HomeMy WebLinkAbout2012.10.10 Parks PacketCopies to:
I. 7:00pm
II. 7:03pm
III. 7:30pm
IV. 9:00pm
Agenda
Parks Commission, City of Hugo
October 10, 2012
7:00 pm
Council Chambers, City Hall
Commission Members, City Staff
Approve Minutes From September 26, 2012 Meeting
WBL Athletic Facility Study
Continued Discussion on LaValle Park Dedication and
the Lions Park Master Plan
Adjournment
Next Meeting - November 14, 2012
-1-
Parks Commission
October 10, 2012
Background Memo
Approve Minutes From September 26, 2012 Meeting
Staff recommends approval of the minutes from the September 26, 2012 Parks
Commission meeting.
WBL Athletic Facility Study
The City of Hugo has been asked by White Bear Lake Area School District to
participate and financially support an Athletic Facility Needs Analysis. A similar
study was conducted in 1998 which the City of Hugo has used in planning of
recreation facilities in the past 10 years. The proposed study could be used in
planning future park projects. A recommendation could be made to participate in
and support the White Bear Lake School District and the Athletic Facility Needs
Analysis in an amount not to exceed $5,000.
V.
At the meeting of September 26, 2012 the Parks Commission held a public
workshop to review the preliminary Master Plan of Lions Park. Also, a concept
plan for the development of the property immediately west of Lions Park was
presented. The developer was looking for informal feedback and is proposing to
dedicate land instead of paying a fee to satisfy park dedication requirements.
The developer is proposing to dedicate more than 2.45 acres, which is estimated
to be required, and include storm water ponds on the land.
It is beneficial that discussion on the Lions Park Plan and the proposed park
Dedication happen together. The Parks Commission should offer feedback to
the developer on each of the following items specifically:
■ Dedication of land/expansion of the park to the west
■ Inclusion of a storm water pond
• Connections of trails and sidewalks
■ Access and transportation (Finale Avenue or Fitzgerald Avenue)
Depending on the Parks Commission's interest in working with the developer on
a future park dedication, a recommendation could be made to the City Council
which supports the Lions Park Master Plan but states intention to work with the
developer and willingness to make changes to the master plan accordingly.
-2-
Parks Commission
October 10, 2012
Minutes
Parks Commission, City of Hugo
September 26, 2012
7:00 P.M.
Council Chambers, City Hall
Call to Order
Present: Joan Benner, Rachel Berger, Chris Boland, Mat Rauschendorfer,
Tom Windisch, Kris Birch
Absent: Roger Clarke, Dave Strub, Jim Taylor
Staff Present: Bryan Bear, City Administrator
Scott Anderson, Public Works Director
Shayla Syverson, Parks Planner
Debi Close, Parks Secretary
Elizabeth Hanson, Planning Intern
Jim Taylor called the meeting to order at 7:04 p.m.
I. Approval of Minutes from August Meeting
Windisch made a motion, Rauschendorfer seconded to approve the minutes of the August 8,
2012 Parks Commission meeting.
All Aye. Motion Carried.
II. Agenda Review
Shayla Syverson, Parks Planner summarized the meeting agenda and that agenda items
included the Preliminary Master Plan proposed for the Lions Park followed by a proposed park
dedication for a potential development on property west of the park.
III. Presentation of the Lions Park Preliminary Master Plan
Amanda Prosser, Landscape Architect from WSB & Associates presented the Lions Park
Preliminary Master Plan. Plan Highlights included closing of Fitzgerald Avenue to thu traffic to
provide City Hall & park parking, continuous pedestrian walk way throughout the public areas
and connections to the Hardwood Creek Trail, designated vehicle entrances for event access,
age separated play features, visible basketball court and skate park plus significant open space
for flexibility future uses.
Members of the Hugo Lions Club as well as residents that live near the park provided feedback
on the proposed plan. Changes suggested included adding a backstop, providing a covered
stage area near the pavilion, and looking at the grading near the shelter to ensure that a winter
skating area could be created.
IV. LaValle Properties Park Dedication
Elizabeth Hanson, Planning Intern and Shayla Syverson, Parks Planner gave a presentation on
the potential development for the LaValle property that is adjacent to the Lions Park on the West
side. The development has submitted a sketch plan for informal feed back that includes 3 multi-
family residential buildings with 244 units on 14.44 buildable acres. The first phase would be an
Assisted Living facility, followed by a Commonbond apartment building, and then third phase
would be an Congregate Care facility. A concept plan was provided by Brunton Architects. The
developer is looking to satisfy park dedication requirements with the dedication of land instead
of paying a fee. It is estimated that 2.45 acres would need to be dedicated. The developer is
proposing to expand Lions Park with acreage that is over 2.45 acres and includes storm water
ponds. The Developer also proposed the removal of Finale Avenue, which is to the west of the
park.
Developer Bill Lentsch and Architect Corey Brunton requested and received feedback from
Parks Commissioners regarding the acceptability of the proposed dedication.
Windisch made a motion, Benner seconded to continue discussion at the following meeting
All Aye. Motion Carried.
V. Adjournment
Windisch made a motion, Benner seconded to adjourn the meeting at 9:25 pm.
All Aye.
Agenda Number: B
CITY OF HUGO
PARKS COMMISSION REPORT
TO: Parks Commission
FROM: Shayla Syverson, Parks Planner
SUBJECT: WBL Athletic Facility Study
DATE: October 4, 2012 for the meeting of October 10, 2012
1. BACKGROUND
White Bear Lake Area School District is looking to do a study of the athletic facilities in
the district. The City of Hugo has been asked to participate in the study and support it in
an amount not to exceed $5,000.
The City of Hugo participated in the 1998 Athletic Facility Needs Analysis done by the
School District. It concluded that additional gym space, dedicated soccer fields, and
medium and large baseball fields were needed in the district. It also stated that an indoor
ice arena, aquatic facility and multi -sport tournament facility were needed.
For the most part, the needs outlined in the 1998 study have been met. For its
contribution, the City of Hugo has provided several soccer fields with the construction of
Beaver Ponds Park and Hanifl Fields Athletic Park. Also, the City enhanced the
gymnasium at Oneka Elementary. As parks were constructed, the City of Hugo was able
to utilize the information in the study to meet the recreational needs of the growing
population and provide for the needs of the School District.
STUDY PLAN:
The cities served by the School District, including Hugo, and the Athletic Associations
that use School District facilities have been asked to participate in the study. The study
will assist all of the stakeholders in coordinating future planning or construction of
athletic facilities to meet regional needs.
A request for proposals will be submitted. The School District estimated that the study
may cost $20,000- $30,000. They are proposing a cost breakdown as follows:
WBL Area School District (18%) $5,500
City of White Bear Lake $5,500
-1-
WBL Athletic Facility Study
October 10, 2012
City of Vadnais Heights (13%) $4,000
White Bear Township $4,000
City of Hugo $4,000
Athletic Associations* (23%) $7,000
$30,000
*There are at least 10 Athletic Associations that are affiliated with the School District.
Not all of them will be able to financially contribute or are interested in participating in
the study.
The purpose of the study is to:
1. Evaluate the athletic facilities within the White Bear Lake Area School District.
2. Assist the School District and municipalities in regional planning of athletic facilities.
3. To help prioritize projects and expenditures among public agencies.
4. Improve access to and quality of the athletic facilities in the WBL Area School
District.
The study is likely to start in January, 2013 and conclude in the late spring.
3. CONCLUSION:
The City of Hugo has benefited from similar studies by the School District in the past.
The Athletic Facility Needs Analysis may be helpful in future park planning such as for
Irish Avenue Park.
A recommendation could be made to participate in and support the White Bear Lake
School District and the Athletic Facility Needs Analysis in an amount not to exceed
$5,000.
ATTACHMENTS:
1. Athletic Facility Needs Analysis, October 1998
2. Athletic Facility Projects Since 1998 Study
3. 1998 Athletic Facility Study- History
-2-
WBL Athletic Facility Study
October 10, 2012
Id
Prepared for:
Prepared by:
Athletic Facility Needs Analysis
October. 1998
White Bear Lake School District
Cities of White Bear Lake,
Vadnais Heights, Hugo, North Oaks,
Gem Lake, Lino Lakes,
White Bear Township,
and Birchwood Village
IM 61 AN A11
ASSOUAifS
Park and Recreation Planning
Land Use Planning
Landscape Architecture
City Planning
2659 Dupont Ave. Suite 100
Minneapolis, MN 55408
Ph. (612) 377-2500 FAX 377-1010
TABLE OF CONTENTS
I. Introduction................................................................................. 3
II. Executive Summary ........................................................................ 4
III. Demographic Forecasts.................................................................... 6
Table 1. Population Estimates and Forecasts ................................. 6
IV. Needs Analysis.............................................................................. 7
Athletic Association and Recreation Activities Use and Forecasts .................. 7
Table 2. Facility Use Summary and Forecast .................. I .............. 8
Facility Use Major Issues.................................................................. 10
Level of Service Comparison and Standards ............................................ 11
Table 3. Study Area Comparison to Local and National Standards....... 11
Athletic Participation and Sport Specific Needs ....................................... 12
V. Study Area Recommendations............................................................ 13
VI. Study Participants.......................................................................... 15
APPENDIX
Table 4. Athletic Facility Inventory
Athletic Facility Map
ASSOCIATES
Introduction
Athletic facilities (ball fields, gymnasiums, etc.) for public recreation are a fundamental service
provided in a cooperative manner by local government and school districts. City and School
District staff within the White Bear School District would like to determine the adequacy of the
facilities in the District and what actions are needed if inadequacies exist. This study examines
school needs (including intramural and community education) and community recreation needs as
well as city and school facilities.
This study is designed to answer the following question:
Are athletic facitifies located within the White Bear Lake School District adequate to meet
current and future community and school needs?
The study components are:
1. An inventory of existing public athletic facilities (city and school fields, gyms, pools etc.)
within White Bear Lake School District boundaries (Cities of Vadnais Heights, White Bear
Lake, Hugo, North Oaks, Gem Lake, Lino Lakes, White Bear Township, and Birchwood
Village). See study area map - Appendix.
2. An evaluation of the existing and future use of these facilities.
3. An analysis of the adequacy of athletic facilities to meet future needs.
4. Recommendations regarding facility management, expansion and additions to meet the
forecast demand.
QSSOCIATE5
Executive Summary - Major Findings and Recommendations
Two Areas- The White Bear School District has two distinct areas; the developed southern area
and the rapidly developing northern area. These two areas require two coordinated approaches:
• Meeting existing deficiencies to serve the existing population (primarily in the southern area).
• Planning and building facilities to meet the growth needs of the northern area.
Population growth will be a factor within the northern and western portions of the District. The
population of the portions of Hugo, Lino Lakes and North Oaks located within the District are
expected to nearly triple by the year 2010. Therefore, city and School District actions should be
focused not only on meeting existing facility deficiencies, but also on meeting the needs of the
expanding residential areas to the north and west.
Major Needs - While many athletic facilities needs within the District area are adequate to meet
existing and firture demand, the following additions and improvements are needed to correct
existing and projected shortfalls:
• Additional Gym Space is Needed
The most serious shortfall is a lack of sufficient gym space for adulrand youth sports. A
minimum of one indoor community recreation facility is needed with at least 2 full size gym
courts.
• Additional Dedicated Soccer Fields are Needed
Youth soccer is the fastest growing participation sport in the country and in the study area. More
dedicated soccer fields are needed to allow full participation, to minimize conflicts arising from
shared use fields and to prevent over -use of existing fields. Emphasis should be placed on finding
appropriate locations for dedicated soccer fields as well as improving the condition of existing
fields through the addition of irrigation. If dedicating existing fields for soccer is not possible
because it would cause a field shortage for another sport, new soccer fields should be constructed
and remain dedicated to the sport of soccer.
•. Additional Baseball Fields are Needed.
The study area has a shortage of medium and large size baseball fields (60' and 75' baselines,
200'-250+' outfield dimensions). These fields would serve the needs of youth and young adult
baseball players. At least five additional fields are needed for both size fields. An appropriate
compromise might be to establish new baseball fields that have the ability to be reorganized to
both the 60' and 75' baselines.
ASSOCIATES
• Additional Indoor Hockey/lee Skating Space is Needed.
Participation in hockey and other indoor ice sports and programs is continually increasing,
especially participation in girls hockey. White Bear Lake School District is in need of at least one
additional ice arena. With the continual growth of the district and the regional popularity of the
sport of hockey, the district will be lacking adequate facilities without the addition of an arena.
• An Aquatic Facility is Needed
White Bear School District is the only district of its size in the area to not provide an aquatic
facility for public programs. Currently, participation in swimming and diving programs is severely
limited by the lack of available facilities. At least one facility is needed with the minimum
requirements of at least one full-size competitive pool, a diving area and a "water park" style
pool.
A Sport Tournament Facility is Needed
The study area has no park or school capable of hosting a local, regional or state sports
tournament. A sports complex park is needed with a capacity of eight to twelve fields for soccer,
softball, baseball and football. With the limited space availability south of 120ih, a likely location
for a sports complex is north of 120" St.
INGHAHAM
A�SGCIATES
Demographic Trends/Forecasts
The population within the District is projected to increase from an estimate of 52,050 in 1996 to
55,818 in 2000. The majority of the population growth is expected in Hugo, Lino Lakes, and
North Oaks. The population age projections within the district are displayed in the following
forecast based on Metro Area trends.
The number of youth ages 0-14 (prime youth sports participants) will decline (4%) between 2000-2010.
The number of youth ages 15-24 will increase (28%) between 2000-2010.
The number of adults ages 25-34 (prime adult sports participants) will increase slightly (+i%) between
2000-2010.
The number of adults ages 3549 will decrease (-5%) between 2000 and 2010.
The number of adults ages 50-64 (active older adults) is forecast to increase (48%) between 2000 and
2010.
The number of adults ages 65-74 (active seniors) will increase (32%) between 2000 and 2010 and will
continue to increase for the next 25 years.
The number of adults ages 75+ (active seniors) will increase (8%) between 2000 and 2010.
'Metropolitan Council
Population Estimates and Forecasts
1996 2000 2010 t.,.,.a. #
Birchwood Village
1,027
970
940
Stable
Gem Lake
452
430
460
Stable
Hugo(624)*
1659
2634
5709
Growth
Lino Lakes(624)*
503
798
1267
Growth
North Oaks(624)*
450
694
1069
Growth
Vadnais Hgts. (624)*
11,645
13,492
15,001
Slight growth
White Bear Lake
25,611
24,300
23,200
Stable
White Bear Twp.
10,703
12,500
13,700
Slight growth
Total
52,050
55,818
61,346
Steady growth
Population within school district 624 estimated for study based on Met Council and City staff projections.
The White Bear Lake School District is a unique community due to the stable population of White
Bear Lake, Vadnais Heights, and White Bear township, and the projected population surge in the
north and west portion of the district, mainly Hugo, Lino Lakes, and North Oaks.
As the area's population increases, the need for more recreational facilities will also increase,
creating additional shortages. Within the growth areas, all age groups will require additional
facilities and programs.
In general, district -wide, the biggest population growth segments will be active older adults,
seniors and young adults. The expanding senior population will increase demand for facilities
such as indoor and outdoor walking areas and daytime gym space. The athletic facility needs
should focus on meeting the current shortfall in facilities for youth and adults, and the projected
shortages in respect to the growing areas.
ff[t?I�OIIr, .
6
Needs Analysis
Athletic Association and Recreation Activities Use and Forecasts
In August, 1998 the athletic associations and staff serving the cities of Vadnais Heights, White
Bear Lake, Hugo, North Oaks, Gem Lake, Lino Lakes, White Bear Township. and Birchwood
Village were asked to provide data about their current facilities and use of those facilities. The
information included facility usage, participation and forecast growth, future facility needs, and
general comments regarding facility adequacy and facility recommendations. That information is
summarized in Table 4 -Appendix and in the following text.
The Athletic Associations rely largely on school district facilities for gym space and use a mix of
school and city fields for outdoor sports. All the associations that use school gym space
expressed a strong need for additional gym space as school sponsored use and competition among
the associations was limiting their gym time and preventing young people from participating in
certain sports. The association information and comments also strongly stressed the need for
additional irrigated soccer fields, lighted ball fields, tournament facilities and an aquatic facility.
V adnais Heights Park and Recreation Department and the White Bear Lake School District offer
public recreation programs for all age groups. City and district recreation staff expressed a
concern over lack of facilities and said public demand exceeds their ability to provide programs
due to a lack of athletic facilities. Specifically, the city recreation department and the school
district felt a need for additional gymnasium space for basketball, volleyball, and indoor soccer.
They also expressed a need for additional outdoor soccer fields, lighted softball fields, and
expanded ice skating areas.
The local high school Athletic Director expressed the need for additional gym space. Currently,
basketball practice is split into flights at different times of the evening, making practice difficult
for students, parents and coaches. Those also suffering from lack of gym space are adaptive
recreational programs and indoor sports. The adaptive programs often have to relocate their
programs due to lack of gym space. Locker facilities at the high school level are below par, and
especially inefficient for women. The most notable shortage is a swimming pool forcing the high
school team to practice before and after school. Participation in all programs at the high school
level is steady to rising, and athletic facilities in the district are falling behind the demand.
INGRAHAM
ASSOCIATES -_
Facility Use Summary and Forecast
Sport/
Organization
Age
Group
Existing
Participation
Growth Trend
Baseball
White Bear Babe Ruth Baseball, Inc.
11-15
470
Rapid growth in
applicants, limited by
facilities
Comments: Fields are adequate, but the need exists or more baseball telds or practice time.
Suggestions: Need 90' base path fields
School District 624 Community Ed.
9-12
734
Steady slow decline
Comments: District lackin large playfields that will accommodate the older players and adults.
Suggestions: Create new facilities with large fields, several at a site. Existing fields could also use
improvements.
Softball
City of Vadnais Heights progxam
Adult
30
Stable
Suggestions: Light allfields to make ro ram competitive with bar leagues
School District 624 Community Ed.
9-19
1697 I
Steady slow decline
Comments: District lacking large playflelds that will accommodate the older players and adults.
Suggestions: Create new facilities with large fields; several at a site. Existing fields could also use
improvements.
School District 524 Community Ed. Adult
i960S/670F Stead
White Bear Fas itch 9-18
160 1 Growth
Comments: Condition and number offields inadequate. Lack o encin , maint.
Suggestions: Need our more elds, would be willing to volunteer labor.
Late Summer Youth Ball
City of Vadnais Heights program
7-13
35 Slowgrowth
T -Ball
City of Vadnais Heights program
4-7
292 Increasing, especially 4 -
5 age group
School District 624 Community Ed.
6-8
700 Stable
Basketball
White Bear Basketball Association
5t°-9 grade
200 Growth, limited by
I available gym space
Comments: The number and condition of existing gym space is inadequate for the existing basketball
programs, and is limiting the growth o these programs.
Suggestions: More gym space added with at least three full courts in one location. Upgrade the
conditions of existing indoor gym courts.
School District 624 Community Ed. 2-12" grade 1300
Comments: Need or indoor gym space is great, Availability o s ace limits participation.
Suggestions: Need large indoor gym space for basketball as well as other high demand indoor
recreation and sports.
Vadnais Heights program I� -4" grade 80 Growth
Comments: Need or more space and more storage,
Suggestions: Need two more gyms or this ro am(Vadnais Elem.) as well as a large storage area.
Q SID OC 1ATE'
Swimming and Diving
White Bear Lake Swimming & Diving
Booster Club.
High school
35
N/A
Comments: Only available through high school. Program and participation are limited due to lack
of a communityfacility. Currently only swimming facility available is private and during limited
hours.
Suggestions: Community needs a swimming and divinig, facili .
Volleyball
White Bear Lake Volleyball Assoc.
17 & under
82
Steady growth
Comments: Forced to eliminate age group due to lack of available gym space. Future plans to bring
organised volleyball to elementary age children, dependent on gym availability.
Suggestions: Need community center with several regulation courts. Existing gym space availability
and condition for [B inadequate.
School District 624 Community Ed.
4-6a grade
26 Slight Growth
School District 624 CommuniTy Ed.
Adult
300 Steady
Comments: Participation limited by lack available 9vms
ace.
Floor Hockeylindoor sports
Vadnais Heights program I
varied
60
Steady due to limited
space
Comments: Space is not ade nate for all programs.
Tennis
City of Vadnais Heights program
3-13
Adult
102
12
Slight Growth
Suggestions: Add lights to existing courts or extended playing times
School District 624 Community Ed.
10-18
140
Stable
Flag Football
City of Vadnais Heights program
7-10
56
Growth
Football
White Bear Youth Football Assoc.
4-7h grade
400
Growth
Comments: Number a gelds is adequate. Condition of game field needs improvement. Locking a
regulation size gamefield that is irrigated and in good condition.
Suggestion: Improve and expand existing ame field.
Soccer
City of Vadnais Heights program
4-7
260
Steady growth
White Bear Soccer Club
5-18
1 2117
Steady growth
Suggestions: Need for more fields, irrigation on all fields, Community field house and indoor gym
space for winter practice.
School District 624 Community Ed. 2-8" grade 1120 Stable
Comments: Soccer in dire need of large, dedicated fields. Majority offield now shared with other
ballfields, overlapping issues.
Suggestions: Need several large, dedicated soccerfields to accommodate al! soccer programs.
Skating/Hockey
City of Vadnais Heights program
Varies/5-10
75
Steady
White Bear Lake S eedskatin Assoc.
5-13
1 47
1 Varies
AssouArEG
Comments: Lacking a warming house near outdoor rink. Competitions held in Roseville -unable to
facilitate large crowds locally.
Suggestions: Concentrate improvements toward indoorfacilities and short track instruction.
White Bear Hockey Association 1 6-18 1 1270 1 Steady Growth
Comments: Need large ice arena for older kids programs, ice time is scarce now forcing practice time
late in the evening
Suggestions: Need for one large ice arena to free up smaller ice sheets for smaller kids.
School District 624 Community Ed.
I Adult
1 300
Steady
Comments: Growth limited to lack of ice time/s ace availability.
Ringene
Metro Rin ette Association
5-11
30
Steady Growth
Dance
Vadnais Heights program
3-10
64
Steady Growth
Comments: Participation limited due to lack ofgym space.
Playground Program
City of Vadnais Heights program
3-10
60 Steady growth,
especially with tot age
Wrestling
White Bear Wrestling Club
K-12
160 Steady growth
Gymnastics
Flips Gymnastics
2-18
850 Steady growth
Comments: Facility adequate for current participation. Need to expand for projected 2000
participation.
Note: High school programs not included in above table. Comments and suggestions can be found in the
following summary.
Major Issues
✓ Need for gym space. Additional indoor gym space is necessary for both volleyball and basketball
programs. Currently, the lack of gym courts in good condition is limiting participation in these
programs. A large indoor space could also accommodate off-season soccer practice and free up gyms
for basketball and soccer.
✓ Need for large, irrigated, dedicated soccer fields. Majority of soccer fields currently are not irrigated
and do not maintain good playing condition. Overlap of soccer fields with other sports facilities
hinders the soccer programs. Year round demand for soccer pushes need for good indoor facilities.
✓ Need for regulation size football field within school district that is irrigated, lighted, and in good
playing condition. Currently, one game field is used and is inadequate both in size and condition.
✓ Lighting suggested for both tennis courts and softball fields to allow for extended hours of use, and to
attract more participation in programs.
✓ Need for large, regulation baseball/softball fields for practice and game time, preferably with several
fields at a site. Need for 75' and 90' base fields. Lighting at play field sites would increase
tournament play and practicelgame time.
✓ Need for improvement & expansion of indoor ice facilities.
✓ Lack of community swimming pool facility limits participation. Need competitive pool facility to meet
community needs.
✓ Need for more accessibility to play fields and bathrooms, drinking fountains, concessions.
Pv As: ,.Tss 1
Comparison to National and Local Recreation Standards
The 1987 National Recreation and Park Association Park and Open Space Standards and
Guidelines provide guidelines for minimum numbers of athletic facilities to serve a given
population or geographic area. These national guidelines are useful in comparison with White
Bear Lake School District facilities. Also, local recreation standards are used to supplement the
national standards and are used where no national standards exist. The local metro area standards
are based on a 1996 study of seven Twin City area suburbs. The numbers listed below are the
minimum recommended number of fields or facilities for the District's projected 2000 population
of 55,818 people.
The service area standards are divided into the total square mile residential area of the District and
the square mile area of developed land within the study area. Both numbers are provided to show
an accurate account of existing shortages. The existing shortages are based solely on the areas of
the district that are developed currently. Thus, the areas without development and without
residents are not taken into account to show existing shortfalls. The forecast additional needs
column shows projected shortages on the premise that all land area within the district will
develop.
The following standards are rough guidelines and do not reflect specific local needs, but they are
instructive to obtain a snapshot view of facility supply. As such, the WBL School District study
area totals have been compared to the national and local standards. This comparison is presented
below.
total* Number in parentheses represents the number of uw total .ate..,...., ------- —._ .__
sports. [e.g. There are 42 softball fields in the district, but only 17 of the 42 fields are NOT shared with other
sports.]
**Number in rntheses indicates the number of dedicated fields needed
�� 11
Study Area
NRPA
Metro
NRPA Minimum Per
Ezisting
Forecast
Supply
Minimum
Average
Service Area
Shortages
Additional
Recommended
Per
Developed
Needs
Total
Developed
Total
Study Area
Per Population
Population
Area
Tota] Area
(N dedicated)*
Area
Area
23s .mi.
38s .mi.
Baseball (under 250')
22(l)
22-24
27
46
76
5 6(10)**
24
Baseball (250'+)
12 (10)
11-15
12-13
23
38
6-8
15-16
Softball
42 17)
11-15
27
23
38
0
0
Fast Pitch Softball
12 (2)
No standard
N/S
N/S
N/S
N!A
1 N/A
Football Fields
12 3)
2-3
5-6
NIS
N/S
0
0
Full -Size Gym
5
5-6
5-6
No
No
2-3
N/A
Courts (+4200 s.f.)
standard
standard
Indoor Hockey
2
Not applicable
N/S
No
No
1
1
standard
standard
Soccer (< 300')
16 (7)
-12-14
14
No
No
(4-5)**
N/A
standard
standard
Soccer (300'+)
11 (4)
5-6
7-8
7-8
13
(34)**
6-8
Swimming Pools
0
2-3
No
No
No
2-3
3-4
standard
standard
standard
Tennis Courts
55
27
35
45-46
76
0
20-22
._, n_a:«e.. a6ee
o dnA:r�tad
and tint shared
by other
total* Number in parentheses represents the number of uw total .ate..,...., ------- —._ .__
sports. [e.g. There are 42 softball fields in the district, but only 17 of the 42 fields are NOT shared with other
sports.]
**Number in rntheses indicates the number of dedicated fields needed
�� 11
Athletic Participation and Specific Sport Needs
Increased participation in basketball and volleyball. The popularity of basketball, and to a
lesser extent volleyball, is at an all time high, nationally and locally. The number of youth and
adult basketball players. continues to rise.
Increased demand for indoor practice time. Many sports participants are playing, training and
practicing year-round for a sport that is seasonal. The demand for indoor practice space by
school and non -school groups limits gym availability.
Increased demand for lighted sports fields. Because of the extended season and increased
participation, the demand for lighted fields is becoming stronger. More and more practice times
and games are being scheduled later in the evening. Lack of adequate lighting severely limits
scheduling.
Increased demand for tournament space. Many sports are participating in more tournament
play in addition to regular season schedules. The demand is high for large sports complexes with
several play fields of one type in one area.
Lack of a competitive swimming and diving facility. The study area lacks an aquatic facility to
accommodate competitive swimming. Swimming participation is stable and is limited by available
pool time. Due to the high cost of a new or remodeled aquatics facility a study is recommended
to determine the feasibility of a regional or multi -community facility.
Increased participation in gymnastics projected for 2000. More and more children are
participating in gymnastics and are starting at younger ages, especially at times congruent with
Olympic coverage. Due to this projected increased demand, gym space and time for gymnastics
will be limited and may not meet the forecasted demand.
Unmet adult basketball and volleyball demand. Due to the lack of adult size facilities, the
number of adults than are able to participate in indoor league sports within the study area is
limited. This lack of participation is due to the lack of adequate facilities.
Increases in soccer participation. Soccer participation continues to increase and the lack of
dedicated fields is causing over -use and damage to popular facilities. Soccer participation is
limited by the field condition and shared use of the fields (i.e. use of softball outfield for a youth
soccer practice area).
Increases in hockey participation. The sport of hockey continues to grow in popularity,
especially with girls. Limited ice time on large ice sheets forces practices well into the evening on
school nights.
Increased school use of school facilities. After-school use of School District gymnasiums
continues to increase and limits youth and adult participation in indoor sports. There are only five
full size gym facilities within the School District. These courts are in constant use for athletic and
non -athletic uses (concerts, meetings events etc.).
ply QSZOC.ATE5
Study Area Recommendations
Based on analysis of athletic facility use, current supply of facilities. athletic association
participation forecasts, local and national facility guidelines and demographic and sports trends.
the following are major recommendations of the study.
Athletic facilities within the District area are generally adequate to meet existing and future
demand, with the following notable exceptions:
Additional Gym Space is Needed
There is a lack of indoor gym space for youth and adult community use. The demand for gym
space greatly exceeds current supply. School use dominates the existing school gyms and
school demand is increasing as more participate in year-round sports and multi -sport
participation increases.
Demand for gym space will continue to grow, increasing the gap between supply and demand.
The greatest deficiencies occur at the community and youth sports level. Adequate gym space
is not available for organized adult recreation use (primarily volleyball and basketball leagues)
or for youth sports (basketball, volleyball, indoor soccer practice and games). Based on the
high demand for gym space by recreational, sports, adaptive, and winter use participants, there
should be at least one additional community recreation facility (minimum two full-size gym
courts) constructed in the study area. This facility could be built in conjunction with school
facilities, if the gyms are guaranteed to be available for community use during non -school
hours.
Additional Dedicated Soccer Fields are Needed
There is a shortage of dedicated soccer fields. Soccer is the fastest growing sport in America.
The current supply of full size fields barely meets the existing need and over -use and lack of
irrigation is causing turf maintenance problems. Youth fields are also in short supply for the
same reasons. Based on local youth association use, comparisons to other Twin City area
suburbs, and growth in participation, a minimum of three large and six small soccer fields
should be dedicated. If dedication of existing fields is not possible because it would displace
another sport and cause additional shortages, new soccer fields need to be constructed and
remain dedicated to the sport of soccer. The addition of irrigation to existing soccer fields
should also be examined.
Additional Medium and Large Size Baseball Fields are Needed.
Based on national standards and comparisons to other local communities, the study area has a
shortage of medium and large size baseball and softball fields (60' and 75' base lines, 200'-
250' outfield dimensions). Interest in baseball is increasing. Five to six additional fields are
needed, preferably fields that can be adjusted to suit both sizes of play. The addition of lights
to existing (if possible) or new baseball fields is becoming a necessity with the increased
participation and extended season of the sport.
ASSOCIATES
An Additional Indoor Ice Arena is Needed.
Based on comparisons to other local communities and the high demand and interest in the
sport of hockey and related programs, the study area has a shortage of at least one ice arena.
Participation in all indoor ice sports and programs in the region is increasing; especially the
recent surge in women's hockey. Lack of existing ice space and time is limiting existing
programs and prohibiting new programs. A minimum of one ice arena is needed with
appropriate seating for tournament play.
An Aquatic Facility is Needed
Based on national standards and comparisons to other local communities, the study area is
lacking an aquatic facility for public and school programs. Existing programs are extremely
limited due to lack of space and time for practice. New public programs are not possible
without an aquatic facility. At least one aquatic facility is needed within the district currently
with the minimum requirements of two full-size swimming pools and a diving area.
A Sport Toumament Facility is Needed
There is no facility capable of hosting sports tournaments (primarily soccer, softball, baseball).
Tournaments play an important part in our sports culture and require a number of fields at one
location. Currently, no park in the study area has this capability. A minimum of five lighted
and irrigated fields is needed for a local tournament and it is desirable to have eight to twelve
fields for regional, state and national tournaments. Tournament or "Sports Complex" parks
need a minimum of 40 acres of and it is desirable to have 60 - 80 acres. The only
opportunities to acquire and build a facility of that size are north of 120` St. within the
communities that are not fully developed. Feasibility assessment and plans for a major
recreation facility (perhaps incorporating the community gyms) should be initiated in this
northern portion of the district.
INGRAHAM
ASSOCIATES
Study Participants
Birchwood Village
Kathy Weber
City of Hugo
Bob Museus
City of Vadnais Heights
Jodi Sauro
City of White Bear Lake
Mark Burch
District 624 Community Education
David A, Guenther and Steve Porter
Gem Lake
City Staff
Lino Lakes
Rick Degardener
North Oaks Homeowners Assn.
Michelle Kline
White Bear Township
Tom Reidesel
Flips Gymnastics
Lori Kindler
Metro Ringette Association
Andrew Ervin
Metropolitan Council
Michael Munson
White Bear Babe Ruth Baseball
Glen Reimer
White Bear Basketball Association
Jeff Mitchell
White Bear Fastpitch
Michael Koch
White Bear Hockey Association (W.B.A.H.A.)
Tom Godbout
White Bear Lake Speedskating Association
Roger & Sue Bauer
White Bear Lake Swimming & Diving
Greg Moos
White Bear Lake Volleyball Association
Barry Rittenhause
White Bear Soccer Club
Tom Couiilard
White Bear Wrestling Club
Fred Schostag
White Bear Youth Football Association
Lyle D. Hoff
INCRANAM
ASSOCIATE`
APPENDIX
IXORANAM
ASSOCIATES.
Athletic Facility Projects Since 1998 Athletic Facilities Study
1999 — Otter Lake Elementary ball field renovation. Funded mainly through the Fastpitch
Softball Association. Added two additional fields with all four fields now
irrigated.
1999 — Vadnais Elementary School ball fields were renovated in partnership with the
City of Vadnais Heights. Two small fields were improved with irrigation and
grading.
1999 — White Bear Township added an irrigated soccer field at Columbia Park.
1999 — Complete renovation of South Campus practice field area. Grading and irrigation.
No new fields were added.
2001 — White Bear Township Polar Lakes Park completed. Four irrigated baseball fields
(two lighted) and two lighted, irrigated soccer fields.
2001— City of White Bear Lake renovated Podvin Park. Took out one softball field and
replaced it with two lighted, irrigated football/soccer fields.
2001 — City of Hugo created Beaver Ponds Park. One mid size irrigated soccer field.
2001— Louricas fields renovated. Two softball fields were removed and the area was
graded. Due to high water table this area is not suited to irrigation.
2002 — Central Middle School fields renovated. Area was graded and irrigated with no
fields added.
2003 - Sunrise Park Middle School fields graded and irrigation added. Playing area in
northeast comer was added.
2004 — City of Vadnais Heights renovated Berwood Park to include an irrigated ball
field and full size soccer field.
2007 - Full size gym added at Oneka Elementary School in partnership with
the City of Hugo. A baseball field and two — three soccer areas were also added.
All with irrigation.
2007 — City of Hugo created Diamond Point Park. One small irrigated ball field.
2008 — School District ball fields at Bellaire, Lakeaires, Parkview (Matoska), ALC,
Lincoln, Birch, Willow and two at South Campus were renovated with new
backstops, aglime, benches and fencing.
2008 — City of Vadnais Hts. Added a picnic shelter to Kohler Meadows Park.
2009 — White Bear Township adds irrigation to the "lower level' soccer fields at Polar
Lakes Park.
2010 — City of Hugo created Hanifl Park. Five full size irrigated soccer fields shared with
four school districts.
2010 - YMCA remodel — City of WBL, WB Township WBL Area Schools are partners.
2010 — City of Vadnais Hts. Partners with private non profit to create the Vadnais Sports
Center. Two ice sheets and indoor multi sport dome. Also built a new warming
house with an outdoor rink with portable boards at Community Park.
2010 — City of WBL renovated the Stellmacher Park ballfield.
2011 — City of Vadnais Hts. regraded and expanded the socceribaseball areas at Westfield
Park.
2012 — City of Vadnais Hts. added lights to the tennis courts at Kohler Meadows.
3.
1998 Athletic Facility Study - History
How We Started
In June of 1997, residents of the White Bear Lake Area School District formed a new
Athletic Association. The White Bear Area Athletic Association (WBAAA) represented
most of the major athletic associations within the community. While the group
established six goals for the year, meeting after meeting gravitated toward a discussion on
the lack of facilities for our young athletes.
In the fall of 1998, the WBAAA, along with several local municipalities and the School
District, sponsored an athletic facilities study to determine the adequacy of the facilities
in the school district.
The Study Results
The study indicated need in several areas to include: soccer fields, baseball fields, indoor
ice sheet and aquatic facilities. The results were presented to a group of elected officials,
community members and school district and municipal staff.
Over the course of the next 14 years this study influenced several significant facility
improvements in our school district. A group of staff from the various municipalities and
the School District began to meet and look at these challenges in a more regional way.
The Projects
The City of Hugo committed to creating the Hanifl soccer complex and worked with the
School District to enhance the gymnasium at the new Oneka elementary school. White
Bear Township added soccer fields and full size baseball fields at Polar Lakes Park. The
City of White Bear Lake upgraded Podvin Park to create an irrigated soccer/football
complex. The City of Vadnais Heights built Kohler Meadows Park with baseball, softball
and soccer fields. The School District upgraded all of their ball fields including irrigation
for the fields at the secondary schools. These were all major outdoor facility
improvements for this community.
Next came work on major indoor facilities. The School District had been unsuccessful in
seven attempts to build a pool(s) in the district, the local YMCA was in need of updating
and several municipalities had heard from residents that we need a community center. In
the fall of 2009, the School District, the YMCA, the City of White Bear Lake and White
Bear Township executed agreements that have allowed a major renovation and expansion
of the existing YMCA facility. The upgraded facility serves as the "home pool' for the
White Bear Lake Area High School boys and girls swim teams and provides space to do
other community water-based safety programs.
The most recent project, completed in November 2010, is an indoor hockey/skating
facility with two rinks and a large dome built through the efforts of a private non profit
group and the City of Vadnais Heights.
What is Going on Now?
While these have been significant accomplishments, there is still work to do.
Over the past four years staff from the Cities of White Bear Lake, Vadnais Heights,
Hugo, WB Township, and the White Bear Lake Area School District have been meeting
on a quarterly basis to discuss a number of things. Somehow, just like the original White
Bear Area Athletic Association, many of our meetings have included discussion on
athletic facilities. Numerous updates on facilities have been given to this group along
with the School Board. These updates have listed new facilities, but, have not compared
facilities to current and projected use. This group feels that it is time to do another
athletic facilities study.
Agenda Number: 1 1 f_
CITY OF HUGO
PARKS COMMISSION REPORT
TO: City of Hugo Parks, Recreation and Open Space Commission
FROM: Shayla Syverson, Parks Planner
SUBJECT: LaValle Properties Concept Plan
DATE: Septemberl9, 2012 for the Parks Commission meeting of September 26,
2012
1. BACKGROUND:
A concept plan has been submitted to the City of Hugo for feedback on the development
of 5 vacant parcels of land adjacent to Lions Park. The properties, generally located west
of Lions Park and north of Frenchman Road, are currently owned by Marvin LaValle.
The applicant Bill Lentsch, is proposing to develop 3 multi -family residential buildings.
The first phase would include an Assisted Living facility, followed by a CommonBond
apartment building, and then a Congregate Care facility. At their meeting of September
13, 2012, the Planning Commission reviewed the concept plans and provided feedback.
The applicant is seeking feedback from the Parks Commission on park dedication and
this concept plan prior to moving forward with the formal application process for
development approval.
2. CONCEPT PLAN:
The applicant intends to apply for a Planned Unit Development (PUD) to accommodate
the density that is proposed. The majority of LaValle's properties are guided as Mixed
Use (MIX) and a small portion as Medium Density Residential (MD) according to the
2030 Land Use Plan. The density proposed for this development is anticipated to comply
with the standards stated in the Comprehensive Plan's Land Use requirements.
General Layout
The concept plan shows an overall campus layout containing residential development of
three 3 -story buildings along the southern portion of the property with the expansion of
-1-
Prairie Village
June 9, 2010
Lions Park taking up the northern portion. The buildings are laid out to follow the
contours and perimeter of the property. The buildings on the west of the property are
situated to obtain a vista of the adjacent wetlands. There are several above ground
parking lots and underground parking lots shown within the development. The plan also
shows areas of future building expansions and parking if the development were to grow.
Road Construction & Access
The concept plan shows the proposed development will be accessed off of Upper 146th
Street and 146th Street with private driveways. Staff has been working with the
developer to ensure that 147" Street expands west to Oneka Parkway, as described in the
City's transportation plan. 147x' borders the north side of Lions Park.
The Developer's concept plan shows the elimination of Finale Avenue between 147th
Street and 146"' Street. This does not pose traffic issues because the road is
underutilized, and it will not be necessary to service the proposed development. The
proposed Lions Park Concept Plan by WSB & Associates shows Finale Avenue to
remain. Finale Avenue is currently in rough condition and will need to be extensively
repaired to adequately serve the proposed development and the park. These repairs will
be needed whether or not Finale Avenue is eliminated between 147th Street and Upper
146th Street. It is likely that a connection will be made to the south to Frenchman Road.
Housing Types
The housing shown in the concept plan is proposed to be a three story Assisted Living
Facility with 100 units, a three story CommonBond apartment building with 54
affordable housing units, and a three story Congregate Care center with 90 units. There
will be 244 units in total when the development is fully complete. The plan also shows
the location of other phases, should additional building capacity be needed.
Drainage Options
The concept plan shows two proposed drainage options- a pond on the northern portion
of the property and rain gardens along the western edge of the property. The pond on the
northern portion of the property would provide the main source of storm water
management. The pond will control the discharge into the wetlands. Staff will work with
the applicant to determine whether or not the size of this pond is appropriate for the
development and meets the requirements. The rain gardens will also be evaluated in
terms of size and function.
3. CONSISTENCY WITH THE DOWNTOWN PLAN:
The Downtown Plan focuses on the redevelopment of the area around City Hall,
including the properties included in the concept plan. The Downtown Plan shows an
expansion of Lions Park with the incorporation of a Community Center in the northern
portion of LaValle's property, and an extension of a traditional residential area in the
-2-
Prairie Village
June 9, 2010
southern portion. Finale Avenue is planned to extend to the south to connect with
Frenchman Road, which will allow direct access into the site. Upper 146th Street and
146th Street are planned to extend to the west to continue the flow of the residential grid
system.
4. CONSISTENCY WITH THE PARKS PLAN:
Park Development
Lions Park is guided to continue to serve as a significant central gathering area for the
community and host to large events. The development of community park facilities
conveniently located near residential populations was a major component of the park and
recreation vision expressed by the residents of Hugo at the time the Parks Plan was put
together. Additional indoor and outdoor multi -use recreation facilities are needed in the
community. Facilities may include a fitness center, indoor ice arena, and areas for
passive activities like picnicking and walking. The Parks Plan supports park
development which preserves and utilizes Hugo's natural resources and open space areas
including lakes, wetlands, and woodlands. An expansion of Lions Park would allow for
more event space and construction of additional park features.
Trails
Currently, Lions Park is connected to the Hardwood Creek Trail and via neighborhood
roads to the County -owned trail along Frenchman Road. City sidewalks are planned in
the neighborhood adjacent to Lions Park. A City trail is anticipated along 147`x' Street
when it expands to provide a connection to Oneka Parkway and beyond. The applicant
has shown a network of trails and paths throughout their development linking to Lions
Park. The developer will be required to make public improvements such as sidewalks
and roadways.
Lions Park Master Plans
At this time, the Parks Commission has been working with residents and other
stakeholders to master plan Lions Park with the help of WSB & Associates. Public input
has directed that the plan be focused on an organic shape and have a large building as
well as a large open space for events. Neighborhood recreation amenities will be
included to provide for the surrounding residential areas. Several options for parking and
circulation around the park have been discussed. Pedestrian connections within the park
and to nearby trails has been important. Other features discussed to be included at Lions
Park are concert -style seating, a water features and space for temporary event structures.
5. PROPOSED PARK DEDICATION:
Developers are required to pay park dedication to ensure that the parks system provides
for the recreation needs of the additional residents the development brings. The
developer may dedicate land or pay a fee. Typically, a combination of fees and land
-3-
Prairie Village
June 9, 2010
dedication is used to meet the requirements. The Parks Commission evaluates each
proposed park dedication in conjunction with the formal application process for
residential development approval to ensure that is in keeping with the Parks Plan and
provides a recommendation to the City Council.
The developer is proposing to build 244 units on 14.44 buildable acres. The current fee
(which is annually set by the City Council), is $2,400 per unit. The developer could be
required to pay $585,600 in park dedication fees in lieu of land.
The Park Dedication Policy includes a sliding scale for land dedication. Therefore, a
high density development (over 10 units per acre) such as being proposed, 17% of the
buildable land shall be dedicated. Therefore, the developer would be required to dedicate
2.45 acres in lieu of paying the fee.
The developer is looking to dedicate land in lieu of paying park dedication fees. The
concept plan shows an expansion of Lions Park across Finale Avenue and over the
northern portion of their property. There is a stormwater pond proposed to take up a
majority of the dedicated park land, which is not typically an acceptable option for the
substitution of park dedication fees. The developer would like to show how the pond
may be used for a recreational purpose.
6. STAFF RECOMMENDATION:
Staff recommends direction be given to the developer on the proposed park dedication for
the LaValle properties located west of Lions Park. In the future, when the developer
formally applies for development approval, a proposed park dedication will be reviewed
by the Parks Commission for a formal recommendation.
At this time, feedback should be given to the developer including:
1) Expansion of Lions Park to the west
2) Access/ Transportation (Finale Avenue or Fitzgerald Avenue)
3) Connections of trails and sidewalks
4) Proposed pond
7. ATTACHMENTS:
1) Park Dedication Policy & Fee Schedule
2) Downtown Plan
3) Lions Park Preliminary Master Plan
4) Location Map
5) Proposed Site Plan*
*Please note that the Architect received the 3 concept plan alternatives presented at the
Stakeholder meeting of August 8, 2012 but has not heard the public's input or seen recent
changes to the plan.
-4-
Prairie Village
June 9, 2010
Municode
http: //1 i brary.inuni code. com/print. aspx?h=&cl i entrDk 14356&HTMReque...
is
Sec. 90-324. - Park dedication.
(a) General dedication standards. In order to develop a system of parks within the community to serve
the public's health and recreational needs, a percentage of the net buildable acreage based on the
density of all land subdivided for residential purposes shall be dedicated to the city as public
parkland. The city finds that the more dense a development is, the more demand for park land it
creates since lots can be smaller affording less private recreational space and more occupants per
acre. The following formula will be used to determine the dedication requirement where a land
dedication is required:
Density
Percentage of Land to be Dedicated (of the buildable land)
—3.99 units per acre
10 percent
4.00-5.99 units per acre
11 percent
6.00-7.99 units per acre
13 percent
8.00-9.99 units per acre
15 percent
10.00 < units per acre
17 percent
The land so dedicated shall be subject to approval by the city council in accordance with the city's
Comprehensive Plan for parks. At the city council's discretion, a parkland dedication fee may be accepted
or required instead of or connection with land dedication. The parkland dedication fee shall be set annually
by the city council and adopted as part of the city's fee schedule. The parkland dedication fee shall be
charged for each dwelling unit originated by the subdivision or development of any property in the city, not
including any dwelling unit that may be in existence at the time of the adoption of the ordinance from which
this article is derived, or which is subject to an approved development agreement with the city that includes
a parkland dedication provision.
(b) Appeal process. The parkland dedication fee may be appealed to the city council before the city
council makes a decision on the final plat and shall be calculated as follows: The percentage of land
to be dedicated will be multiplied by the fair market value of the net buildable acreage.
The fair market value shall be determined by the city council, following their review of a current
appraisal submitted to the city at the developer's expense. The appraisal shall be made by appraisers who
are approved members of the SREA or MAI, or equivalent real estate appraisal societies.
If the city receives written notice of a dispute over the parkland dedication fee before approval of the
final plat, the developer shall pay the fee into an escrow account pending a decision of an appeal of the
fee. If an appeal is not filed within 60 days following approval of the final plat, or if the person aggrieved by
the fee does not prevail on the appeal, then the funds paid into escrow must be transferred to the city.
(Prior Code, § 1215-040.1; Ord. No. 2010-449, § 1, 11-15-2010)
1 of] 10/5/2012 2:23 PM
0
a
Ali
Z--- -, a
7"
RO
City of Hugo
March 15, 2010
Fl ❑
r
L
Ali
Z--- -, a
7"
RO
City of Hugo
March 15, 2010
I /(e
r _
- bl';: 6A. lY_l• 1$:• .i i ,.off
1� � Its(-- pxs' ''' :"- ♦�'r'^
I
-'U— rut_' �nnBliilefikullilig :Pti i � .aL � _ t r ►r � r; _
PLAN HIGHLIGHTS:
• Combined City Hall / Park
Entrance and main parking area
• Continuous pedestrian -way
between City Hall and Park
• Additional off street parking
• (4) Designated Vehicular
Event Access Points
• One main parking building
• Centralized plaza space
• Age separated play features
• Highly visible Basketball
court and Skate park
• Significant amount of open
space for flexibility of use
• Bay Parking = 45 spaces
• City Hall Parking = 25 spaces
GRAPHIC SCALE
RAUER & ASSOCIATES, LTD.
a;,sl ;'ss,..
-01 xrma A,,nue s LLb ,mN too
MinneaPnL�. Mi„ i5llfi
x wvasb�nz ni
HLIGO
P1,111.11 04 390
SI,temb= Lalb MM2
Prelim�oanMaaei Plan Rrmc..
SECTION A -A'
147TH
ct
® Parking Bay ® ® =I® ® Parking Bay 7�000�i
Connect to Regional
Trail System
Picnic Table - typ.
Bench Seating - Open Lawn Space O m
• 'Carnival' space
p• r • Family picnic area -�5 0
a
Temporary Event
W
Fencing - typ. N
General Skating \ LL Water Plaza
& ConcertCentralized water feature
Seating \ , J _ • Seating areas
• (-150' x 250'J , ql. j�- > /�' Planting areas
.. a
City Hall Parking
— 25 spaces
Closes Fitzgerald to thru-traffic
`: ' • Allows for continuous pedestrian -
way connection too parkpark
Multi -Purpose
Park Building
• Lions storage
2
Kitchen • Restrooms .•L. ', '''.�
• Picnic shelterLL : •F' - - _ •
• Raised stage � --
® 1
NOME
CITY
•
HALL
Vehicular Event /
Access Points -
typ. -
• Concrete apron parking Bay s / a Parking Bay
& curb cut
UPPER 146TH
Active Neighborhood Recreation Ornamental Sculpture / Sign
• Picnic shelter Fencing - typ. • Raised platform
• Multi-age play equipment • Planting area Connect to Regional
• Skate park • Basketball court Trail System
• Age separation between facilities
• Bike racks, Drinking fountain, Trash receptacles
3,
Site Map
LaValle Properties
H#
I�V
1 inch = 300 feet
1 inch = 300 feet
c�
(66 Units)
Hatched Region Represents Area
Dedicated to City Parks
Aproximately 3.4-3.5 Acres AA
lands
ngragate Care Units
) Units)
Rain Garde
7
3
A
a
. Future
Units
Future Parking
Future Phase iI
2
-r-At.4- i ' ;r�
146th Stre
147th Street
r rI ,
I �
Parking
Vendors
Picnic
Shelters
ve Neighborhood Recreation
r r r r.
us Stop
* Parking
Upper 146th Street
Common Bond
(54 Units)
Qa
��
a�
" Garden
Large
Lawn
Space
LYONS PARK & RESIDENTIAL DEVELOPMENT
CITY OF HUGO & PARTNERSHIP DEVELOPMENT GROUP
_ _,—
Connection to City
Trail System