HomeMy WebLinkAbout2013.12.11 Parks PacketAgenda
Parks Commission Meeting of December 11, 2013
Hugo City Hall, 7:00pm
1. 7:00pm Approve Minutes From November 13, 2013 Meeting
2. 7:05pm Lavalle Fields Park Dedication
3. 7:30pm 2014 Goals
4. 8:00pm 2014 Capital Improvement Planning
5. 9:00pm Adjournment
Background
Parks Commission Meeti
Hugo City Hall, 7:OOpm
of December 11, 2013
1. 7:OOpm Approve Minutes From November 13, 2013 Meeting
Staff recommends approval of the minutes of the Parks Commission meeting of November 13, 2013.
2. 7:05pm LaValle Fields Park Dedication
An application has been submitted for the Planned Unit Development called "LaValle Fields" which
includes 295 units of senior housing and apartments. The applicant is proposing to meet park dedication
requirements through dedication of 2.11 acres of land adjacent to Lions Park and paying a fee of
$162,840. The entire land dedication will be made with the first phase. Staff recommends that the Parks
Commission make a recommendation to the City Council regarding whether or not the developer has
satisfied park dedication requirements and if the dedication is in keeping with park plans.
Please see the attached memo.
3. 7:30pm 2014 Goals
At the meeting of November 14, 2013, the Park Commission set goals for 2014. Staff recommends
revisions and final approval of the 2014 goals of the Parks, Recreation, and Open Space commission
which will be presented to the City Council at the city-wide goal setting workshop.
Please see the draft of 2014 goals.
4. 8:OOpm 2014 Capital Improvement Plan
A draft of the 2014-2019 Capital Improvement Plan is included in the packet. The Parks Commission has
been given the authority to make recommendations to the City Council about how funding in the Special
Parks Fund may be used. A draft of the Capital Improvement Plan has been put together with the
assistance of the Finance Director, Ron Otkin, and is based on available funds and the projected parks
tax levy. Unfunded projects will be possible only if additional funding becomes available through grants,
private donations, or park dedication. The Parks Commission should discuss the following items:
Dog Park: Funding was planned in previous CIPs for land purchase and improvements for a dog park.
A dog park is not currently on the 2014 Parks Commission goals.
Lions Park: The next phase is to hire a consultant to make changes, as needed, to the Lions Park
Master Plan and move into the design development phase. The consultant that drafted the Master Plan,
outlined that the design development phase would include providing more detailed plans, sketches, and
cost estimates to allow for more informed design decisions. Following the design development phase,
construction documents could be drafted. The City Council has shared an interest in pursuing private
funding for re -development of Lions Park and looking into a Veterans memorial. The cost estimates
provided by the consultant for projects such as the grading and utility work and construction of the shelter
are shown on the CIP.
Irish Avenue Park: The Parks Commission Goals of 2014 include starting the planning of Irish Avenue
Park. It is likely that to start with, master planning guidelines will be put together without the assistance of
a consultant. This is similar to the process used to master planning Lions Park. Following the approval of
master planning guidelines, the Parks Commission could choose to hire a consultant to do concept
planning, followed by design development. It is anticipated that these phases of planning will require
more funding than they did for Lions Park due because of the size of the park.
Elmcrest Avenue: A few options and estimates will be put together for discussion by the Parks
Commission at a future meeting as listed on the 2014 goals.
Trail Improvements: Funding was dedicated in previous CIPs for trail improvements. Trails that are
expected to be built in the next five years will be either paid for by developers or included with street
reconstruction projects and would therefore not require funding from the Special Parks Fund.
Fable Hill Park Improvements: At the meeting of July 10, 2013, the Parks Commission heard a request
from the HOA of Fable Hill for park improvements on Outlot A. The Parks Commission stated that they
would discuss it again during Capital Improvement Planning. In the previous CIP, the improvements were
listed as an unfunded project in 2017. Funding could be dedicated towards the improvements.
Staff recommends that the Parks Commission discuss and make changes to the draft 2014-2019 Capital
Improvement Plan and make a recommendation to the City Council.
Please see the draft of the Parks Capital Improvement Plan.
5. 9:OOpm Adjournment
Minutes
Parks Commission, City of Hugo
November 13, 2013
7:00 P.M.
Council Chambers, City Hall
Call to Order
Present: Rachel Berger, Mat Rauschendorfer, Nicole Schmid, Dave Strub, Jim Taylor, Tom
Windisch
Absent: Joan Benner
Staff Present: Bryan Bear, City Administrator
Scott Anderson, Public Works Director
Shayla Syverson, Parks Planner
Eric Maass, Community Development Intern
Jim Taylor called the meeting to order at 7:09 p.m.
I. Approval of Minutes from October Meeting
Berger made a motion, Strub seconded to approve the minutes of the October 10, 2013 Parks
Commission meeting, with a change.
All Ayes.
Motion carried.
II. Recognition of Hugo Hockey Rink Volunteers
Scott Anderson, Public Works Director introduced Steve Unzen and Doug Vail to the Parks
Commission and updated them on all the work completed by volunteers at the Hugo Elementary
Hockey Rink. Volunteers included Dave Crever, Norm Everson, Jim Kloos, Cliff Lutz, Dan
Tracy, Dan Vail, and Mike Wallace. Additional help was provided by Jon Anderson of White
Bear Lake Area Schools. Through the generous donations of local establishments, the
volunteers constructed an addition to the current warming house for the storage of a tractor that
would be used for maintaining the ice. Partners in the project included Home Depot, Hugo
American Legion, Local Union Council #82, Centennial Hockey, White Bear Hockey Club, Hugo
Business Association, Hugo Lions Club, Hugo Parks Commission, Hugo Rental, Hugo
Chiropractic, DeadBroke Saddle Club, The Blacksmith, Bayport Legion, Northern Signs,
Premier Bank, and Hugo Auto. Construction assistance was provided by Carl Bolander and
Sons, Cemstone, and Ace disposal. Home Depot provided $4,000 for construction materials,
and Subway donated coupons to feed the crew.
Parks Chair, Jim Taylor thanked the volunteers for their hard work and dedication to the Hugo
Community. He also stated that if additional assistance was needed to not hesitate to come to
the Parks Commission for help. Parks Commissioner Tom Windisch described the project as a
shining example of what can be accomplished by just a few people and that it was a great story
of community service and support.
III. Parks Commission Bylaws
Shayla Syverson, Parks Planner provided a presentation on the current Parks Commission
Bylaws and the changes staff recommended by made to the Parks Commission Bylaws. Taylor
stressed the importance of regular attendance if the number of Commissioner on the Parks
Commission was reduced from nine member to seven.
Taylor Made motion, Windisch Seconded.
All Ayes.
Motion carried.
IV. 2013 Annual Report
Shayla Syverson, Parks Planner presented the 2013 Annual Report of the Parks, Recreation,
and Open Space Commission. Accomplishments included new recreation programs including
Teen Movie Night and Nature Camp, expansion of the Tour De Hugo to 180 participants,
consistent attendance at Park Play Days, and expansion of the city's Geocache program.
Overall financial support totaling $4,800 was donated by 25 local businesses which supported
the participation of over 1,300 residents in Hugo recreation programs. In addition to the
volunteer efforts at the Hugo Elementary Hockey Rink, Syverson described the volunteer efforts
put forth by local Elementary teachers throughout town. Park projects included playground
improvements at Frog Hollow Park, Oneka Lake Park, and Diamond Point Park.
VI. 2014 Goal Setting
The Parks Commission discussed goals and action steps for 2014.
VI. Adiournment
Berger made a motion, Windisch seconded to adjourn the meeting at 10:28 pm
Agenda Number: a
CITY OF HUGO
PARKS COMMISSION REPORT
TO: City of Hugo Parks, Recreation and Open Space Commission
FROM: Shayla Syverson, Parks Planner
SUBJECT: LaValle Fields. Request for Preliminary Plat and Planned Unit
Development for a senior housing and apartment complex consisting of
295 units on 29.17 acres west of Finale Avenue.
DATE: December 6, 2013 for the Parks Commission meeting of December 11,
2013
1. DESCRIPTION OF REQUEST:
The applicant is requesting approval of a Preliminary Plat and Planned Unit Development
(PUD) for a senior housing and apartment development. The property totals 39.56 acres
and is comprised of seven parcels. The PUD will be for 29.17 acres of the property, the
remaining will continue to be zoned Central Residential (CR -1). The property includes
wetlands and floodplain for a total buildable acreage of 16.18 acres. The proposed
number of units is 295 for a density of approximately 10 units per acre. Phase 1 is
proposed to include senior housing of 100 units,.with a possible expansion of 30 units.
Phase 2 is proposed to include 165 units of apartments. The proposed development is
located west of Finale Avenue and Lions Park.
2. BACKGROUND:
At the Parks Commission meeting of September 26, 2012, a concept plan for the
development was presented by the applicant. The discussion was continued at the Parks
Commission meeting of October 10, 2013. The developer requested feedback from the
Parks Commission on the proposed land dedication which allowed for the expansion of
Lions Park and the proposed stormwater pond to be located on park property.
The Parks Commission discussed the compatibility of the large community events at
Lions Park and the senior community. An interest in accepting a combination of land and
fee to satisfy the park dedication was shared as well as mixed feelings on expansion of
the park. A stormwater pond was not seen as a benefit to the park. A motion was made
-1-
LaValle Fields
December 11, 2013
and seconded to support the Lions Park Master Plan and share an interest in working with
the developer to make changes to the plan as needed in the future.
3. SITE PLAN:
The applicant is applying for a Planned Unit Development (PUD) to accommodate the
density that is proposed. The majority of the properties to be developed are guided as
Mixed Use (MIX) and a small portion as Medium Density Residential (MD) according to
the 2030 Land Use Plan.
General Layout
The PUD shows a campus with four residential buildings laid out to follow the contours
and perimeter of the property. The buildings on the west of the property are situated to
obtain a vista of the adjacent wetlands. There are several above ground parking lots and
underground parking lots shown within the development. The plan shows two phases
and future expansions.
Road Construction & Access
The PUD shows access off of 146`h Street, Upper 146th Street, and Finale Avenue North
with private driveways. With the first phase, Finale Avenue, from 145th Street to 146`"
Street, will be reconstructed to city standards. The applicant shall relocate Finale Avenue
North with the second phase of the development. Also with the second phase, 147th
Street will be extended to Oneka Parkway. The right-of-way for these roads will be
dedicated to the City at the time of the final plat of the first phase.
Housing Types
The housing will include in phase one, a three story senior housing community with 29
Independent Units, 49 Assisted Living Units, and 22 Memory Care Units. A future
expansion of 30 units is shown. Phase two includes a 3 -story 70 unit apartment building,
3 -story 50 unit apartment building, and a 2 -story 45 unity building.
Drainage Options
The applicant is constructing a stormwater pond on the northeast corner of Oneka
Parkway and 147h Street. Additional stormwater capacity will be included in the pond
which will meet the increased needs anticipated with the re -development of Lions Park.
4. CONSISTENCY WITH PARK PLAN:
Open Spaces/Parks
The neighborhood is served by Lions Park. The park is considered a community park
and includes neighborhood park amenities. Lions Park is guided to continue to serve as a
-2-
LaValle Fields
December 11, 2013
significant central gathering area for the community and host to large events. The
development of community park facilities conveniently located near residential
populations was a major component of the park and recreation vision expressed by the
residents of Hugo at the time the Parks Plan was put together. Additional indoor and
outdoor multi -use recreation facilities are needed in the community. The Parks Plan
supports park development which preserves and utilizes Hugo's natural resources and
open space areas including lakes, wetlands, and woodlands. An expansion of Lions Park
would allow for more event space and construction of additional park features.
Trails
The applicant is proposing construction of a bituminous trail through the development
which would provide a connection between Lions Park and County Road 8. A city trail
will be included with the extension of 147' street as shown in the Parks, Trail, and Open
Space Plan.
5. PARK DEDICATION REQUIREMENTS:
The applicant is required to pay park dedication to ensure that the City's parks system
provides for the recreation needs of the additional residents the development brings. The
Parks Commission evaluates each proposed dedication to ensure that it meets
requirements of the Park Dedication Policy and that it is in keeping with the Parks Plan
and provides a recommendation to the City Council. The applicant is proposing to
dedicate a combination of land and fee.
Required
The applicant is proposing to build 295 units on 16.18 buildable acres. The Park
Dedication Policy includes a sliding scale for land dedication. With a high density
development (over 10 units per acre) such as being proposed, 17% of the buildable land
shall be dedicated. Therefore, the developer would be required to dedicate 2.75 acres in
lieu of paying the fee.
The current fee (which is annually set by the City Council), is $2,400 per unit. Therefore,
the developer would be required to pay $708,000 in park dedication fees in lieu of land.
Proposed
The applicant is proposing to dedicate 2.11 acres of land. Part of the existing right-of-
way for Finale Avenue North is included in the land dedication. The applicant will be re-
constructing Finale Avenue North in a new right-of-way to follow a re -alignment that is
suitable for the development. The land dedication includes .35 acres of the existing right -
of way that will become part of Lions Park, after the road is removed.
The 2.11 acres that are proposed to be dedicated satisfies 76% of the total park dedication
requirement. The remaining 23% will be fulfilled by payment of a fee. The fee per unit
-3-
LaValle Fields
December 11, 2013
for the proposed development would be $552 per unit, which is 23% of the current fee of
$2,400 per unit. With the proposed 295 unit development the total fee would be
$162,840.
In summary, the applicant is proposing the following be dedicated for the entire planned
unit development:
• 2.11 acres of land (located adjacent to Lions Park)
And $162,840 in cash -in -lieu of land
Since the development of LaValle Fields will occur in phases, the park dedication will
occur at the time of final plat for each phase. The applicant is proposing to dedicate none
of the fee and the entire land dedication with the first phase.
6. STAFF RECOMMENDATION:
Staff recommends that the Parks Commission consider the proposed dedication of 2.11
acres of land and $162,840 in fees for the LaValle Fields Planned Unit Development and
make a recommendation to the City Council.
ATTACHMENTS:
1. Park Dedication Policy & Fee Schedule
2. Lions Park Master Plan
3. Site Plan
-4-
LaValle Fields
December 11, 2013
Sec. 90-324. - Park dedication.
(a) General dedication standards. In order to develop a system of parks within the community to serve
the public's health and recreational needs, a percentage of the net buildable acreage based on the
density of all land subdivided for residential purposes shall be dedicated to the city as public
parkland. The city finds that the more dense a development is, the more demand for park land it
creates since lots can be smaller affording less private recreational space and more occupants per
acre. The following formula will be used to determine the dedication requirement where a land
dedication is required:
Density
Percentage of Land to be Dedicated (of the buildable land)
0-3.99 units per acre
10 percent
4.00-5.99 units per acre
11 percent
6.00-7.99 units per acre
13 percent
8.00-9.99 units per acre
15 percent
10.00 < units per acre
17 percent
The land so dedicated shall be subject to approval by the city council in accordance with the city's
Comprehensive Plan for parks. At the city council's discretion, a parkland dedication fee may be accepted
or required instead of or connection with land dedication. The parkland dedication fee shall be set annually
by the city council and adopted as part of the city's fee schedule. The parkland dedication fee shall be
charged for each dwelling unit originated by the subdivision or development of any property in the city, not
including any dwelling unit that may be in existence at the time of the adoption of the ordinance from which
this article is derived, or which is subject to an approved development agreement with the city that includes
a parkland dedication provision.
(b) Appeal process. The parkland dedication fee may be appealed to the city council before the city
council makes a decision on the final plat and shall be calculated as follows: The percentage of land
to be dedicated will be multiplied by the fair market value of the net buildable acreage.
The fair market value shall be determined by the city council, following their review of a current
appraisal submitted to the city at the developer's expense. The appraisal shall be made by appraisers who
are approved members of the SREA or MAI, or equivalent real estate appraisal societies.
If the city receives written notice of a dispute over the parkland dedication fee before approval of the
final plat, the developer shall pay the fee into an escrow account pending a decision of an appeal of the
fee. If an appeal is not filed within 60 days following approval of the final plat, or if the person aggrieved by
the fee does not prevail on the appeal, then the funds paid into escrow must be transferred to the city.
(Prior Code, § 1215-040.1; Ord. No. 2010-449, § 1, 11-15-2010)
;
o
22:lz�,
)2c _C)\\({
i
±:{a=ƒ2£2§
({=)2\(\{\
\
!\§
2{k{\\/{(\`J®):!)
<}!
\\
%Azl: ±a:f\))(#\\
l
u
E. . „
....
. .. .�
�
q4
avRAa[�D
awwra
I%
JYJ
h
4
I
J O
IV
\
\
r
p
AREA TAWLA71ON
PAR1aNa CALCULATIONS
UNIT TYPE
REQUIRED PROVIDED
APARTMENTS:
363 (2 PER UNIT + 1 PER 5) 365
SENIOR HOUSING:
64 92
ASSISTED UMNG`26
1/2 PERUNIT)
MEMORY CARE
(INDEPENDENF.
10 1 PER S UNITS +6)
29 1 PER UNIT) l
p
AREA TAWLA71ON
RESIDENTIAL USE
ASSISTED LIVING
0.51 ACRES
MEMORY CARE
0.25 ACRES
INDEPENDENT LIVING
0.30 ACRES
APARTMENTS
2.DO ACRES
(FUTURE)
COMMON OPEN SPACE
19.95 ACRES
(INLCUDES WETLANDS)
PARK
1.76 ACRES
STREETS
1.67 ACRES
OFF—STREET PARKING
2,73 ACRES
k LOADING AREAS
COMMERCIAL USE
0
OFFICE USE
0
INDUSTRIAL USE
0
1OTK AKA
20.17 A11=1111FINALE
VE. VACA
ATE (PARK)
0.35 ACRES
TOTAL SITE AREA INCLUDING
FINALE AVE. VACATE (PARK)
29.32 ACRES
0
PARK
J I rn 0.35
0
PFl .W.
OOTOBER
0
J
W
ILQ 2
\R
Wa
F
N
I PREPARED FOR: I
PA ENTGH
INVEST I -Lo P,
LLC
0nT4
P-ANNIN0
s ENGINEWNO
PLOWE
ane uHE ORME
6 tm
LINOD LAKE6, MN 65611
PWNE:(651)W8 Qlo
PPX: M51)wl1 m1
NORTH
6�
1INCH eW FEET
SITE PLAN
LAVALLE FIELDS P.U.D. 101,1
N
i6
0
qITTom
N
3e
b
O
b
N
�y
N
N
Y
5 �
`�°
F
VO
CO
A lam+
h
a'i G
m ti
-co
o p,
w
F
o
�
Vr
°� V]
G
O
a Ito
O
r18
°ger
ac°'i
�
°'�t"�
'Q'
.,
o
�
a'd �
,� .� o
V /o
0 cz �
p,
F � vi
a o O
:�'a •�.�
m eooq
P. O
uai
P -I
CL
cz
C.
N N
F
O�cawF
iii ..�. N
o�
ttl
w"ww
xx�
Y �PEI
3e
L(O
CITY OF HUGO
PARKS CAPITAL IMPROVEMENT PLAN
Updated December 13, 2013
PROJECTS
UNFUNDED
PROJECTS
YEAR
COST
PRIORITY
Lions Park design development
and cost estimates
2014
$20,000
Dog Park property
2014
$50,000
purchase
Elmcrest Avenue Trail
2015
TBD
Irish Avenue Park concept
2015
$40,000
planning
Dog Park construction
2015
$20,000
Lions Park shelter
design and construction
2015
$75,000
documents
Irish Avenue Park design
development and cost estimates
2016
$30,000
Lions Park grading &
2016
$500,000
utilities
Lions Park parking lots
2016
$500,000
& trails
Fable Hill Park Improvements
2017
$70,000
Lions Park shelter
2017
$1,000,000
Lions Park memorial
2018
$200,000
Lions Park landscaping,
2018
$215,000
turf & fencing
Lions Park play
2018
$250,000
equipment
* Unfunded projects will be possible only if funding becomes available such as through grants,
private donations, or park dedication.
CITY OF HUGO
PARKS CAPITAL IMPROVEMENT PLAN
Updated February 8, 2012
PROJECT
WISH LIST*
YEAR
COST
PRIORITY
Trail System Improvements
2012
$10,000
Heritage Ponds Landscaping
2012
$10,000
Arbre Park Tree Planting
2012
$5,000
Park Rules Signs
2012
$3,000
Skating Rink Boards
2012
$2,000
Irish Ave. Park
Interim Improvements
2013
$20,000
Trail System Improvements
2013
$10,000
Lions Park
2014
$20,000
Site Planning
Trail System Improvements
2014
$10,000
Irrigation of Fields at
2014
$15,000
Beaver Ponds
Lions Park Shelter
2014
$1,000,000
Trail System Improvements
2015
$10,000
Lions Park Refrigerated
2015
$40,000
Ice Skating Rink
Trail System Improvements
2016
$10,000
Lions Park Playground
2016
$100,000
and Landscaping
Trail System Improvements
2017
$10,000
Irish Ave Park
2017
$20,000
Master Site Plan
Fable Hill Park
2017
$20,000
Development
* Projects listed on the wishlist will be possible only if funding becomes available such as
through grants or park dedication requirements.
RECREATION
PROGRAMS
SNOW JAM
Saturday, January 11
2:00-4:00 pm
Oneka Elementary School
The Oneka gym will be rocking with a DJ playing family
F
avorites, as well as a rock wall challenge course, toddler
ay land, giant slide and jump castle. Enjoy family fun out
the cold and snow! Parent/guardian supervision is
required. This event is for ages 1-10. The cost is $5 with pre
-registration or $8 at the door.
MOVIE NIGHTS AT ONEKA
Friday, January 10
Friday, February 21
Friday, March 21
Save the date for the 2014 Movie
Nights in the gymnasium at Oneka
Elementary School (4888 Heritage
Parkway North). Please look for future
advertisements for the movie titles. You
do not need to be a part of the White
Bear Lake School District to participate in
this free event. Invite your friends and
family! Feel free to bring pillows and
blankets to sit on. Doors will open at 6:30pm
and the movie will start at 7:00pm. Popcorn
and snacks are provided. Parent/guardian
supervision is required.
For more information
about parks and
recreation in Hugo:
Follow "City of Hugo, MN"
onfacebook
Go to www,cLhugo,mnxs
Call 651-762-6342
Visit City Hall at 14669
Fitzgerald Avenue North
SLEDDING PARTY
Saturday, February 1
2:00-4:00 pm
Oak Shore Park
TOT/FAMILY TIME
The City of Hugo has partnered with White
Bear Lake Area Schools to make the gym-
nasium at Oneka Elementary available for
resident use. The programs run from
November 3 to March 30, with a few
exceptions for school breaks and other
skip days. The cost is $2 per child with a
maximum fee of $5 per family. Photo
identification required. Friends and family
may also participate when accompanied
by a student or resident.
Tot Time
Ages 0-6 with a parent or guardian
Tuesdays 4:00-7:30 pm
Thursdays 4:30-7:30 pm
Sundays 1:00-5:00 pm
Family Fun Time
Ages 7-12 with parent or guardian
Tuesdays & Thursdays 6:00-7:30 pm
Sundays 1:00-5:00 pm
For more information, go to the City of
Hugo's website or call WBLAS Community
Services at 651-407-7501.
The sixth annual Sledding Party will be hosted by
the Hugo Parks, Recreation and Open Space
Commission on Saturday, February 1 from 2:00-
4:00 pm at Oak Shore Park. Take turns zooming
down the sledding hill and then warm up by the
bonfire with hot chocolate and cookies! This is a
free event. The park is located at 12790 Exhall
Avenue North. There are parking lots at the north
and south ends of the park, off of Exhall Avenue.
B,1.