Loading...
HomeMy WebLinkAbout2014.09.02 CC PowerPoint Bald Eagle DamBald Eagle Lake Outlet Update September 2, 2014 A WSB o f r Y - � . ��•��. JAS-e�.,'f?'` � � M'.� -� .s � � IAN d r _11w Bald Eagle Lake August 18 Council meeting Discussion topics Replacement of the outlet/dam Ongoing maintenance of the outlet/dam Council direction Review bridge alternative Review design in light of stormwater reuse A W, I Bridge Alternative Span the weir/outlet structure without disturbing Issues N Potential damage to inplace structure Impacts to adjacent properties/lake Easement acquisition Cost: $1,500,000 - $2,000,000 A WS Water Reuse Opportunities 0 Modify Bald Eagle Lake Outlet structure to: Store additional water in Bald Eagle Lake. N 1 inch of additional depth provides 27 million gallons (85 acre ft.) of additional storage. Provide piping/manhole structure for access Cost — 10-15% increase, or $60-$90,000 for structure plus costs for permitting. Permitting: DNR, RCWD, Corp of Engineers, other. a Cost for reuse system....TBD. A WS Water Reuse Opportunities Capture water downstream of dam E Construct storage area — 500 acre-feet (1.5 billion gal.) F Could be located to capture more runoff than Bald Eagle Lake �' Creates additional treatment — TMDL benefits Cost of $5-$10 million for storage area � Potential cost reductions through use of soils, reduction in captured runoff A WS Next Steps Discussion/direction from Council A WS AL WSB Current Funding Status Total Estimated Cost MnDOT Bridge funds Remaining Funding need $600,000 $252,000 $348,000 Outlet could be replaced within one year if funding available A WS