Loading...
HomeMy WebLinkAbout2015.05.18 CC PowerPoint NRI UpdateNRI Update May 18, 2015 Citgo ImiH 9 I arra ru Tiff 4 up F i� rA rf f �t �G7lC �i" M alai rM PFTA4r r r CUP Condition #5 There shall be no material stored in piles directly on the ground. Storage of Recyclable materials shall be limited to containers located under the covered structure on the easterly portion of the property and within the existing building. IMHUg Status / options site must match CUP plan and conditions. It doesn't Insist that site come into compliance Impose timelines May result in formal enforcement action Encourage an application for plan revisions Revisions through CUP amendment process Public Hearing at PC Ei u`go