Background
• The City Council, Planning Commission, and EDA all had
various goals regarding entry monuments, TH61
corridor improvements, and marketing and promotion
of the City.
• The Beautification Subcommittee was formed in the
Summer of 2015.
• The subcommittee has these goals:
1. Evaluate entry monuments
2. Replacement of CSAH 8 banners
3. Evaluate downtown gateway elements
4. Evaluate the park standard policy
5. Establish a landscape replacement plan
6. Beautification of TH61 corridor
7. Evaluate Lions Park entry plazas
HCity of
ugo
Representatives
• Phil Klein —City Council
• Scott Arcand —Planning Commission
• Cindy Petty —Economic Development Authority
• Rannell Tennyson —Parks Commission
HCity of
ugo
Ewa He a ER I
s ni u mi, @ ni t!
In 2015 and 2016, City Council's goal to evaluate
criteria for entry monuments in the City
HCity of
ugo
Mom ra MI, a A i I m I ammft re
Current Entry Monument (After)
OF HUGO
L el�.:.H,llrll Not)' ��—
�
Ajw
-
jifmCITY OF HUGO
ESTABLISHED 19[}6
Ali
CITY OF HUGO'
4i.
City of
ugo
New Entry Monuments
• Priority Locations: North and South TH 61
•Smaller monuments
• Cohesive designs using similar materials
• As close to the Hugo border as feasible
GAV'
SSD
BY OTWERS
Proposed Southern Monument Site
r ;rte"
.. i 11.1 FI Y A 2 e e S
PPW
11 it AS VP �F. 10714
Al
J �+ •�, Z c
F - `.
LI v
Y
Legend
Hugo Border
Streets
Paroel_Boundary
} r. Monuament Location
AHuCity go of
Proposed Northern Monument Site
New Monument Sign Cost Estimates
• Monument Sign: $50,000 - $70,000 (each)
• This is without any grading, landscaping, etc.
• Additional work will need to be completed in
addition to the sign design:
• Surveying
• Grading/Drainage Plan
• Contact with property owners
HCity of
ugo
Rep acamen off (:C24H
City of
A�Hugo
Banner Background
• As part of the CSAH 8 project, street lights with
banner arms were installed on the 59 decorative
lights from Oneka Pkwy. To TH61.
• In 2007, the City Council approved the purchase of
55 banners (hung on every other light pole).
• Public Works has only a few banners left to replace
ones that look worn/tattered.
HCity of
ugo
Banners (Current)
Banners (New)
I
I
Hugo
Banner Cost
• 2007 (55 banners): Approximately $4,500
• 9 years of use
• 2016 (60 banners): Approximately $5,500
• Approximately 8 year "life expectancy"
HCity of
ugo
Fu H�a 1u)0H2QH22HQ)fl2
City of
a�Hugo
1. Continue discussions on downtown gateway
elements
2. Beautification of TH61 corridor
3. 170t" Street round -a -bout landscape replacement
4. Establish a landscape replacement plan
HCity of
ugo
City of
a�Hugo
Entry Monuments - Next Steps
• Provide direction to staff on how to move forward
with the entry monument project:
• Talk to the property owners
• Nicholson's
• MnDot
Washington County
• Obtain estimates for sign design, grading/drainage plan
sets, and labor costs
• Discuss funding options
• Discuss timing/phasing of signs
• Design sign and finalize plans
Hcity ofugo
CSAH 8 Banners - Next Steps
• The beautification subcommittee has
recommended approval of the new banner designs.
• If the Council is comfortable with banner designs,
we can begin the ordering process.
• Will take 2-4 weeks for production.