City of Centerville. He suggested that with
additional flow from Lino Lakes, the capacity would be restricted
for the City of Hugo. Mr. Schumacher explained that connection
to the interceptor has been in the Lino Lakes Comprehensive Land
Use Plan for at least 14 years and Metropolitan Council has never
indicated that the connection was not possible. Mr. LaValle
explained that Lino Lakes was approached when the intercepter was
installed but Lino Lakes was not interested at that time. He
asked that this matter be investigated since the MCWS is
experiencing a maintenance problem with the Forest Lake
interceptor. Mr. Powell explained that all changes to the MUSA
boundaries and the Comprehensive Land Use Plan have to be
approved through the Metropolitan Council and based on
information from them, there is capacity for Lino Lakes.
PAGE 2
JOINT COUNCIL MEETING NOVEMBER 16, 1994
WITH THE CITY OF HUGO
Ms. Barnes asked Mr. Powell to explain the traffic pattern for
the proposed subdivision and the commercial area to the north.
Mr. Powell explained that there was concern about mixing the
residential traffic with the business traffic. A plan has been
discussed which would move Otter Lake Road, north of Cedar
Avenue, to the east. An additional concern is that Otter Lake
Road approaches Main Street too close to the freeway exit and
entrance. The proposed traffic pattern would route traffic to
24th Avenue (Elmcrest) and then north to Main Street. There will
be a traffic signal at the intersection.
Mr. LeRoux asked Mr. Powell if this area in Lino Lakes falls
within the MUSA boundaries. Mr. Powell said yes except for a
small area south and east of the proposed subdivision.
Mr. LaValle asked if the proposed drainage for this area in Lino
Lakes proposes to use Clearwater Creek. Mr. Powell said
ultimately yes. He noted that he has met with the developer and
RCWD regarding the proposed drainage plan. Mr. LaValle asked Mr.
Powell if Tart Lake could be used for overflow storage. Mr.
Powell said that he is hoping the drainage study will determine
where overflow for the entire watershed could be kept.
Mr. LeRoux asked if the City of Lino Lakes has considered how
utility infrastructure is to be financed. Mr. Powell explained
that the first phase of the Clearwater Creek subdivision would
include about 150 units and this should generate enough
assessments to cover the infrastructure costs.
Mr. LaValle suggested that the Clearwater Creek drainage study
may affect how this proposed subdivision should be developed and
how many units are allowed to develop. Mr. Powell felt that the
study may affect the design parameters and restrict volume of
runoff, not just the rate of runoff from the development. Mr.
LaValle felt that some of the issues are district wide issues and
not just Lino Lakes issues. Mr. Powell explained that he and the
developer have been in constant contact with RCWD on this issue
and they are looking at more than rate of runoff from the
subdivision. Soils are being examined and a plan to encourage
infiltration to reduce runoff was also discussed.
Mayor Reinert noted that the Clearwater Creek proposed
subdivision is only in the concept stages. There are many
questions to be examined before it is approved by the Planning
and Zoning Board and the City Council. He also suggested that by
phasing in the project, a higher quality subdivision will be
developed. Mayor Reinert felt that the development of the
Clearwater Creek subdivision would provide the impetus for future
commercial development around the freeway intersection and
PAGE 3
JOINT COUNCIL MEETING
WITH THE CITY OF HUGO
NOVEMBER 16, 1994
ultimately to the City of Centerville and the City of Hugo.
Mr. Jay Caine said that the Clearwater Creek subdivision is being
discussed as if it were a foregone conclusion. He noted that the
Planning and Zoning Board did consider the proposal and
recommended that it be denied. Mr. Powell explained that the
Planning and Zoning Board focused on the traffic that will be
generated on Otter Lake Road, wetland issues and the impact on
the school district. All these items need additional study.
Mayor Reinert said that the concept/preliminary plat is still
open for discussion and the school district issue is an entirely
separate issue. He explained that he feels that if the
subdivision is not constructed, utilities for commercial growth
in this area will be delayed for many years. Mayor Reinert said
that Lino Lakes is preparing for commercial/industrial growth and
already has the Economic Development staff to help develop this
growth. He noted that he may be criticized for opening new
housing development areas but a policy has already been
established to slow residential growth to 150 to 200 homes per
year. Mayor Reinert felt that the Planning and Zoning Board
should have delayed their decision on the preliminary plat until
all questions have been answered. He felt that the City Council
will delay any decision on the preliminary plat until the
drainage study has been completed and the other issues addressed.
Mr. Goiffon asked if the Lino Lakes tax base would benefit from
the proposed subdivision and would it provide the infrastructure
for commercial development. Mayor Reinert said yes and from a
visionary concept, there is benefit to the City of Hugo. Mr.
Goiffon said he could see a big potential for the 135E
intersection. Mayor Reinert suggested that a joint effort to
expand the MUSA would benefit both Lino Lakes and Hugo. Mr.
Goiffon said that if the MUSA is restricted in the City of Hugo,
then Hugo will not have the same development opportunies as Lino
Lakes.
Mr. Powell explained that at this time, he believes action on the
proposed subdivision would be delayed until the drainage study is
completed. Mr. Schumacher noted that the City Council has 60
days to act on the plan and it is possible that the City will ask
the developer for a letter granting the City Council permission
to take more than 60 days to complete action on this matter.
Mr. Miron noted that the City of Hugo is also experiencing a push
for development in the Clearwater Creek drainage area. He asked
that Lino Lakes delay any action on the proposal until the study
is completed. He also asked that OSM not be pushed to complete
the study. Mr. LaValle noted that the first phase of the
proposed subdivision totally impacted the Hugo. Mr. Powell felt
PAGE 4
JOINT COUNCIL MEETING NOVEMBER 16, 1994
WITH THE CITY OF HUGO
the entire proposal impacts Hugo. Mr. Dresel noted that the City
of Hugo already has a water tower in the Clearwater Creek basin
vicinity. He suggested that Lino Lakes look at this facility for
short term use since there may be capacity. Mr. LaValle felt
that Lino Lakes should consider a major sewer interceptor for
this area because he felt that the current force main interceptor
could not service the entire area. Mr. Dresel said that he would
contact the old Metropolitan Waste Control Commission to
determine what data they have on the Forest Lake interceptor.
Mr. Powell felt the current interceptor would handle the needs of
the first and second phase of the proposed subdivision. Future
needs will have to be studied. Mayor Reinert felt it would be
appropriate for both the City of Lino Lakes and the City of Hugo
to meet with the Metropolitan Council staff on this matter.
Future street improvement plans were discussed. Mr. Dresel used
the overhead projector and explained that the City of Hugo's
transportation plan includes a proposal to eventually connect
Elmcrest (24th Avenue) to Highway 61 by extending Washington
County Road 8A (140th Street) west. The Hugo transportation plan
also includes provisions to improve Frenchman Road (County Road
14 in Lino Lakes) from Highway 61 west to the Lino Lakes/Hugo
border, Cedar Street from the connection with 140th Street west
to Elmcrest and Elmcrest (24th Avenue) north to Frenchman Road.
There was discussion regarding Otter Lake Road and its ability to
support the traffic generated by proposed subdivision in Lino
Lakes. Ms. Barnes suggested that Lino Lakes and Hugo plan street
extensions and improvements cooperatively. She noted that some
of the streets discussed may have to be upgraded to collector
status in Lino Lakes.
Mr. LeRoux noted that oil is being used for dust control on
Elmcrest Avenue. This situation creates pot holes. He also
noted that the access to Bald Eagle Lake in the City of Hugo has
been closed due to safety concerns. He asked if another access
site in Lino Lakes could be constructed. This matter will be
investigated.
Mr. and Mrs. Lawrence Winters, 7703 - 24th Avenue, Lino Lakes
said that they did appreciate the dust control provide by the
City.
Mr. Miron explained that the meeting this evening has raised more
questions and suggested that a meeting set for January or
February, 1995 after the Clearwater Creek drainage study is
completed and a more complete discussion could be held. He
expressed appreciation for being offered the opportunity to work
with the City of Lino Lakes on matters of mutual interest. Mr.
Schumacher said that he and Mr. Museus will continue to work
PAGE 5
JOINT COUNCIL MEETING
WITH THE CITY OF HUGO
NOVEMBER 16, 1994
together on the issues raised this evening and will schedule a
joint meeting when the drainage study is completed and after
further discussion with the RCWD.
The meeting was adjourned at 10:00 P.M.
These minutes were consider, corrected and approved at the
regular City Council meeting held on December 19, 1994.
/i.
�% •7 1111.v �\ � ( C. moi, ' •f' t. '? %i''`ce L�
Marilyn) G. Anderson,
Clerk -Treasurer
Vernon F. Reinert,
Mayor
PAGE 6