HomeMy WebLinkAbout2014.12.10 Parks PacketAgenda
Parks Commission Meeting of December 10, 2014
Hugo City Hall, 7:00 pm
7:00 pm
1. Approve Minutes from November 12, 2014 Meeting
7:05 pm
2. Presentation of the Lions Park Concept Plans
8:00 pm
3. Victor Square Park Request
8:20 pm
4. 2015 Goals
8:40 pm
5. Winter Programs
9:00 pm
7. Adjournment
Background
Parks Commission Meeting of December 10, 2014
Hugo City Hall, 7:00 pm
7:00 pm Approve Minutes from November 12, 2014 Meeting,
Staff recommends approval of the minutes of the Parks Commission meeting of November 12,
2014.
Please see the attached minutes.
7:05 pm Presentation of the Lions Park Concept Plans
Candace Amberg, Senior Landscape Architect with WSB and Associates will present three
concept plans drafted for Lions Park. The plans were drafted to show several different options
and locations for the features. Different combinations are possible. Amberg will lead a
discussion and gather input on the main park building, combination and location of recreation
amenities, a memorial, vehicular circulation, parking, and pedestrian circulation.
The concept plan drafts are attached. Renderings will be provided at the meeting with
additional graphics and labels.
8:00 pm Victor Square Park Request
A letter was received from Karen Ray, representing the Victor Gardens Master Association.
The letter requests that ice skating be prohibited on the pond in Victor Square Park. Victor
Square Park has a unique partnership- it is owned by the City of Hugo and open to the public.
The landscaping exceeds city park standard, therefore the Association is responsible for the
additional maintenance. Restricting public access and use would require Parks Commission
and City Council approval. Staff recommends discussion and a recommendation be made to
the City Council.
Please see the letter submitted by Karen Ray. Aerial and other photos have been attached
for your reference.
8:20 pm 2015 Goals
At the meeting of November 12, 2014; the Parks Commission drafted goals and action steps for
2015. Highlights include Lions Park Planning, review of the Parks, Trails, and Open Space
plan, trails, and senior recreation. Staff recommends approval of the 2015 Goals of the Parks,
Recreation, and Open Space Commission.
Please review the draft 2015 goals, which are attached.
8:40 pm Winter ProBrarie_.
Dates have been set for the 2015 winter programs including the movie nights and sledding
party. Staff recommends that the Parks Commission also discuss the Snow Jam and possible
alternatives.
Movie Night: Friday nights at 7:OOpm at Oneka Elementary- January 16, February 20, March 27
Sledding Party: Saturday, February 7 from 2-4pm at Oak Shore Park
Kidz `N Biz: Saturday, April 25
Please see the attached memo on the Snow Jam.
9:00 pm Adjournment
MMCD Report attached for your reference.
Minutes
Parks Commission, City of Hugo
November 12, 2014
7:00 P.M.
Council Chambers, City Hall
Call to Order
Present: Rachel Berger, Mat Rauschendorfer, Nicole Schmid, Ranell Tennyson, Tom Windisch
Absent: Joan Benner, Dave Strub
Staff Present: Bryan Bear, City Administrator
Scott Anderson, Public Works Director
Shayla Syverson, Parks Planner
Debi Close, Parks Secretary
Tom Windisch called the meeting to order at 7:06 pm.
I. Aaproval of Minutes from October Meeti
Tennyson made a motion, Schmid seconded to approve the minutes of the October 8, 2014
Parks Commission meeting.
All Aye. Motion Carried.
II. Lions Park Planning Update
Shayla Syverson, Parks Planner updated on the October 14, 2014 Lions Park Stakeholders
meeting. They identified development goals and outlined a tentative project schedule.
At the next meeting, Candace Amberg, Project Manager at WSB Engineering will provide two
conceptual design for discussion.
III. 2014 Annual Report
Shayla Syverson, Parks Planner presented the City of Hugo Parks, Recreation and Open Space
Commission Annual Report for 2014. The report included: Recreation Policy, Trail Policy,
Hardwood Creek Trail extension.
IV. 2015 Goal Setting
City Administrator Bryan Bear provided an update on the City of Hugo and was available for
questions while Parks Commission Members set goals for 2015.
Parks Planner Shayla Syverson reviewed the 2014 goals.
Discussion on goals included:
Prioritizing Lions Park Planning and waiting to plan Irish Avenue Park.
Continue trail connections and planning
Evaluate recreation needs for seniors
City Staff was directed to draft a 2015 goal from this discussion to be finalized at the next Parks
Commission meeting.
V. CIP and Budget Update
Shayla Syverson, Parks Planner reviewed the current Parks Capital Improvement Plan and
summarized the special park fund, which included funded and unfunded projects. Unfunded
projects are only possible if funding becomes available through grants, private donations or park
dedication.
Discussion included: Special Park Fund, Lions Park costs, CIP, the parks levy, and resident
requests.
Windisch made a motion, Tennyson seconded to approve the Parks Capital Improvement Plan.
Aye: Nicole Schmid, Ranell Tennyson, Tom Windisch
Nay: Rachel Berger, Matt Rauschendorfer
Motion Carried.
VI. Forest Lake YMCA
Shayla Syverson, Parks Planner updated on the agreement between the City of Forest Lake
and the YMCA for a new facility projected to cost $13,250,000. The City of Hugo has been
asked to participate and provide financial support. In return each household would receive 6
free passes yearly and a waived membership fee.
Parks Commission members would like to consider this offer and hear more information.
VII. Other
Berger reminded of the Holiday Party December 11th, 2014
VIII. Adjournment
Schmid made a motion, Tennyson seconded to adjourn the meeting at 10:02 pm.
All Aye. Motion Carried
I R
0 30 (00'
Scale- I— M,
p
SHEET
L2.0
p
0 50, ia'"en jjmm� SHEET
Scale- I— io' L2.0
--
/
/
I /
/
/
\� \ I ' ,
-L--
L------------------------------
---------------------------
_ ___-_-______ _ _ _
_ — — — — —
------------------
n
1 �I
y
0
Ll
e
p
JERPM
0 30' (00'
Scale= 1"= 50'
SHEET
L2.0
z`
Bryan Bear
From:
Karen Ray <karenray@visi.com>
Sent:
Monday, November 03, 2014 3:20 PM
To:
Becky Petryk; Bryan Bear
Cc:
Janice Porter; Josh Berger; Mark Viker; Shannon Costello; Timothy Scanlan; Jennifer
Campbell; June Fulton
Subject:
Ice skating at Victor Gardens
October 14, 2014
Becky Petryk, City Council, City of Hugo Bryan Bear, City Administrator
Dear Ms. Petryk,
Thank you for meeting with representatives of the Victor Gardens Master Association on August 12. During that
meeting we discussed ice skating on the Victor Square garden fountain. The Board met on October 8 and passed a
motion requesting that the City of Hugo prohibit skating in that one particular location.
There are skating rinks in Hugo and in Centerville at LaMotte Park. These are ice rinks and ice sheets officially designated
for skating. Both of these rinks are close to Victor Gardens, so residents in our neighborhood - and in Hugo - can safely
skate in a nearby location.
The fountain was not built for sports. The surface of the fountain is between four and ten feet below the sidewalk. A
skater must climb down the landscaping rocks to get to the ice. In the winter the landscaping rocks are full of ice and
snow, and are not engineered for people to climb on them. The area of the Square where the fountain is located is not
lit; when it gets dark enough that skaters must leave the ice, they climb up the snowy rocks in the dark. There is great
potential for personal injury.
Damage has already occurred because of skating. Some of the plantings were damaged and had to be replaced. Pavers
are missing in the area where skaters have climbed in and out of the fountain, and some board members attribute this
damage to skaters.
There is no way of determining how thick the ice is on the fountain. Just below the water line there are floodlights (not
operational in the winter), electric conduits, plumbing and tubs for fountain plants. Skaters could be damaging this
infrastructure with shovels, play equipment and the blades of the skates.
Victor Square is a joint project between the City and Victor Gardens. We are doing our part by maintaining the fountains
and the planting. This year alone the Master Association has spent thousands of dollars trimming plants, adding mulch
and other maintenance activities. Check out the Square, it looks beautiful! We ask that the City do its part to help us
avoid unnecessary expensive repairs and personal injury by prohibiting skating in the fountain itself.
Thank you,
Victor Gardens, Master Association
submitted by Karen Ray, Board member
Victor Square Park
N
A
it-HUGO
December 5, 2014
Map Powered by DataLink
from WSB &Associates
1 inch = 94 feet
�1
eer--�,.:?a�
44
AL
lk
r y"
Al,_6. _
J
i y�ry1gy'
2015 Goals
Parks, Recreation and Open Space Commission
Approved by the Parks Commission at their December 10, 2014 meeting
• Evaluate trail at 147th Street/ Geneva Avenue with future street
reconstruction
• Identify and prioritize trails that would not be built with development or
road project or other normal means
-Support Hardwood Creek Regional Trail extension and improvements
• Develop a timeline for Irish Avenue Park planning
• Finalize master plan
-Plan phasing of development
-Evaluate funding needs
-Review the Park Dedication Policy
-Begin review of and update the Parks, Trails and Open Space Plan (part
of Comprehensive Plan updates)
-Respond to resident feedback
-Evaluate the recreation needs of seniors
• Strengthen partnerships
2015 Program Update: Snow Jam
TO: City of Hugo Parks, Recreation and Open Space Commission
FROM: Shayla Syverson, Parks Planner
DATE: December 5, 2014 for the meeting of December 10, 2014
1 INTRODUCTION
The Snow Jam has not been successful in recent years. It was started in 2010, but has not grown in
popularity like other recreation programs. Currently, there is not sufficient volunteer support. In 2014,
the program had a loss of over $1,800. Registration and participation has been lacking.
Staff is looking for input and ideas on a more successful program.
2 2014 SNOW .IAM BUDGET
Food and Supplies $250
Custodial/Building Costs $260
Inflatables $1,400
DJ $450 Sponsorships $450
Advertising 250 Registrations 343
EXPENSES $2,610 REVENUE $793 =-$1,817
3 ISSUES
• Participants are typically 4-7 years old. The advertised age is 1-10, but older kids and young
toddlers to not typically attend. It is possible that the program does not appeal to a wide
enough age group.
• In 2014, there were 70 kids with 14 of them being free due to relationship with a volunteer.
In 2013 there were 57 paying kids. In 2012, there were 102 kids. In 2011, there were 81 kids.
Attendance did not increase with additional paid advertising or via word-of-mouth.
• Volunteer support has not been sufficient. Ten volunteers are needed to run the event. Apple
Academy provided volunteers in 2012, 2013, and 2014. Participation is inconsistent. Creative
Kids Academy provided volunteers in 2011. In 2010, four teenagers operated the inflatables.
Building Supervisors have been hired to fulfill the need in the past.
• Sponsors are consistent but not involved.
• The only profitable year was 2012.
• Saturday mornings may not be suitable for some families.
• Snow Jam could possibly conflict with other events. The PTA Winter Carnival is held in February,
which is similar.
Snow Jam December 10, 2014 1
4 OPTIONS
Make changes to the Snow Jam.
• Reinvent or re -brand the program
• Try a new setting or time of year. For example, having something at Hugo Elementary in the fall
• Try a new child care center or other source for volunteers
Do nothing, keep the Snow Jam going as is.
Discontinue the Snow Jam and replace it with a similar program. Possible options include:
• Host an active event for 4-7 year olds at Hugo Elementary during the school year
• Have DJ Kidsdance at an event in a park
• Partner with other active family programs at the school through BearPower, etc.
• Rent inflatables and make available at a park for a day
• Host event with equipment for older kids: rock wall, trampoline, carnival games, etc.
• Ask loyal sponsors to support other programs
Snow Jam December 10, 2014 2
METROPOLITAN MOSQUITO CONTROL DISTRICT
Metro Counties Government Center
2099 University Avenue West
Saint Paul, MN 55104-3431
Bryan Bear
Hugo City Administrator
14669 Fitzgerald Avenue North
Hugo, MN 55038
Dear Mr. Bear:
Website: www.mmcd.org
Phone: 651-645-9149
FAX: 651-645-3246
TTY use Minnesota Relay Service
November 7, 2014
Enclosed is a summary of work done by the Metropolitan Mosquito Control District (MMCD) in the
city of Hugo during the 2014 mosquito control season.
2014 was another interesting year when it came to mosquito production. Precipitation was above
average with frequent rain from April through early July. Large parts of the District received 11-12
inches of rain in June. Precipitation decreased to more typical levels by mid July. In contrast to
previous seasons when drought conditions prevailed, rainfall throughout the rest of the 2014
season fell at historically normal levels. This resulted in high levels of mosquito production. We
treated the majority of our overall 314,600 acres between late April and early September.
In 2014 the Minnesota Department of Health reported 14 human West Nile virus (WNV) illnesses;
six of those cases were reported in people who lived within our District. In addition, two La Crosse
encephalitis cases were reported in residents of the state; investigations into where these cases
were exposed is ongoing, however, MMCD employees continued to monitor and control
populations of mosquitoes capable of transmitting disease right up until we received our first frost
this fall.
MMCD employees also controlled immature black flies in small steams and large rivers throughout
the metropolitan area. These treatments have resulted in significantly fewer adult black flies when
compared to a time before we conducted treatments. MMCD staff also continued to monitor the
distribution of ticks capable of transmitting disease, and worked with the Minnesota Department of
Health to provide information designed to reduce the risk of tick transmitted diseases.
If you have any questions, or would like to meet to discuss our agency's activities within Hugo,
please contact me.
Sinc I
A. Manweiler. Executive Director
Phone: (651) 643-8365
Email: mmcd_sam@mmcd.org
Metropolitan Mosquito Control District
2014 Activity Summary — Hugo
Service Summary
Larval Mosquito Treatments = 5,240 acres
Adult Mosquito Treatments = 2,205 acres
Customer Calls = 32
Catch Basins Treated = 31085
Tires Removed = 5
Special Events
MN High School Rodeo
MN Special Olympics
Good Neighbor Days
Park/Rec Areas Regularly Treated
Hugo Ball Fields
Clearwater Creek Park