Loading...
HomeMy WebLinkAbout2008.09.10 Parks AgendaCITY OF HUGO MEMORANDUM TO: Parks Commission Mike Ericson, City Administrator FROM: Scott Anderson, Senior Engineering Technician SUBJECT: 2008 Park Tour Agenda DATE: September 10, 2008 AGENDA 1. BERNIN PROPERTY (See attached concept plan) The Bernin farm was purchased by the City in 2002. It consists of 23 acres on the southwest shore of Oneka Lake. The property is adjacent to Oneka Lake Park which is 10 acres in size for a combined total of 33 acres. Around the time of purchase a "concept" plan was developed by Landscape Architect Laurie McRostie (see attached plan). This concept plan includes the development of the park to be used by students learning about nature as well as residents looking to enjoy a relaxing environment. Amenities included in the concept plan include a boardwalk and woodchip trails as well as a wooded area that would be restored back to an oak savannah. Also included is a 6 car parking lot, a small play structure and a fishing pier all linked to the existing public lake access. 2. HANSON PROPERTY This property consists of approximately 120 acres and has been identified by City staff, Council and the Parks Commission as a potential site for softball/baseball complex or complete athletic complex. For decades the property was used as a gravel pit and commercial asphalt plant, until recently when the property was reclaimed and vegetation restored. Parks Commission members Pete Pederson and Roger Clarke have had several meetings with the Hanson family to discuss the possible acquisition of this property. 3. RICE LAKE PARK The City originally purchased the property from the White Bear Rod and Gun club back in the mid 80's. Since then, the majority of the property had remained in an undeveloped condition. Up until this past spring many of the old buildings were still standing, which over time had become a hazard. The park property is approximately 70 acres, however only about 25 acres are considered upland and usable. The park consists of two large multi -use athletic fields which are large enough to accommodate 5 regulation sized irrigated soccer fields. With youth fields being much smaller, there is the ability to accommodate up to 10 smaller fields depending on the age of the players. There are two parking lots with the ability to park up to 200 cars. Also included are several paved walking trails, which will make it easy for families to access some of the fields that are further from the parking lots. A sub -committee has been formed to develop a proposal from the Hanifil Foundation to fund phase 2 of the park. This phase consists of a field house with restrooms, a concession area and a warming room. Phase 2 also includes plans for a play structure and possible hockey rink. 4. CLEARWATER CREEK PRESERVE (See attached maps) Clearwater Creek Preserve is approximately 96 acres in size. It is considered a passive park and has remained unimproved except for the woodchip trail installed by Eagle Scout members in 2007. (See Map) S OAKSHORE PARK (See attached plan) This property consists of 10 acres of park property recently obtained by the City from the Oakshore Park Homeowners Association. The park currently includes a picnic shelter, sliding hill, play equipment and'/2 court basketball as well as two parking lots. There is a bituminous walking path that accesses the western portion of the park where several picnic tables and benches have been placed. Several components of the park are still in progress, including horseshoe pits and a backstop for pick up style baseball and softball games. Trees and plantings will be completed in the next month. 2