HomeMy WebLinkAbout2015.05.18 CC PowerPoint NRI UpdateNRI Update
May 18, 2015
Citgo
ImiH
9
I
arra
ru Tiff
4 up
F
i�
rA
rf
f
�t
�G7lC �i"
M alai rM PFTA4r
r
r
CUP
Condition #5
There shall be no material stored in piles directly on
the ground. Storage of Recyclable materials shall be
limited to containers located under the covered
structure on the easterly portion of the property and
within the existing building.
IMHUg
Status / options
site must match CUP plan and conditions.
It doesn't
Insist that site come into compliance
Impose timelines
May result in formal enforcement action
Encourage an application for plan revisions
Revisions through CUP amendment process
Public Hearing at PC
Ei u`go