HomeMy WebLinkAbout2014.03.03 CC PowerPoint SWPPPCity of Hugo SWPPP
o Storm
o Water
o Pollution
o Prevention
o Plan
City of
ugo
Purpose of Public Meeting
HCitug y oo
o Educate Citizens
o Answer Questions on the SWPPP
o Receive Public Comments
o Meet the Requirements of the
Permit
SWPPP Origins
i
r�
tHugoof
y
o National Pollution Discharge Detection
and Elimination program - NPDES
* NPDES Targets:
Construction Sites
Industrial Discharges
Urban Storm Water Discharges
SWPPP Required to Address
6 Minimum Control Measures
i
HCitug y oo
MCM 1 - Public Education and Outreach
o MCM 2 - Public Participation and Involvement
o MCM 3 - Illicit Discharge and Detection
o MCM 4 - Construction Site Stormwater Runoff
Control
o MCM 5 - Post Construction Storm Water
Management
o MCM 6 - Pollution Prevention and Good
Housekeeping
MCM1 Public Education and ki
Outreach iHu`go
o SWPPP on file at City Hall
o Storm water Articles Through
City Newsletter
o City's website has additional
information on storm water
pollution prevention
o Future work with HOA's and
their contractors good house
keeping measures
IVICIVI 2 Public Participation
and Involvement
Annual Public Meeting
i
CHUgoof
y
o Encourage Public Comments
o Determine Appropriateness of
Current Plan
o Incorporate Public Feedback Into
SWPPP
IVICIVI 3 Illicit Dischargeif::H::ugo
Detection and Elimination
o Recycling Programs
o Storm Sewer Maps
o Future Actions
Storm Pond Maintenance (149)
Ditch Maintenance
Sump Catch Basin Maintenance
Illicit Discharge and Connection
Ordinance (ERP) Enforcement Response
Procedure
Yearly Staff Training On Illicit Discharge
Web Based Reporting Feature
Illicit Discharge /Connection
hical-rect F 0111 LL bi'l
A _'
1 6 1 Cl*bn Wilar
City of
ugo
b6 6
Ca I.15eCf COt1lief ft, n
Illicit Discharge
City of
11--1
ugo
a
f:}
v,i
_r
f
,
14 1o,
• - 1 � • i. . u tit �� b` •. .� i . ie
4
Illicit Discharge
1Hu`Y o
g
� e �
s
Z 4 ti •`
,o
IMM lw*y
OPP
aG
4=1
r
4 �• L_ ~ t
4l
e.- a
Mfr ,~Prs
MCM 4 Construction Site ki� Hugo
Stormwater Runoff Control
=Staff Training
Sr. Engineering Technician,
Erosion/Sediment Control Specialist (U of M
Site Management class)
Building Official and Inspectors Certified
Erosion/Sediment Control Specialist (U of M
Site Management class)
Future
ERP's Enforcement Response Procedure
check list for each individual building site.
1=
MCM 5 Post Construction Storm liflHugo
T
Water Management `
o Surface Water Management Plan
In Place
o New Development Review and
Requirements
NURP Ponds
Infiltration Basins/Rain Gardens
Regional Treatment Ponds
Rate Control
Mitigation
MCM 6 Pollution Prevention
Good Housekeeping
andlif
HuCitgoy
o Storm Sewer Inspection Program
o Required By NPDES (20% inspected
annually) Currently 234 MS4 structures
o Hazardous Materials Storage
o (in place)
o Road Salt Applications (in place)
o Street Sweeping (in place)
City MS4 Base Map
r
k
`_T .I
PIZ
i 3
4
7�y
Y
` 4'
r'
" it
P
OVERFLOW STRUCTURE
BALD EAGLE TH1
mom
. .
1
fHCiutyg o
�j
STORM POND
BALD EAGLE TH1
POND OUTLET
BALD EAGLE TH 1 of
il
Ell
CWC FES 443
`yOIiiHugo
f
FUTURE
HclIiiI o
o PERMIT RENEWAL PROCESS
o POND INVENTORY
o POND MAINTENANCE
o NEW EROSION CONTROL DEVICES
o CONTINUED MAINTENANCE
New Erosion Control Devices
PFP""-� J r
1 1•
Huy o
g
I
Grit Chambers
L"
City of
ugo
Erosion Control Methods
City of
ugo
VAC TRUCK REMOVING SEDIMENT
City of
Hu0go
City OF
*Hugo
QUESTIONS AND COMMENTS
Steve Duff Senior Engineering Technician
Phone No. (651) 762-6316
Email sduff@ci.hugo.mn.us