HomeMy WebLinkAbout2014.11.12 Parks PacketAgenda
Parks Commission Meeting of November 12, 2014
Hugo City Hall, 7:00 pm
7:00 pm
1. Approve Minutes from October 8, 2014 Meeting
7:05 pm
2. Lions Park Planning Update
7:20 pm
3. 2014 Annual Report
7:30 pm
4. 2015 Goal Setting
8:40 pm
5. CIP and Budget Update
8:50 pm
6. Forest Lake YMCA
9:00 pm
7. Adjournment
Background
Parks Commission Meeting of November 12, 2014
Hugo City Hall, 7:00 pm
7:00 pm Approve Minutes from March October 8, 2014 Meeting
Staff recommends approval of the minutes of the Parks Commission meeting of October 8,
2014.
The minutes are attached.
7:05 pm Lions Park Planning Update
A stakeholder meeting was held on October 14, 2014. The stakeholders reviewed the previous
concept plan which was not approved and does not include the recent land dedication. The
stakeholders also looked at the existing park conditions, identified park development goals, and
outlined a tentative project schedule.
Please see the attached stakeholder meeting minutes.
7:20 pm 2014 Annual Report
Shayla Syverson, Parks Planner, will present the City of Hugo Parks, Recreation, and Open
Space Commission Annual Report for 2014.
7:30 pm 2015 Goal Setting
Bryan Bear, City Administrator, will provide an update on the City of Hugo and lead the Parks
Commission in setting goals.
Attachments include the 2014 Goals. Please reference the Parks Plan in your binder, if needed.
8:40 pm CIP and Budget Update
A draft of the 2015-2020 Capital Improvement Plan has been put together with the assistance of
Finance Director, Ron Otkin. It is based on the Special Parks Fund, the projected parks tax levy
and the previous CIP set by the Parks Commission. The Parks Commission has been given the
authority to make recommendations to the City Council about what the Special Parks Fund shall
be used for. The CIP prioritizes improvements that the Parks Commission would like to make.
Improvements identified as "unfunded" may be possible if additional funding becomes available
through grants, private donations, or park dedication fees.
Park dedication increased in 2014 due to increased residential construction. The Parks
Commissions reviews park dedication proposals when a developer requests preliminary plat
approval. The land or fee dedication is not received until the developer records the final plat
with Washington County. The timeline is set by the developer. There were also a couple rural
minor -subdivision which require payment of the park dedication fee.
On June 9, 2010, the Parks Commission approved a proposal for Prairie Village that included
dedication of .67 acres of land adjacent to Oneka Elementary School as well as paying a fee per
lot at the time of final plat. In 2014, Prairie Village 3rd Addition received final plat approval and
$62,592 was received. There are 30 lots in Prairie Village that have yet to have final plat
approval and at that time the remaining $58,680 will be dedicated.
On February 26, 2014, the Parks Commission approved a proposal for Fox Meadows that
included a proposal to pay fees to satisfy park dedication. With 57 lots and a fee of $2,400 per
lot, a total of $136,800 would be paid. The 1 st Addition included 34 lots and $81,600 was paid in
2014. The remaining $55,200 will be paid with future final plat approvals.
On December 11, 2013, the Parks Commission approved a proposal for Lavalle Fields that
included dedication of 2.11 acres of land and paying the remaining 23% in fees. On September
25, 2014, the land dedication was received with the 1St Addition (Keystone Senior Housing).
Future additions will include apartments which will pay 23% of the fee which would be $162,840.
In summary, in 2014, the Parks Commission received $144,192 in park dedication fees as of
September 30, 2014. Future park dedication may be up to $276,720 which would be made
when the developer decides to move forward.
DRAFT 2015-2020 CIP attached.
8:50 pm Forest Lake YMCA Update
The City of Forest Lake has signed a development agreement with the YMCA (Young Men's
Christian Association) for a 50,000 square foot facility that would include a fitness center, pools,
indoor playground, exercise studios, walking paths. It is projected to cost $13,250,000. The
City of Forest Lake donated the land for the YMCA at the Headwaters site (near the library).
The City of Forest Lake has agreed to pay $9,000,000 and the project is not contingent on
additional support. The City of Hugo has been asked to participate. The City of Hugo declined
participation in the White Bear Lake YMCA renovations, which were complete in 2010. The City
Council had discussion at their November 3, 2014 meeting and asked that an update be given
to the Parks Commission. Staff is asking for input on how the Parks Commission would like to
discuss this in the future.
Please see the attached news article.
9:00 pm Adjournment
Minutes
Parks Commission, City of Hugo
October 8, 2014
7:00 P.M.
Council Chambers, City Hall
Call to Order
Present: Joan Benner, Rachel Berger, Mat Rauschendorfer, Nicole Schmid, Dave Strub,
Ranelle Tennyson, Tom Windisch
Staff Present: Shayla Syverson, Parks Planner
Debi Close, Parks Secretary
Tom Windisch called the meeting to order at 7:03 pm.
Tom Windisch requested adding Hardwood Creek Trail update to the agenda.
All Agreed.
I. Approval of Minutes from August Meeting
Berger made a motion, Strub seconded to approve the minutes of the August 13, 2014 Parks
Commission meeting.
Rauschendorfer and Schmid abstained.
Benner, Berger, Strub, Tennyson and Windisch. Aye. Motion Carried.
Froa Hollow Memorial Proaosal
Shayla Syverson, Parks Planner was contacted by Ms. Case's 5t" Grade Oneka Elementary
class. The class wishes to dedicate a plaque and tree in Frog Hollow Park in memory of Allen
Bower, father of one of her students. Bower named "Frog Hollow" in the park naming contest.
Schmid made a motion, Tennyson seconded to approve the memorial donation plaque/tree to
be place at Frog Hollow Park in remembrance of Allen Bower.
All Aye. Motion Carried.
III. Update on Lions Park Planning
Shayla Syverson, Parks Planner updated on the Lions Park Planning. The City acquired the
2.11 acres that were to be dedicated with the Lavalle Fields development. The first
stakeholders meeting will be held Tuesday, October 14. The concept plans will be revised and
a public meeting will be scheduled for community feedback.
IV. SHIP Active Living Grant Awarded
Shayla Syverson, Parks Planner informed of the Active Living Partner Project through the
Statewide Health Improvement Program. A grant of $4,999 was awarded which will be matched
by Oneka Elementary and used purchase lit signage. The signage will enhances pedestrian
safety in the school speed zone area and assist in increasing the number of students who walk
or bike to school.
V. BearPower
Rachel Berger requested to have a follow up discussion from the June 11, 2014 meeting
presented by Alli Zomer, Project Manager at Health Partners/Ch ildren's Hospitals and Clinics
MN about their program BearPower. The City of Hugo has become a community partner. The
recreation program policy includes language to support healthy and active families through city
programs.
VI. Portable Restroom Screening
Shayla Syverson, Parks Planner was addressed by a resident with request for additional
screening of the portable restrooms their neighborhood park. Staff recommended the
Commission consider making it standard practice throughout all neighborhood parks or to do
nothing.
All Commission members agreed that Public Works shall add additional screening as the parks
maintenance schedule and budget allows.
VII. Update on Recreation Programs
Shayla Syverson, Parks Planner updated on the recreation programs.
Tour de Hugo was held September 13, 2014 with 165 riders.
The movie Frozen was shown on September 19th. There was a record setting turnout but rain
dampened the event.
The September 27, 2014 Story Walk had 60 participants.
Upcoming events: Superhero Training Camp November 14, 2014 and Tot Time
Parks Commission members directed staff to look into non -school days for use of the gym. If
extended day program is held then maintenance cost would already be absorbed giving
opportunity to run programs.
VIII. Hardwood Creek Update
Shayla Syverson, Parks Planner updated on Washington County Trail improvement being done
to Hardwood Creek. Construction of the trail extension between 1401h Street and 145th Street
has started. Grading work has been completed for the 10 foot wide trail which includes a paved
surface as well as a grass surface to accommodate snowmobile and equestrian uses.
Following construction of the extension, the existing trail will be resurfaced.
VIIII. Adjournment
Berger made a motion, Benner seconded to adjourn the meeting at 8:13 pm.
All Aye.
A
WSB
& Associales. Inc. engineering -planning - environmental - construction
Lions Park Master Plan Update Project
Date: October 17, 2014
Re: Project Start-Up/Programming Meeting
WSB Project No. 1904-640
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
Meeting Notes:
The following are notes taken from the project start-up/programming meeting held in Hugo on
October 14, 2014. Please report any errors, omissions and/or discrepancies promptly for
correction.
Attendance:
• Shayla Syverson — Parks Planner, City of Hugo
• Scott Anderson — Public Works Director, City of Hugo
• Tom Windisch — Hugo Parks, Recreation and Open Space Commission Chair
• David Strub — Parks Recreation and Open Space Commission
• Becky Petryk — Hugo City Council
• Denny Route — Lions Club
• Michael Gallivan — Lions Club and Economic Development Authority
• Candace Amberg — Project Manager, WSB
• Jeff Deitner — Landscape Architect, WSB
Existing Park Conditions:
1. Good Neighbor Days:
a. Approx. +/-10,000 visitors — annual event that runs Thursday thru Sunday.
b. Carnival requires the north half of the park for the Midway and trailers with the
south-eastern and north-western areas used for the parking, the band area on the
tennis courts, a fenced in beer garden, and a petting zoo.
c. Parking also along side streets and sometimes park at the bank and shuttle over.
d. Plans to have parade come in from Waters Edge and finish at the park.
2. Playground:
a. Older playground mainly focused on younger age group.
b. Site of first playground in Hugo.
St. Cloud • Minneapolis • St. Paul
Equal Opportunity Employer
wsbeng.com
Page 2
3. Building/Shed:
a. Public Works garage now used as a storage area by the Lions Club and location
for food shelf.
4. Skate Park:
a. Equipment moveable and highly used by the youth in the community.
5. Tennis Court:
a. Not used as often as other parks.
b. Could do without it if space is limited.
6. Ball Fields:
a. Two fields currently used for T -ball games.
b. Ballfield can be a draw for some residents/businesses and is good for the kids in
the neighborhood.
Main Park Redevelopment Goals:
1. Community Draw:
a. Want to create a social center that has a continuous draw year round and works to
enhance the downtown commercial district.
b. Would like to encourage surrounding businesses that would serve to cater to users
of the park, such as a coffee shop, places to eat, etc.
c. Make sure activities encompass multi -generational use (senior development going
in across from park) and both active & passive uses.
2. Vehicular Access, Circulation and Parking:
a. Maintain at least two entrance points to the parking facilities for the park they
don't necessarily have to be connected.
b. Look into traffic calming designs.
c. Possibly separate parking areas from drive lanes / thru traffic near City Hall.
d. Need adequate and accessible parking for senior citizens and people with
disabilities in close relation to use areas and city hall (many community meetings
take place here).
e. Parallel parking not conducive for direction of the primary traffic patterns.
f. Ensure routes allow for truck deliveries for events
3. Pedestrian Access & Circulation:
a. Safe access from senior housing development to the west.
b. Organic pathways creating view corridors of site features.
c. Seating along pathways and throughout the park.
d. Regional trail access from all four corners.
4. Multi -Purpose Building:
a. Four season design that would expand into amphitheater / large gathering space
b. Storage, kitchen, permanent restrooms and power needed (make sure power is
extended around to key areas for large events).
c. Summer picnic facilities with grills and maybe a space for a fire pit but a
dedicated or permanent fire pit is not necessary.
Page 3
d. Stone fireplace that is beneath the roof but still outside for warming up during
winter activities
e. Warming house room that could be other use during summer (though no
additional meeting spaces required as there are other facilities that provide this).
f. Raised platform vs. grading:
i. Allow for outdoor space to be fenced in for ticketed / supervised events.
g. Potential programing elements (not limited to):
i. Farmers market
ii. Movie night(s)
iii. Plays
iv. Concerts
v. Seasonal Holiday Events
vi. Company Events (Wilson Tool, Excel Training Facility)
vii. Reunions / Large Picnics
viii. POW -WOW (Dream of Wild Health that brings in inner city kids)
h. Orientation of building in relation to sunrise and sunset (sun in eyes) and
protection from prevailing winds.
5. Large Gathering Space:
a. Space capable of holding large events such as Good Neighbor days, company
picnics, family reunions.
b. Space used for un -programmed sports and varying informal uses.
6. Ballfield
a. Some would like to maintain one ballfield in the park — maybe incorporate as part
of a multi -use lawn gathering space.
b. Plan to have consolidated ballfields at the Irish Avenue site in the future for
programmed athletic facilities that can hold tournaments.
7. Ice Skating Rink:
a. Locate close to multi-purpose building to allow for use of warming house and to
be partially sheltered from winter elements.
b. Pleasure skating only
8. Veterans Memorial:
a. Dedicated location of a memorial for local service members which can be a
changing memorial, not static.
b. Hugo was one of the first Yellow Ribbon Communities.
9. Playground:
a. New playground suitable for community draw that is possibly a boundless
playground (more fully accessible) and will accommodate a broad range of age
groups and abilities.
10. Splash Pad:
a. Needs to be located so parents / guardians can view from a distance.
b. Would be a draw for create continuous use of the park during summer months —
high priority item.
Page 4
11. Shelters:
a. Multiple smaller shelters for small groups.
b. A grill and power source associated with each shelter.
12. Environmental:
a. Locations to demonstrate the cities commitment to a more sustainable lifestyle
i. Rain Gardens
ii. Stormwater Ponds
iii. Lighting that is efficient and follows Dark Sky initiative
13. Other:
a. Variety of site amenities such as grills, trash receptacles, benches, pedestrian
lighting.
b. More vegetation providing various size, color and seasonal interest is desirable.
c. Buffer noisy park development areas from adjacent residential uses.
d. Ability to phase development
Tenative Proiect Schedule:
Conceptual Design
• WSB to prepare two conceptual park designs
• Nov. 24-26: Hold one design task force meeting to review and comment on conceptual
designs prior to public meeting
• Dec. 10: Attend the Parks, Recreation and Open Space Commission Meeting to present
the concept plans for review and comment
Master Plan design
• WSB to prepare one refined/preferred master plan design with estimate of probable costs
• January 2015: Attend the City Council meeting to present the Master Plan design for
review and adoption
• WSB to prepare phasing plan for approved master plan design and a site graphic suitable
for marketing/fundraising efforts
2014 Goals
Parks, Recreation and Open Space Commission
Approved by the Parks Commission at their December 11, 2013 meeting
• Create a trail development policy
•Discuss a trail along Elmcrest Avenue (revise Trails Plan if needed)
• Evaluate trail at 147th Street/ Geneva Avenue with future street
reconstruction
• Outline planning process
• Draft Master Plan Development Guidelines
• Finalize master plan
• Plan phasing of development
• Evaluate funding needs
• Review the Park Dedication Policy
• Review lacrosse field needs
• Study the Parks, Trails and Open Space Plan
• Respond to resident feedback
• Strategize and plan future recreation programming
• Create a fee policy/ cost recovery strategy
•Broaden scope of service
CITY OF HUGO
PARKS CAPITAL IMPROVEMENT PLAN
Updated November 12, 2014
PROJECTS
UNFUNDED PROJECTS*
YEAR
COST
Lions Park shelter design &
construction documents
2015
$100,000
Lions Park grading & utilities
2016
$500,000
Lions Park parking lots & trails
2016
$500,000
Lions Park shelter construction
2016
$1,000,000
Lions Park memorial/monument
2017
$200,000
Lions Park landscaping, turf &
fencing
2017
$215,000
Lions Park play equipment
2017
$250,000
Irish Avenue Park
Concept planning
2018
$40,000
Dog Park property purchase
2018?
$250,000
Fable Hill Park Improvements
2018
$70,000
* Unfunded projects will be possible only if funding becomes available through grants, private donations, park
dedication.
Ips,
forestlaketimes.com
http://forestia keti mes. com/2014/10/15/after-th e-ys-a pproval-now-what/
After the Y's approval, now what?
By Ryan
Howard
October 15, 2014 at 12:17
pm
After a whirlwind month-and-a-half process of debate, the Forest Lake City Council has approved the development
agreement and bond sale to bring a YMCA facility to town. The 3-2 vote secured $9 million in city funding for the $14
million structure on Forest Road North, but residents are left waiting for the next steps in the process.
Council meeting
At the two-hour Oct. 7 meeting that decided the agreement and bond sale, the council members and residents
rehashed the arguments for and against contributing taxpayer money and public land to the facility. During the
meeting's public hearing portion, resident Mike Devine said he wasn't against YMCAs in general, but he questioned
the usefulness of bringing one to Forest Lake.
"What am I getting out of this as a citizen that I can't get from driving over to Lino Lakes?" he asked, referencing the
YMCA that is roughly 10 minutes south of Forest Lake's Broadway Avenue exit.
Jeanne Hamlin didn't take a side on bringing the facility to town, but she noted her feeling that the process was
rushed and lacked data showing a city benefit. In particular, she remarked, she found it "extraordinarily inappropriate"
for the council to vote on taking the next step on the project on Aug. 25, when the agenda item regarding the facility
had been sent to them only hours before.
"The Y is not a fly-by-night organization; they understand that these things take time," she said.
On the pro -YMCA side was Mark Finneman, who said that though he originally questioned building the YMCA, he
changed his tune after additional thought. He believed the city was in good financial shape and primed to bring an
asset to the community.
"These are the times you grab hold of ideas that you can take advantage of," he said. "The city allocates its capital
expenditures in a very logical manner. It gets to its needs first and then moves on to its wants."
As for the council members, Councilmen Ben Winnick and Mike Freer reiterated their beliefs that the project was
unnecessarily rushed and taking advantage of questionable interpretations of state statute (for more information on
those objections, see the Sept. 25 story "Final YMCA approval set for next month). They also accused Councilwomen
Molly Bonnett and Susan Young and Mayor Chris Johnson of using back channels to leave Winnick and Freer out of
important YMCA discussions until they had already been presented to the YMCA. Freer was particularly upset with
Johnson and Bonnett talking to the YMCA in June about what it would take to bring a facility to town, before the
council talked about the matter at its July 1 meeting.
"It should have been brought to all of us to have a discussion," he insisted.
Johnson denied any wrongdoing and said the accusations put the council in danger of "getting into election season
crazies here." Young, who joined with Johnson and Bonnett to approve the facility, predicted that any perceived
downsides to building the facility would be outweighed by positives, and she called the YMCA a worthy beneficiary of
public funding, compared to contributions or tax increment financing given to some area businesses with few local
employees.
"This is something that would actually benefit folks," she said.
Local impact
Thanks to favorable bond bids and an interest rating of 2.74 percent, the city's bond repayments will be lower than
expected. At $600,835 a year, the city is projected to save $400,000 over the 20 -year bond repayment period from its
initial estimates, not including benefits from refinancing or early repayment. Taxpayers won't see a big difference,
however; the savings will cost the owner of a median value Forest Lake home (currently around $203,000) about $63
a year, as opposed to the previously estimated $66. Since the YMCA, not the city, will own the building and the
property, the city will incur no operating costs, though some critics of the plan felt that the city would be in a better
position by owning its own community center.
In addition to the facility, which has yet to enter the design phase but is expected to be modeled on the Elk River
YMCA, the organization will provide each household in Forest Lake with six family passes annually. In addition, there
will be community rooms open for area events, as well as dedicated time for non-member use of the gym, splash pad
and other areas. YMCA of the Greater Twin Cities CEO Glen Gunderson said the Y's development agreement with
the city allows for a bit more widespread community use of the facility than in other cities, but he added that the Y
always seeks to go beyond the agreements to serve residents.
"There's a very strong appetite (for this locally), which I think makes us particularly excited," he said. "This is a
community that I think really deserves a project like this."
The city has left the opportunity open for neighboring cities to help fund the public share of the facility in exchange for
similar benefits to the ones Forest Lake residents are entitled to in the development agreement.
In previous meetings, YMCA officials estimated that the facility would employ about 200 people, 30 of them full time,
with a payroll of approximately $2 million.
YMCA plans
Gunderson said that the YMCA approved the building of the facility during its Oct. 1 board meeting. Now, he said,
"We'll spend the next three to four weeks developing our overall project timeline."
After the timeline is developed, the design and architectural work on the project is expected to take about six months,
followed by nine to 12 months of construction. Gunderson said residents should expect ground to be broken on the
land west of the Washington County Government Services Center between late May and early July next year, with an
opening date in the summer of 2016. Throughout the design and construction process, he said, the Y plans on
establishing "milestones of communication" — points in the process when the organization will share with residents the
progress toward the facility's completion.
Gunderson said construction should not hinder access to the service center and added that the organization has
heard a lot of positive feedback about the facility from residents.
"I think the Y will be really well -situated there," he said. "It feels great because you have such strong interest and
community support, and you have a location that seems well -situated for the community to easily access it."
During the Oct. 7 City Council meeting, Councilman Ben Winnick predicted that some in town who are opposed to the
YMCA might sue the city over the bond approval, mentioning that he felt the YMCA should know about the possibility.
In a previous meeting, Winnick expressed his disapproval for the city moving forward with a bond sale that doesn't
require a referendum, predicting that the new City Council in 2015 would overturn the sale in some way.
Gunderson declined to comment on those possibilities and how they would affect the Y's decision making process,
though he mentioned that the possibility of a city bond default did not seem likely to the organization. Since no such
lawsuits or bond rescinding have occurred, he said, the YMCA is proceeding with its plans normally.
"Our intention is to (go) forward with the facility," he said.
i
F I,'
� r
w s
Vlii�i I1T
LE
,.
was BGELIIll Ju "B I FICENT" ►ROTH FILMS OOFo 99 FANNING SAM RBLEY IMFIA STAIINTOPi W MWU
[E$LEYi�'ILI.E mn � g`CkREPVIL1Fl�i�1$"a1d�IVE'�' IIH€ Y om k 0.B PFdRI} m"mCHRI$IF$ENZO�Y,k�E P�CNhR�PF OiP 1Ci y
"" GAff FRFENI,Vw mw COLE kNGEIMA E DDN RH NAE NR MMT SMl1N WM BRADSDIV
" DJOERON,pu.'LIIVD:ROOU+FRTOI'a 'ROBERTSTROMBERG
ilDAY, NC
Ln P M
FOR GRADES 6+
FREE
SNACKS & WATER
PROVIDED
SPONSORED BY
CIN OF HUGO AND
WHITE BEAR LAKE
AREA SCHOOLS
COMMUNITY
SERVICES
Hm-rolM.