Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2016.12.05 CC PowerPoint Sunset Lake St Public Hearing
Neighborhood Meeting North Sunset Lake Area Roadway Improvement Project December 5, 2016 I& WSB LU i- V137TH-ST N- p — LU YJ 1 �I LU S TSN 136TH' g .{ --— 9 by s - ET z LU 130T-HIST N ? T I I OTH z ST 1!1 _ =_. z e w Y ti r .. y. � Z ~�7+ w -'� Sunset 6 d La ke° 125TH ST_N- Background • City Pavement Management Program • City roadways rated based on their condition • Identified roadways in need of improvements • Use the information to develop the City's Capital Improvement Plan (CIP) • Homestead Avenue, 132nd Street, Homestead Drive and 126th Street included in the CIP for roadway reconstruction • Neighborhood meeting held September 22, 2016 • City Council authorized Feasibility Study on October 3, 2016 A WSB City Council Received the Feasibility Study on November 7, 2016 and set the public hearing ,,,00" Current Roadway — A WSB Homestead Avenue Current Roadway A WSB 132"d Street 1 Current Roadway Wss 126th Street Proposed Improvements • Remove or reclaim existing pavement • Minor subgrade correction • New asphalt pavement to same road width with the exception of 126th Street • Asphalt curb replaced in-kind • Minor drainage improvements • Match existing driveways to new pavement A WSB � -: �137TH STN • p - ti 7� y — � �.�i. '136TH ST Nn•' d - - ro .' S, TF i 132�� z ® f LU 4 r J J w g• 4 w a 130TH,.ST N z 130 5T N - W �l � � w t z a fI >{J d (b Z LU .=� ------------- z r F 125TH STN 1 •, 906 Projected Costs/Financing • Estimated Pro j ect Cost $2,611,000 • Assessments (11 %) $2771100 • City Funds (89%) $213331900 • Capital Improvement Fund • State Aid Funding • Potential Grants • Assessment Rates A WSW • Single Family (Rural Roadway Reclamation) $31400 CITY ©F City Assessment Policy • Rural Roadway Reclamation • $3,400/unit • Direct frontage • Access • Review potential si • Corner lots prorated 132nd Street N 0 3 Ln M EU A M Ono Corner/other lot examples Through lot Street A 0.5 unit 0.5 unit Street B A WSB 3 -roadway frontages Street A 0.33 unit 0.33 unit 0.33 unit Street C Wid 1 1"37.TH'ST N a136TH'ST N cn X" 0 f132ND STN a wr_, � w r 130TH STNr' z 130TH ST N t LU �. LLF --w myof F33 Jr ) t r 125TH N i zz City Assessment Policy • Assessment can be pre -paid without interest • Assessments spread over a 1 0 -year period at 4-4.5% • Senior Citizen deferral is available for those over 65 years of age A WSB General Process • Process governed by Minnesota Statutes (Ch. 429) A WSB • Specific process outlined in the Statute • Includes a minimum of two formal Public Hearings • Prior to deciding whether or not to implement a proj ect • Prior to adopting the assessments for a project • Notices will be sent to each property owner Potential Schedule Neighborhood meeting City Council Receives Feasibility Public Hearing/consider implementing project Plan/Specification Preparation Neighborhood Open House With Plans Project Bidding Award Construction Contract Construction Assessment Hearing Assessment pre -pay period A 1/1/SB Sept 22, 2016 Nov 7, 2016 Dec 5, 2016 Jan -Feb 2017 February 2017 March 2017 April 2017 May -Oct 2017 Sept 2017 Oct 2017 Next Steps • Prepare Plans and Specifications A WSB