Loading...
HomeMy WebLinkAbout2012.09.26 Parks PacketCopies to: I. 7:00pm II. 7:02pm III. 7:05pm IV. 8:25pm V. 9:00pm Agenda Parks Commission, City of Hugo September 26, 2012 7:00 pm Oneka Room, City Hall Commission Members, City Staff Approve Minutes From August 8, 2012 Meeting Agenda Review Presentation of the Lions Park Preliminary Master Plan LaValle Properties Park Dedication Adjournment Next Meeting - October 10, 2012 -1- Parks Commission September 26, 2012 Background Memo Approve Minutes From August 8, 2012 Meeting Staff recommends approval of the minutes from the August 8, 2012 Parks Commission meeting. II. Agenda Review In the summer of 2011, the Parks Commission began gathering public input to put together a master plan for Lions Park. At the Parks Commission meeting of September 26, 2012, Brauer and Associates will make a presentation of a Preliminary Master Plan and gather feedback from stakeholders, public and the Parks Commission. Following the discussion on the Lions Park Master Plan, the Parks Commission will be asked to provide feedback on a development adjacent to the Lions Park. The developer is seeking informal feedback on park dedication options, including expansion of the park, prior to applying for a formal review of the potential development. III. Presentation of the Lions Park Preliminary Master Plan Amanda Prosser, Landscape Architect from WSB & Associates, formerly Brauer & Associates will present the Lions Park Preliminary Master Plan. The Preliminary Master Plan includes an outline of next steps: schematic design, design development and preparation of construction documents prior to construction. Prosser will gather feedback from the public, stakeholders and the Parks Commission. Staff recommends that a recommendation be made to the City Council for approval of the Lions Park Master Plan with revisions as discussed. IV. LaValle Properties Park Dedication Planning Intern Liz Hanson and Parks Planner Shayla Syverson will make a presentation about a potential development and park dedication for properties owned by Marvin LaValle located immediately west of Lions Park. The Developer, Bill Lensch, will be present to gather feedback from the Parks Commission on park dedication options prior to applying for formal approval of the proposed residential development. -2- Parks Commission September 26, 2012 I Minutes Parks Commission, City of Hugo August 8, 2012 7:00 P.M. Council Chambers, City Hall Call to Order Present: Kris Birch, Joan Benner, Rachel Berger, Chris Boland, Roger Clarke, Mat Rauschendorfer, Dave Strub, Jim Taylor, Tom Windisch Staff Present: Scott Anderson, Public Works Director Shayla Syverson, Parks Planner Debi Close, Secretary Jim Taylor called the meeting to order at 7:30 p.m. I. Approval of Minutes from June Meeting Strub made a motion, Windisch seconded to approve the minutes of the June 13, 2012 Parks Commission meeting. U. Lions Park Master Planning Update Parks Planner, Shayla Syverson gave an update on the stakeholder meeting held on Wednesday July 11`h, 2012 the Lions Park master plan. Prior to the Parks Commission meeting, stakeholders gave feedback on three concept plans prepared and presented by Amanda Prosser of WSB & Associates. The next steps in master planning Lions Park include compiling the feedback and preparing a single preliminary master plan for review. Parks Commission agreed to change the next commission meeting date to incorporate the feedback from the August 8'h, 2012 stakeholder meeting. III. Presentation from Tori Gabrielson Tori Gabrielson addressed the commission requesting a neighborhood park for the kids that live north of the Hugo Fire Hall. Her presentation included giving more options for good choices to the teens in her neighborhood. Taylor discussed that the Hardwood Creek Tail will be extended South to 140`" in 2014 which will provide a safe way to access nearby parks. Taylor thanked Gabrielson for bringing this issue to the Parks Commission. Commissioners agreed that this need will continue to be remembered in future goal setting and planning efforts and residential development continues in the area. Parks commission members commended Tori for all the work put into the request and for bringing this need to their attention. IV. Recreation Program Updates Parks Planner, Shayla Syverson updated with on all current and upcoming recreation events. Park play dates running June 19`h through July 26th. Parks hosting included Diamond Point, Arbre, Beaver Ponds and Oak Shore. The activities had solid participation and trends were recognized in attendance subject to weather, location and time. Next summer there will be additional advertising including more flyers and Facebook to get the word out. Skyhawk's Sports Camp was held August 13 — 16th 2012. Sixteen kids signed up and played T -ball, basketball and soccer. The Flag Football Camp, geared towards older youth, was cancelled due to small registration numbers. Kidcreate Studio's Art Camps will be on August 21 — 27th, 2012. Camps include Cuddly Critters, Angry Birds, App art for ipod/phones and a PJ Art Party. Tour de Hugo will be on September 15th, 2012. Sponsors are excited for the event with $1200. in donations received so far. The bike safety rodeo will be included this year and rides are mapped out to be 5, 18 and 26 mile courses. Movie Night in the Park September 14, 2012 at sunset showing How to Eat Fried Worms. Games will start at 7:OOpm and snacks will be provided for the movie. V. Adjournment Windisch made a motion, Strub seconded to adjourn the meeting at 8:40 pm. All Aye. BRAUER & AssOCIATEs, LTD. Lions Park Master Plan Project City of Hugo, MN August 8, 2012 Concept Review Meeting Summary Overview: The preliminary concept review open house meeting for the Lions Park planning process was attended by approximately 10 people. The goal of the meeting was to determine the amenities desired and the preferred arrangements of the various features. There was good discussion among the participants with most of the audience contributing to the conversation. Overall, Concept #3 was preferred which focuses on an organic shape and having one large building that supports kitchen, restrooms, storage, picnicking cover, etc. It also allows for a large open space for informal ball games or events. Some of the main topics covered at the meeting included: I. Main Park Building 1. One main park building should be included that has enough space to accommodate a kitchen, restrooms, Lions storage and has covered space for summer picnic use and winter skating. 2. Further exploration into size requirements will be made along with researching manufactured buildings that could be modified for these requirements. 3. The building location works well with future development to the west - building could serve both users. 11. Neighborhood Recreation Area 1. The neighborhood active recreation area should also include hardcourt space for 1/2 court basketball. This could be placed adjacent to the skate park area as these two activities usually relate to older kids. 2. The skate park should be located in a highly -visible area of the park. 3. A backstop should be included within the open lawn space. However, a defined ball field should not be included. 701 Xenia Avenue South, Suite 300 Minneapolis, MNS5416 III. Parking / Circulation 1. Fitzgerald should be closed off with drop-off areas for City Hall and the park. 2. A combination of bump out parking spaces along the street and parking lots within the park should be incorporated. 3. Lawn space for large -event parking should be allowed for. 4. Direct connections between the parking lot and the shelter should be considered. 5. The continuity between City Hall and the park is important and this element should be incorporated into the final plan. 6. Promoting pedestrian connections to the surrounding neighborhood and regional trail will be important as the city grows. 7. The use of large trucks during events should be acknowledged and accommodated, as best able to, in the design of the park master plan. IV. Misc. Items 1. The concert -style seating area was well -accepted and allows for flexible use of the space when performances are not taking place. 2. The idea of a portable tent was not well-received as shown in Concept #1 ft #2. 3. A water feature should be incorporated either at the main park / city hall entrance or at the performance stage area. 4. There is still some debate whether a raised stage for a portable 'show -mobile' should be included or if a permanent structure should be built with a raised stage. This is something that could easily be phased in over time should the demand warrant a permanent structure. 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Preliminary Master Plan Cost Estimate Lions Park - City of Hugo, MN September 26, 2012 Brauer & Associates, Ltd. Project #1904-390 This cost estimate defines the estimated costs associated with each component of the master plan update for Lions Park. It is based on a combination of site-specific development requirements and projects of similar size and complexity. These estimated costs are also based on having the work completed by private contractors and specialists. It does not take into consideration work that could be performed by City staff, volunteer groups, or by other means. The cost figures are based on master plan level evaluation, which brings with it inherent limitations. The cost figures are meant for general budgeting proposes, project phasing, and comparing the relative cost of one item to that of another. The costs are in 2012 dollars. Although intended to be conservative, actual costs will vary depending on the year that each aspect of the master plan is implemented, implementation parameters, economic conditions affecting bidding, and unexpected site conditions found in the field during construction. Park Ira roxement Description coat Range Estimate # 1 - Removals, Earthwork and Surveying Low High 1 Removals 30,000.00 34,500.00 2 JEarthwork operations (including erosion control) 40,000.00 46,000.00 3 ISuiveving 10000.00 11,500.00 Estimated Subtotal (includes 10% contingency and 15% testing, cd's and surveyingfees) $100,000.00 $115,000.00 # 2 - Utilities, Lighting and Irrigation Improvements Low High 1 Utility adjustments 30,000.00 34,500.00 2 General Lighting Improvements and electrical upgrades (budget) 200,000.00 230,000.00 3 Irrigation modifications and expansion bud et 50 000.00 57 500.00 Estimated Subtotal (includes 10% contingency and 15% testing, ed's, and surveying fees) $350,000.00 $402,500.00 # 3 -Park Improvements Low High 1 4" thick concrete pavement 23,000.00 26,450.00 2 Event vehicular access points (concrete apron and walkway) 31,200.00 35,880.00 3 As haltnail 137,500.00 158,125.00 4 Parking lot improvements (includes pavement, curbing, striping and signage) 100,000.00 115,000.00 5 Asphalt parking bays with concrete curb and gutter 70,000.00 80,500.00 6 1/2 court basketball with striping 10,000.00 11,500.00 7 Skate Park (includes concrete pavement, 6'high fencing, and relocation of equipment) 55,000.00 63,250.00 8 Fountain wall 63,000.00 72,450.00 9 Decorative fountain (budget) 20,000.00 23 000.00 10 Trash receptacle 9,600.00 11,040.00 11 Bike rack 4,500.00 5,175.00 12 Picnic table (does not include tables under main park building) 30,000.00 34,500.00 13 Bench seating 15,600.00 17,940.00 14 Drinking fountain (assumes water source nearby) 5,000.00 5,750.00 15 36" high decorative fencing 50,000.00 57,500.00 16 12" wide concrete maintenance strip for decorative fencing 6,000.00 6,900.00 17 Park & City Hall Sculpture / Sin 40,000.00 46,000.00 18 Play area concrete curbing 12,600.00 14,490.00 19 Play area poured -in-place surfacing 78,000.00 89700.00 20 Wood fiber safety surfacing 7,500.00 8,625.00 21 IPlav etrumment(bud (budget) 75,000.00 86,250.00 22 Picnic Shelter (budget) 40,000.00 46,000.00 23 Multi-purpose building (includes 2 restrooms, kitchen, storage, open-air pavillion, stage) 750,000.00 1,000,000.00 24 Turf reinforcement for building service drives 26;400.00 30,360.00 25 Turf restoration 27,000.00 31,050.00 26 Tree and shrub plantings 20 000.00 23 000.00 Estimated Subtotal (includes 10% contingency and 15% testing, td's, and surveying fees) 1 $2,133,625.00 $2,625,543.75 Total estimated construction cost: $2,583,625.00 $3,143,043.75 Brauer Associates, Ltd. Ki01904-390V.-Arch IDOCSU904-390 Lions Park- mosterplan cost est Pagel f2 The next steps... Master planning for the proposed improvements was the first step in making the public's ideas become reality. This level of design sets the purpose, goals and general guidelines for the project. As fundingbecomes available to proceed with part or all of the improvements, design refinements will be required. The process of design is intended to raise and answer questions in a logical manner. Working from the broad concepts framed by the Master Plan to the detail of construction documents, each step is intended to give affected parties the information required to proceed or revise the design. In order of refinement, the following are the normal steps taken toward realizing the proposed improvements of any given project: Schematic Design This portion of the design process is intended to give the owner and others more detailed plans and sketches and cost estimates to allow for informed decisions regarding space requirements, proportions, and appearance and cost alternatives. Design Develooment This step is a further refinement of drawings and estimates of cost. Issues conceming project systems should be explored along with material choices and construction techniques. These alternatives and their probable cost/benefit must be investigated to insure a design that will be in compliance with available funding and provide a project that is maintainable. The owner and consultant should review the design development documents with affected agency reviewers to receive guidance on the projects potential approval, the approval process and the likely time required in formal agency Construction Documents and Agency Review & Approvals These documents are prepared for cost effective bidding m negotiation of the project construction and will form a part of any contract with a contactor. All systems, materials and dimensions must be described and accurately depicted to give contractors guidance as to the final project requirements. In addition to construction documents being used for construction they also are the final documents used in any agency approval process. Potential agency i permit reviews may include the following: city grading, city building, city water connection, etc. Brauer Associates. Lid. K. 101904-390L ArchIDOM1904-390 Lions Park - master plan cos? eat Page 2 aft e_ • F HUGO, M INN ESOTA 'ti� PLAN HIGHLIGHTS: • Combined City Hall / Park Entrance and main parking area • Continuous pedestrian -way between City Hall and Park • Additional off street parking • (4) Designated Vehicular Event Access Points • One main parking building • Centralized plaza space • Age separated play features • Highly visible Basketball court and Skate park • Significant amount of open space for flexibility of use • Bay Parking = 45 spaces • City Hall Parking = 25 spaces oe . V 40' V as 120' GRAPHIC SO i RAUEk & ASSOCIATES, LTD. - A, o%!dSO 7+.As llluttes, In, Col firma -sur tnnlh. Only 500 Minnaa...1 , MN 51416 ,.re a. sbenp mm 4 H[UGO Njoct#1901190 Septra eF 251h, 2011 PRelimmaer Master Plan Resim Bench Seating - typ Temporary Event Fencing - typ. General Skating & Concert Seating • (-150' x 250') Multi -Purpose Park Building • Food Shelf • Lions storage Kitchen • Restroom. • Picnic shelter • Raised stage Vehicular Event Access Points - typ. • Concrete apron & curb cut SECTION A -A' Parking Bay UPPER 146TH Z - Active Neighborhood Recreation – • Picnic shelter • Multi-age play equipment • Skate park • Basketball court • Age separation between facilities • Bike racks, Drinking fountain, Trash receptacles M Open Lawn Space • 'Carnival' space • Family picnic area N Ornamental — Sculpture / Sign Fencing - typ. - Raised platform • Planting area r 14/TH Connect to Regional Trail System Picnic Table - typ. City Hall Parking - 25 spaces j • Closes Fitzgerald to thru-traffic • Allows for continuous pedestrian - way connection to park Lij 10 . Connect to Regional. Trail System _ , i; N LL Water Plaza • Centralized water feature • Seating areas • Planting areas City Hall Parking - 25 spaces j • Closes Fitzgerald to thru-traffic • Allows for continuous pedestrian - way connection to park Lij 10 . Connect to Regional. Trail System _ , Agenda Number: IV CITY OF HUGO PARKS COMMISSION REPORT TO: City of Hugo Parks, Recreation and Open Space Commission FROM: Shayla Syverson, Parks Planner SUBJECT: LaValle Properties Concept Plan DATE: Septemberl9, 2012 for the Parks Commission meeting of September 26, 2012 BACKGROUND: A concept plan has been submitted to the City of Hugo for feedback on the development of 5 vacant parcels of land adjacent to Lions Park. The properties, generally located west of Lions Park and north of Frenchman Road, are currently owned by Marvin LaValle. The applicant Bill Lentsch, is proposing to develop 3 multi -family residential buildings. The first phase would include an Assisted Living facility, followed by a CommonBond apartment building, and then a Congregate Care facility. At their meeting of September 13, 2012, the Planning Commission reviewed the concept plans and provided feedback. The applicant is seeking feedback from the Parks Commission on park dedication and this concept plan prior to moving forward with the formal application process for development approval. 2. CONCEPT PLAN: The applicant intends to apply for a Planned Unit Development (PUD) to accommodate the density that is proposed. The majority of LaValle's properties are guided as Mixed Use (MIX) and a small portion as Medium Density Residential (MD) according to the 2030 Land Use Plan. The density proposed for this development is anticipated to comply with the standards stated in the Comprehensive Plan's Land Use requirements. General Layout The concept plan shows an overall campus layout containing residential development of three 3 -story buildings along the southern portion of the property with the expansion of -1- Prairie Village June 9, 2010 Lions Park taking up the northern portion. The buildings are laid out to follow the contours and perimeter of the property. The buildings on the west of the property are situated to obtain a vista of the adjacent wetlands. There are several above ground parking lots and underground parking lots shown within the development. The plan also shows areas of future building expansions and parking if the development were to grow. Road Construction & Access The concept plan shows the proposed development will be accessed off of Upper 146th Street and 146th Street with private driveways. Staff has been working with the developer to ensure that 147" Street expands west to Oneka Parkway, as described in the City's transportation plan. 147"' borders the north side of Lions Park. The Developer's concept plan shows the elimination of Finale Avenue between 147`x' Street and 146`x' Street. This does not pose traffic issues because the road is underutilized, and it will not be necessary to service the proposed development. The proposed Lions Park Concept Plan by WSB & Associates shows Finale Avenue to remain. Finale Avenue is currently in rough condition and will need to be extensively repaired to adequately serve the proposed development and the park. These repairs will be needed whether or not Finale Avenue is eliminated between 147th Street and Upper 146th Street. It is likely that a connection will be made to the south to Frenchman Road. Housing Types The housing shown in the concept plan is proposed to be a three story Assisted Living Facility with 100 units, a three story CommonBond apartment building with 54 affordable housing units, and a three story Congregate Care center with 90 units. There will be 244 units in total when the development is fully complete. The plan also shows the location of other phases, should additional building capacity be needed. Drainage Options The concept plan shows two proposed drainage options- a pond on the northern portion of the property and rain gardens along the western edge of the property. The pond on the northern portion of the property would provide the main source of storm water management. The pond will control the discharge into the wetlands. Staff will work with the applicant to determine whether or not the size of this pond is appropriate for the development and meets the requirements. The rain gardens will also be evaluated in terms of size and function. 3. CONSISTENCY WITH THE DOWNTOWN PLAN: The Downtown Plan focuses on the redevelopment of the area around City Hall, including the properties included in the concept plan. The Downtown Plan shows an expansion of Lions Park with the incorporation of a Community Center in the northern portion of LaValle's property, and an extension of a traditional residential area in the -2- Prairie Village June 9, 2010 southern portion. Finale Avenue is planned to extend to the south to connect with Frenchman Road, which will allow direct access into the site. Upper 146th Street and 146th Street are planned to extend to the west to continue the flow of the residential grid system. 4. CONSISTENCY WITH THE PARKS PLAN: Park Development Lions Park is guided to continue to serve as a significant central gathering area for the community and host to large events. The development of community park facilities conveniently located near residential populations was a major component of the park and recreation vision expressed by the residents of Hugo at the time the Parks Plan was put together. Additional indoor and outdoor multi -use recreation facilities are needed in the community. Facilities may include a fitness center, indoor ice arena, and areas for passive activities like picnicking and walking. The Parks Plan supports park development which preserves and utilizes Hugo's natural resources and open space areas including lakes, wetlands, and woodlands. An expansion of Lions Park would allow for more event space and construction of additional park features. Trails Currently, Lions Park is connected to the Hardwood Creek Trail and via neighborhood roads to the County -owned trail along Frenchman Road. City sidewalks are planned in the neighborhood adjacent to Lions Park. A City trail is anticipated along 147d' Street when it expands to provide a connection to Oneka Parkway and beyond. The applicant has shown a network of trails and paths throughout their development linking to Lions Park. The developer will be required to make public improvements such as sidewalks and roadways. Lions Park Master Plans At this time, the Parks Commission has been working with residents and other stakeholders to master plan Lions Park with the help of WSB & Associates. Public input has directed that the plan be focused on an organic shape and have a large building as well as alarge open space for events. Neighborhood recreation amenities will be included to provide for the surrounding residential areas. Several options for parking and circulation around the park have been discussed. Pedestrian connections within the park and to nearby trails has been important. Other features discussed to be included at Lions Park are concert -style seating, a water features and space for temporary event structures. 5. PROPOSED PARK DEDICATION: Developers are required to pay park dedication to ensure that the parks system provides for the recreation needs of the additional residents the development brings. The developer may dedicate land or pay a fee. Typically, a combination of fees and land -3- Prairie Village June 9, 2010 dedication is used to meet the requirements. The Parks Commission evaluates each proposed park dedication in conjunction with the formal application process for residential development approval to ensure that is in keeping with the Parks Plan and provides a recommendation to the City Council. The developer is proposing to build 244 units on 14.44 buildable acres. The current fee (which is annually set by the City Council), is $2,400 per unit. The developer could be required to pay $585,600 in park dedication fees in lieu of land. The Park Dedication Policy includes a sliding scale for land dedication. Therefore, a high density development (over 10 units per acre) such as being proposed, 17% of the buildable land shall be dedicated. Therefore, the developer would be required to dedicate 2.45 acres in lieu of paying the fee. The developer is looking to dedicate land in lieu of paying park dedication fees. The concept plan shows an expansion of Lions Park across Finale Avenue and over the northern portion of their property. There is a stormwater pond proposed to take up a majority of the dedicated park land, which is not typically an acceptable option for the substitution of park dedication fees. The developer would like to show how the pond may be used for a recreational purpose. 6. STAFF RECOMMENDATION: Staff recommends direction be given to the developer on the proposed park dedication for the LaValle properties located east of Lions Park. In the future, when the developer formally applies for development approval, a proposed park dedication will be reviewed by the Parks Commission for a formal recommendation. At this time, feedback should be given to the developer including: 1) Expansion of Lions Park to the east 2) Access/ Transportation (Finale Avenue or Fitzgerald Avenue) 3) Connections of trails and sidewalks 4) Proposed pond 7. ATTACHMENTS: 1) Park Dedication Policy & Fee Schedule 2) Downtown Plan 3) Lions Park Preliminary Master Plan 4) Location Map 5) Proposed Site Plan* *Please note that the Architect received the 3 concept plan alternatives presented at the Stakeholder meeting of August 8, 2012 but has not heard the public's input or seen recent changes to the plan. -4- Prairie Village June 9, 2010 I. Sec. 90-324. - Park dedication. (a) General dedication standards. In order to develop a system of parks within the community to serve the public's health and recreational needs, a percentage of the net buildable acreage based on the density of all land subdivided for residential purposes shall be dedicated to the city as public parkland. The city finds that the more dense a development is, the more demand for park land it creates since lots can be smaller affording less private recreational space and more occupants per acre. The following formula will be used to determine the dedication requirement where a land dedication is required: Density Percentage of Land to be Dedicated (of the buildable land) —3.99 units per acre 10 percent 4.00-5.99 units per acre 11 percent 6.00-7.99 units per acre 13 percent 8.00-9.99 units per acre 15 percent 10.00 < units per acre 17 percent The land so dedicated shall be subject to approval by the city council in accordance with the city's Comprehensive Plan for parks. At the city council's discretion, a parkland dedication fee may be accepted or required instead of or connection with land dedication. The parkland dedication fee shall be set annually by the city council and adopted as part of the city's fee schedule. The parkland dedication fee shall be charged for each dwelling unit originated by the subdivision or development of any property in the city, not including any dwelling unit that may be in existence at the time of the adoption of the ordinance from which this article is derived, or which is subject to an approved development agreement with the city that includes a parkland dedication provision. (b) Appeal process. The parkland dedication fee may be appealed to the city council before the city council makes a decision on the final plat and shall be calculated as follows: The percentage of land to be dedicated will be multiplied by the fair market value of the net buildable acreage. The fair market value shall be determined by the city council, following their review of a current appraisal submitted to the city at the developer's expense. The appraisal shall be made by appraisers who are approved members of the SREA or MAI, or equivalent real estate appraisal societies. If the city receives written notice of a dispute over the parkland dedication fee before approval of the final plat, the developer shall pay the fee into an escrow account pending a decision of an appeal of the fee. If an appeal is not filed within 60 days following approval of the final plat, or if the person aggrieved by the fee does not prevail on the appeal, then the funds paid into escrow must be transferred to the city. (Prior Code, § 1215-040.1; Ord. No. 2010-449, § 1, 11-15-2010) N t 4 w. — 1 s r L9 Ll `- L` LjI L -I 1 � ill ri Il - L,J t ._A Y �— Jti i 3 City of Hugo March 15, 2010 a. ` M1 M1 M1 CITY OF HUGO, MINNESOTA J",ANk i' =, PLAN HIGHLIGHTS: • Combined City Hall / Park Entrance and main parking area • Continuous pedestrian -way between City Hall and Park • Additional off street parking • (4) Designated Vehicular Event Access Points • One main parking building • Centralized plaza space • Age separated play features • Highly visible Basketball court and Skate park • Significant amount of open space for flexibility of use • Bay Parking = 45 spaces • City Hall Parking = 25 spaces 0 40' 0' 120' Ga'Pnic.SC,L �V 40BRALIER & ASSOCIATES, LTD. ?Jvlsmn dWSs&Assortiat" In�U(`�', o. G '0� Yema+.enxe 9oulM1 Snnc>n0 PioJrc i-11041)0 nenn�apnbtiiry ssn l6 SgnanLn?Lfi!012 m... n,beng..,m Pi Flimmar i1u�=i Plan Pi mux Bench Seating - typ Temporary Event Fencing - typ. General Skating & Concert Seating • (-150' x 250') Multi -Purpose Park Building • Food Shelf • Lions storage • Kitchen • Restroom. • Picnic shelter • Raised stage ai r Vehicular Event Access Points - typ • Concrete apron & curb cut LL SECTION A -A' if Emb Bay UPPER 146TH Active Neighborhood Recreation • Picnic shelter • Multi-age play equipment • Skate park • Basketball court • Age separation between facilities • Bike racks, Drinking fountain, Trash receptacles Open Lawn Space • 'Carnival' space • Family picnic area 0 t Sculpture / Sign • Raised platform • Planting area 1 47TH =� Connect to Regional Trail System -- Picnic Table - typ. d � 1� N X Water Plaza - • Centralized water feature - • seating areas • Planting areas City Hall Parking e r spaces •Closes Fitzgerald to ihru-traffic • Allows for continuous pedestrian - way connection to park Connect to Regional Trail System -, 3. s�A 1 rfrf" •r�filtiW dun ornamental Fencing - typ. 0 t Sculpture / Sign • Raised platform • Planting area 1 47TH =� Connect to Regional Trail System -- Picnic Table - typ. d � 1� N X Water Plaza - • Centralized water feature - • seating areas • Planting areas City Hall Parking e r spaces •Closes Fitzgerald to ihru-traffic • Allows for continuous pedestrian - way connection to park Connect to Regional Trail System -, 3. Site Map LaValle Properties kX, Ow v^ ZOO- 1 inch = 300 feet lY 7;1 qq kit. --n,6 Ile 1 inch = 300 feet a r SCC( IV •' /' U anV Pleja623ld a o _ YE + 1 � o v `ny c v C u � rn3 L C . a ♦ o \ z L, Y � C GL � c o � o a n mom 61) L v � o ♦ \ z L, Y � C GL � c o � o a n e a 0 � t L a� n c Y mom 61) L m ^ G v z Q ?Lc GL � N I N C � Q o �z e a T� c a U m/ 02, w v n U C� o U � mom 61) 51 L m ^ G c - E o z U.,. ?Lc GL � o �z Oo au 51