HomeMy WebLinkAbout2007.01.16 EDA Packet AGENDA
CITY OF HUGO
ECONOMIC DEVELOPMENT AUTHORITY MEETING
TUESDAY, JANUARY 16, 2007 - 9:30 AM
HUGO CITY HALL
9:30 am 1. Call to Order
9:31 am 2. Roll Call
9:32 am 3. Approval of Minutes
EDA Meeting of December 18,2006
9:35 am 4. Update and Discussion on TIF District
• TIF District Subcommittee
• TIF Policy and Application
• Egg Lake Development
• Schedule Public Hearing
10:30 am 5. Update on Downtown Master Plan for Concept Change
at Southwest Corner of County Road 8 and Highway 61
• Hugo Downtown Plan and Design Guidelines
11:00 am 6. Hugo Business Association Update
11:15 am 7. EDA 2007 Goals
11:30 am 8. Adjournment
BACKGROUND MEMO FOR THE EDA MEETING OF
Tuesday, January 16, 2007
3. Approval of Minutes EDA meeting of December 18,2006
City staff recommends that the EDA approve the minutes for the December 18, 2006
EDA meeting as presented.
4. Update and Discussion on TIF District
Staff has completed the necessary tests to determine if the proposed TIF District will
qualify. The proposed TIF District will qualify and has met the coverage and building
inspection tests as outlined in Minnesota State Statutes. Staff has attached a map of
the proposed TIF District.
Staff has been working with the TIF Subcommittee and Springsted to develop details
for the policy and application for the entire TIF District. The policy includes
requirements for a development to meet before it can qualify for TIF. Attached is the
draft TIF policy that was revised by the subcommittee and Paul Steinman from
Springsted. The EDA should review the policy and provide staff with comments.
The TIF application is a process by which the City can evaluate a project to see if it
will qualify for TIF. The applications will be graded by completing the application
review worksheet. From the evaluations of the worksheet the city will determine if
the project qualifies to receive TIF and the term the project will receive. The EDA
should review the application and provide staff with comments.
Staff has been working with the TIF Subcommittee to develop a plan for the
downtown to include what the EDA would like to see in the area along Egg Lake.
Staff has attached a map of the area across from City Hall and along Egg Lake to help
demonstrate the area we have potential to work with. The EDA should discuss what
kind of development they would like to see in the downtown area and proved staff
with comments.
The next step in the process is to schedule a public hearing at a City Council meeting
within the next couple of months. This will provide the public a chance to present
feedback to the City Council about the TIF District. The EDA should discuss the date
for the public hearing.
5. Update on Downtown Master Plan for Concept Change at Southwest Corner
of County Road 8 and Highway 61
At its March 15, 2006 meeting the EDA made a recommendation to staff to look at
having more office on the downtown plan for the southwest corner of County Road 8
and Highway 61. Bryan Bear has been working with Carolyn Krall from Landform to
develop a new plan for the area. Staff has attached a revised plan that includes office
buildings and requests comments from the EDA. Also attached is the Hugo
Downtown Plan and Design Guidelines for the EDA to review.
6. Hugo Business Association Update
The Hugo Business Association(HBA) launched their website in December just
before the New Year. Visit the HBA website at www.hugobusinesses.com. City
Administrator, Mike Ericson, attended the HBA's January 9, 2007 meeting and will
report about the City's involvement with the HBA.
7. EDA 2007 Goals
Staff has attached the EDA Goals for 2007.
MINUTES FOR THE EDA MEETING OF DECEMBER 18, 2006
EDA President Fran Miron called the meeting to order at 8:30 am.
PRESENT: Jan Arcand, Jim Bever, Tom Denaway, Mike Granger, Phil Klein, Brian
Thistle, and Fran Miron
City Administrator Mike Ericson, CD Director Bryan Bear, CD Intern Rachel Simone
ABSENT: None
APPROVAL OF MINUTES EDA MEETING OF NOVEMBER 20,2006
Miron stated that he was not present at the meeting.
Klein made motion, Thistle seconded, to approve the minutes for the EDA meeting of November
20, 2006 with the change of members absent.
All aye. Motion carried.
UPDATE AND DISCUSSION ON TIF DISTRICT
The City is getting closer to establishing a Tax Increment Financing(TIF) District. The
TIF subcommittee is now meeting on a regular basis again to help piece together some
details for the TIF District. They last met on Thursday, December 7, 2006 to talk about a
strategy for the subcommittee.
Earlier on in the process the EDA talked about what kind of developments they would
like to see come into the Downtown. At the EDA meeting staff asked to have a
discussion with the EDA on what they would like to see for development on the City
owned property across City Hall along Egg Lake. Staff requested direction to send
developers to put a project together for that area. Staff recommended that the EDA
discuss what they would like to see there and give direction to staff.
CD Director gave an update on the establishment of the TIF District. He stated that staff,
Springsted, and the TIF subcommittee will be working on the TIF policy and application
for development. He stated that the City owns many properties on Egg Lake that is
planned to be redeveloped. The Anderson properties that hold Carpenters Restaurant and
the Antique Shop may also be in play for redevelopment.
Granger asked about the Bunge property. City Administrator stated that staff has been in
contact with them and they are willing to listen.
Miron asked if staff has contacted all property owners that own land on the west side of
Egg Lake. CD Director stated that we have and there are two properties owners that are
not willing to sell their property to the City at this time.
Klein asked about access to the properties that are planned to be redeveloped along Egg
Lake. CD Director stated that the driveways are likely to be vacated and referred to the
downtown redevelopment map.
Miron asked if there was an easement the City owned along Egg Lake and between the
properties on the west side. CD Director stated that he was not sure and that staff would
look into is there is an easement.
Arcand stated it seems that TIF District have had some bad press in the papers recently
and asked if the City has had any bad feedback towards TIF. CD Director stated most
people have been supportive. Miron stated that most of the big issues with bad press on
TIF districts are when condemnation of land is happening. CD Director stated that the
articles that he has seen of late have been about the suburbs taking big businesses from
the inner city. City Administrator talked about when Nor Lakes came into the Bald Eagle
Industrial Park they received TIF subsidies and asked for rail access. Granger stated that
people only really here about bad TIF projects and little about good ones.
Miron stated that we need to start thinking about a TIF policy and to think about what
kind of development would be best for the City.
Granger stated that even though the City does not own the Holmgren property it can be
worked around. He asked what the market study said about what development would
work in the City. CD Director stated that the market study talks about retail, office, and
housing mostly,but housing may not be a priority any more.
Bever stated that he would like to see Egg Lake being preserved with the downtown
redevelopment and also be able to have view of the lake from Highway 61. He would
also like to see more businesses, offices and restaurants in the area. He is not that big on
having senior housing in downtown. Granger, Arcand, and Miron agreed.
Arcand asked if the properties along Egg Lake were already zoned Commercial. CD
Director stated that they are currently zoned Central Business (C-1).
Klein stated that he still thinks that having businesses with housing above is a good idea.
Miron stated that he supported that. Granger stated he liked the idea of mixed use.
Granger asked if we will have to use eminent domain at any time. CD Director stated that
this idea will come up at some point,but he does not know if we will use it.
CD Director stated that the TIF subcommittee will be working on the TIF policy and
applicant once staff gets a draft completed. The subcommittee will use the ideas that are
brought forth today to work towards that final draft.
Denaway stated that we should be thinking about the big picture. We need to remember
when putting the TIF policy and application together that we have to make it for the
whole district and not just the downtown area. He stated that we also need to look at the
portion of the policy that sets what we want to spend money on like environmental
remediation, land acquisition and demolition of buildings.
Granger stated that we need to take a close look at the qualifications on the application to
make sure we are not limit people from doing a good project.
Bever stated that he likes the job creation portion of the policy
Arcand asked if the DNR has policies that the City has to follow for the lake and wetland
setbacks.
Thistle asked if a park was still the idea for a portion of the property along Egg Lake. He
stated he liked the idea of lake view from Highway 61. CD Director stated that the park
idea was favored by the citizens at the open house and that we must be aware of that.
COMPREHENSIVE PLAN UPDATE FOR 2008
CD Director stated that in January staff would like to get the City Council,Planning
Commission, EDA, and Parks Commission together for a kick off meeting to talk about
the comprehensive plan update process. This joint meeting will go over what the
comprehensive plan process will be and to figure out how much public involvement there
will be.
The EDA will be working on issues such as a location of a possible new industrial park,
what businesses the City needs, and the land use map.
Arcand asked if we will expand the MUSA boundary. CD Director stated that we may
not need a MUSA any more but if we do not have one we will have to create a growth
policy for the City.
DISCUSSION ON WASHINGTON COUNTY AND ITS COMMUNITIES
COMPREHENSIVE ECONOMIC DEVELOPMENT STRATEGY
Washington County has provided the City with a draft proposal for a comprehensive
economic development strategy for the County and its communities.The proposal is
suggesting that there be a partnership with the County and its cities to work together on
appropriate economic growth within the County. There was a meeting on November 30,
2006 to talk about the economic development strategy between Washington County and
its communities. Washington County would like to set up a work group for this that
includes a City designee that will represent the City.
City Administrator updated the EDA on the Washington County economic development
strategy meeting. The County would like to have a city representative to be at the
workshops to establish the strategy.
The EDA suggested having a staff member be designated to go to the workshops. Mike
Ericson, the City Administrator has decided he will be the city representative to go the
workshops and report back to the EDA. Arcand asked if this will be a policy that will
have to be approved at sometime. Miron stated that this is just a way for the County to
get involved in economic development with its communities.
DISCUSSION ON 2007 GOALS
Attached are the City Council goals for 2006 and the on going priorities for the City. In
January there will be a City Council workshop to establish the 2007 City goals. The EDA
discussed several goals that they would like to set for 2007. Staff will compile the goals
and include them in the next EDA agenda packet.
MISCELLANEOUS
Arcand stated that the EDA meetings for January and February must get changed due to
the holidays that occur on the regularly scheduled dates.
Granger made a motion, seconded by Arcand,to move the EDA meeting dates to the
Tuesday after the regular meetings at 9:30 am.
All aye. Motion carried.
ADJOURNMENT
Granger made motion,Klein seconded to adjourn the meeting at 10:20 am
All aye. Motion carried.
Page 1 of 1
Rachel
From: Paul Steinman [psteinman@springsted.com]
Sent: Friday, January 12, 2007 12:32 PM
To: Rachel
Cc: Bryan Bear
Subject: Hugo Draft TIF Policy 1-11-07.DOC
Follow Up Flag: Follow up
Flag Status: Yellow
Attachments: Hugo Draft TIF Policy 1-11-07.DOC
Rachel:
Here is the latest Draft of the Hugo TIF Policy. I re-worked all the sections to reflect our
discussion and the discussion with the Subcommittee. I also re-worked the Worksheet so that
it is a "Redevelopment Worksheet". I left all the major policy issues highlighted in yellow, and
where I made changes since our Subcommittee discussion, I've highlighted in turquoise.
When you print these out in black and white, the highlighted portions show up in lighter
(yellow) and darker (turquoise) shades so it should be easy to lead the EDA through the
discussion.
would recommend that they spend a fair amount of time understanding and walking through
the Redevelopment Worksheet, as I have taken some liberties with creating new criteria and
the ranking which I assigned to them. Please call me if you have any questions about it.
I am available to go to the meeting and assist if you choose -just let me know.
Thanks.
Paul T. Steinman
Vice President, Consultant
Springsted Incorporated
380 Jackson Street, Suite 300
St. Paul, MN 55101-2887
651-223-3066 Direct Dial
This email and any files transmitted with it are confidential and are intended solely for the use
of whom it is addressed. If you are not the intended recipient, any disclosure, copying, or
distribution of the message, or any action or omission taken by you in reliance on it, is
prohibited and may be unlawful. If you have received an email message in error, please notify
the sender immediately and return and/or destroy the original message.
1/12/2007
r '
City of Hugo, Minnesota
Tax Increment Financing
Policy & Application
Adopted:
Revised:
` Table of Contents
I. Policy Purpose 3
II. Objectives of Tax Increment Financing 3
III. City of Hugo Policies for the Use of TIF 4
IV. Qualifications 5
V. Subsidy Agreement & Reporting Requirements 6
VI. Application Process 7
VII. Application 8
Applicant Information 8
Project Information 9
Public Purpose 9
Sources & Uses 10
Checklist &Additional Information 11
VIII. Application Review Worksheet 12
IX. Exhibits 14
A Corporation/Partnership Description
B Project Description
C Shareholders
D But-for Analysis
E Prospective Lessees
2
I. POLICY PURPOSE
For the purposes of this document, the term "City"shall include the Hugo City Council and
Economic Development Authority.
The purpose of this policy is to establish the City of Hugo's position relating
to the use of Tax Increment Financing (TIF) for private development above
and beyond the requirements and limitations set forth by State Law. This
policy shall be used as a guide in the processing and review of applications
requesting tax increment assistance. The fundamental purpose of tax
increment financing in Hugo is to encourage desirable development or
redevelopment that would not otherwise occur but for the assistance
provided through TIF.
The City of Hugo is granted the power to utilize TIF by the Minnesota Tax
Increment Financing Act, as amended. It is the intent of the City to provide
the minimum amount of TIF at the shortest term required for the project to
proceed. The City reserves the right to approve or reject projects on a case
by case basis,taking into consideration established policies, project criteria,
and demand on city services in relation to the potential benefits from the
project. Meeting policy criteria does not guarantee the award of TIF to the
project. Approval or denial of one project is not intended to set precedent for
approval or denial of another project.
The City Council and Eccmic Developmtt A a frog
this policy for projects that supersede the objectives identified herein
II. OBJECTIVES OF TAX INCREMENT FINANCING
As a matter of adopted policy, the City will consider using TIF to assist
private development projects to achieve one or more of the following
objectives:
• To retain local jobs and/or increase the number and diversity of jobs
that offer stable employment and/or attractive wages and benefits.
• To encourage additional unsubsidized private development in the
area, either directly or indirectly through "spin off' development.
• To facilitate the development process and to achieve development on
sites which would not otherwise be developed but/for the use of TIF.
• To remove blight and/or encourage redevelopment of commercial and
industrial areas in the city that result in high quality redevelopment
and private reinvestment.
• To offset increased costs of redevelopment (i.e. contaminated site
clean up) over and above the costs normally incurred in development.
• To create opportunities for affordable housing.
3
• To contribute to the implementation of other public policies, as
adopted by the city from time to time, such as the promotion of
quality urban or architectural design, energy conservation, and
decreasing capital and%or operating costs of local government.
III. POLICIES FOR THE USE OF TIF
a. When possible, TIF shall be used to finance public improvements
associated with the project. The priority for the use of TIF funds
is:
1. Public improvements, legal, administrative, and
engineering costs.
2. Site preparation, site improvement, land purchase,
demolition, and environmental remediation.
3. Capitalized interest, bonding costs.
b. The following types of TIF districts may be established:
1. Economic Development Districts
2. Redevelopment Districts
3. Housing Districts
Other types of TIF districts, along with specific criteria, may be
considered on a case by case basis.
c. TIF assistance will be provided to the developer upon receipt of the
increment by the City, otherwise referred to as the pay-as-you-go
method. Requests for up front financing will be considered on a
case by case basis.
d. A maximum of ten percent (10%) of any tax increment received
from the district shall be retained by the City to reimburse
administrative costs.
e. Only for projects which supersede the objectives identified herein
will the term of the TIF assistance exceed 15 years.
f. Any developer receiving TIF assistance shall provide a minimum
of twenty percent (20%) cash equity investment in the project. TIF
shall not be used to supplant cash equity.
g. TIF will not be used in circumstances where land and/or property
price is in excess of fair market value. An appraisal by a third
party, agreed upon by the City and Developer, will determine the
fair market value of the land.
4
h. Developer shall be able to demonstrate a market demand for a
proposed project. TIF shall not be used to support purely
speculative projects.
i. TIF will not be utilized in cases where it would create an unfair
and significant competitive financial advantage over other projects
in the area.
j. TIF shall not be used for projects that would place extraordinary
demands on city services or for projects that would generate
significant environmental impacts.
k. The developer must provide adequate financial guarantees to
ensure completion of the project, including, but not limited to:
assessment agreements, letters of credit, personal guaranties, etc.
1. The developer shall adequately demonstrate, to the City's sole
satisfaction, an ability to complete the proposed project based on
past development experience, general reputation, and credit
history, among other factors, including the size and scope of the
proposed project.
m. For the purposes of underwriting the proposal, the developer shall
provide any requested market, financial, environmental, or other
data requested by the City or its consultants.
IV. PROJECT QUALIFICATIONS
All TIF projects considered by the City of Hugo must meet all of the
following requirements:
a. To be eligible for TIF, a project shall result in:
i. For Economic Develo ment TIF Districts, new construction of
a minimum of square feet;
ii. For Economic Development TIF Districts, the minimum
me job per $100,000 04
iii. For Redevelopment TIF Districts, a minimum value increase
of I times the current year assessed value; and,
b. The project shall meet at least one of the objectives set forth in
Section II and satisfy all the provisions set forth in Section III of
this document.
c. The developer shall demonstrate that the project is not financially
feasible but-for the use of TIF.
5
d. The project must be consistent with the City's Comprehensive
Plan, Land Use Plan, and Zoning Ordinances.
e. The project shall serve at least two of the following public
purposes:
• Creation of jobs with livable wages and benefits.
• Increase of tax base.
• Enhancement or diversification of the city's economic base.
• Industrial development that will spur additional private
investment in the area.
• The project contributes to the fulfillment of the City's
development or redevelopment objectives.
• Removal of blight or the rehabilitation of a high profile or
priority downtown site.
V. SUBSIDY AGREEMENT & REPORTING REQUIRMENTS
All developers/businesses receiving tax increment financing assistance from
the City of Hugo shall be subject to the provisions and requirements set
forth by state statute 116J.993 and summarized below.
All developers/businesses receiving TIF assistance shall enter into a
subsidy agreement with the City of Hugo that identifies: the reason for the
subsidy, the public purpose served by the subsidy, and the goals for the
subsidy, as well as other criteria set forth by statute 116J.993.
The developer/business shall file a report annually for two years after the
date the benefit is received or until all goals set forth in the application and
performance agreement have been meet, whichever is later. Reports shall
be completed using the format drafted by the State of Minnesota and shall
be filed with the City of Hugo no later than March 1 of each year for the
previous calendar year. Businesses fulfilling job creation requirements
must file a report to that effect with the city within 30 days of meeting the
requirements.
The developer/business owner shall maintain and operate its facility at the
site where TIF assistance is used for a period of five years after the benefit
is received.
In addition to attaining or exceeding the jobs and wages goals set forth in
the Subsidy Agreement, the applicant shall meet the qualifications set forth
in Section IV of this document.
Developers / Businesses failing to comply with the above provisions will be
subject to fines, repayment requirements, and be deemed ineligible by the
State of Minnesota to receive any loans or grants from public entities for a
period of five years.
6
VI. APPLICATION PROCESS
1. Applicant submits the completed application along with all
application fees.
2. City staff reviews the application and completes the Application
Review Worksheet.
3. Results of the Worksheet are submitted to the appropriate governing
authorities for preliminary approval of the proposal.
4. If preliminary approval is granted, the Tax Increment Financing
Plan, along with all necessary notices, resolutions and certificates are
prepared by City staff and/or consultants.
5. Notices are published and sent to the county and school board.
6. Public hearing(s) on the proposed project are held.
7. The EDA recommends approval or denial of the project to the City
Council.
8. The City Council grants final approval or denial of the proposal.
7
VII. APPLICATION FOR TAX INCREMENT FINANCING
A. APPLICANT INFORMATION
Name of Corporation/Partnership
Address
Primary Contact
Address
Phone Fax Email
On a separate sheet, please provide the following:
• Brief description of the corporation/partnership's business, including
history, principal product or service, etc. Attach as Exhibit A.
• Brief description of the proposed project. Attach as Exhibit B.
• List names of officers and shareholders/partners with more than five
percent (5%) interest in the corporation/partnership. Attach as
Exhibit C.
• A but-for analysis. Attach as Exhibit D.
Attorney Name
Address
Phone Fax Email
Accountant Name
Address
Phone Fax Email
Contractor Name
Address
Phone Fax Email
Engineer Name
Address
Phone Fax Email
Architect Name
Address
Phone Fax Email
8
B. PROJECT INFORMATION
The project will be:
Industrial Greenfield: New Construction Expansion
Commercial Redevelopment: New Construction Rehabilitation
Industrial Redevelopment: New Construction Rehabilitation
Housing Redevelopment: New Construction Rehabilitation
Mixed Use Redevelopment: New Construction Rehabilitation
Other
Please explain the basic components of the project proposed, i.e., amount of
new commercial square footage, numbers of housing units (rental or owner
occupied), etc.
The project will be: Owner Occupied Leased Space
If leased space, please attach a list of names and addresses of future lessees and indicate
the status of commitments or lease agreements.Attach as Exhibit E.
Project Address
Legal Description
Site Plan Attached: Yes No
Amount of Tax Increment Requested for:
Building Demolition $
Environmental Remediation $
Public Improvements $
Site Improvements $
Land Acquisition $
(Land Acquisition shall not exceed M of total subsidy request)
Total Subsidy Requested $
Current Assessed Value on Project Site: $
Current Real Estate Taxes on Project Site:
City $
County $
School District $
Estimated Assessed Value upon Completion: Phase I $
Phase II $
Estimated Real Estate Taxes upon Completion: Phase I $
9
Phase II $
Construction Start Date:
Construction Completion Date:
If Phased Project: Year % Construction Completed
Year % Construction Completed
C. PUBLIC PURPOSE
It is the policy of the City of Hugo that the use of Tax Increment Financing
should result in a benefit to the public. Please indicate how this project will
serve a public purpose.
_Job Creation: Number of existing jobs
Number of jobs created by project
Average hourly wage of jobs created
_Increase in Tax Base
_Enhancement or diversification of the city's economic base.
New industrial development which will result in additional private
investment in the area.
_The project contributes to the fulfillment of the City's development or
redevelopment objectives.
_Removal of blight or the rehabilitation of a high profile or priority
downto" site.
Other:
D. SOURCES & USES
SOURCES NAME AMOUNT
Bank Loan $
Other Private Funds $
Equity $
Fed Grant/Loan $
State Grant/Loan $
Other Loans $
ID Bonds $
Tax Increment $ 0 **
TOTAL $
"Note: Tax Increment is not an upfront funding source as it will be
provided only on a pay-as-you-go basis. Developer needs to identify
funding sources to cover ALL costs up front, absent Tax Increment.
USES AMOUNT
Land Acquisition $
Site Development $
Construction $
Machinery & Equipment $
Architectural & Engineering Fees $
10
Legal Fees $
Interest During Construction $
Debt Service Reserve $
Contingencies $
TOTAL $
11
E. ADDITIONAL DOCUMENTATION
Applicants will also be required to provide the following documentation.
A) Written business plan, including a description of the
business, ownership/management, date established,
products and services, and future plans
B) Financial Statements for Past Two Years
Profit & Loss Statement
Balance Sheet
C) Current Financial Statements
Profit & Loss Statement to Date
Balance Sheet to Date
D) Two Year Financial Projections
F) Personal Financial Statements of all Major Shareholders
Profit & Loss
Current Tax Return
G) Letter of Commitment from Applicant Pledging to Complete
During the Proposed Project Duration
H) Letter of Commitment from the Other Sources of Financing,
Stating Terms and Conditions of their Participation in
Project
n refundable
ChAk for $*;000 to be placW in es` _ 6ed by the City
to complete analysis of the subsidy requested, and to pay costs
associated with Attorney's fees to for the TIF Agreement
(unused portion to be refunded)
The undersigned certifies that all information provided in this application is true and correct to
the best of the undersigned's knowledge. The undersigned authorizes the City of Hugo to check
credit references and verify financial and other information. The undersigned also agrees to
provide any additional information as may be requested by the City after the filing of this
application.
Applicant Name Date
By
Its
12
TAX INCREMENT FINANCING PROPOSAL REVIEW WORKSHEET
Redevelopment Districts
1. The project meets the criteria set forth in Section III of the City's
Tax Increment Financing policy.
a) Meets minimum thresholds for size, value, and tax capacity.
b) Meets at least one of the objectives in Section III and satisfies
the provision set forth in Section IV.
c) Demonstrates need for TIF with the but-for analysis.
e) Consistent with all city plans and ordinances.
f) Serves at least two public purpose as defined in Section IV.
2. Ratio of Private to Public Investment in Project: Points:
$ Private investment 5:1 5
$ Public Investment 4:1 4
Ratio Private : Public Financing 3:1 3
2:1 2
Less than 2:1 1
3. Structure of Financing: Points:
< 10% of Subsidy Requested for Land Acq.
11% - 20% of Subsidy Requested for Land Acq.
21% - 30% of Subsidy Requested for Land Acq. iq_
31% - 40% of Subsidy Requested for Land Acq. 2
41% - 50% of Subsidy Requested for Land Acq.
4. Type of Project: Points:
/o Owner Occupied 5
Mix Owner Occupied & Investment 4
Investment Property 3
5. Use: Points:
Retail 5
Office/Commercial 4
Mixed-use 3
Housing 3
Industrial 1
6. Type of Development: Points:
Redevelopment of Substandard Structures 5
Development of Vacant Land 3
7. Job Creation/Wage Level Points:
15+ Full Time Equivalent (FTE) Jobs, $15-$20 per hour 5
10-14 FTE's, $10-$14 per hour 4
1-9 FTE's, $7-$9 per hour 3
13
8. Assessed Value: Points:
7+ times current 5
6 times current 4
5 times current 3
4 times current 2
3 times current 1
9. The project will pay annual Points:
property taxes in the first fully 50,000+ 5
assessed year of$ 35,000+ 4
20,000+ 3
10,000+ 2
Under 10,000 1
10. Likelihood that the project will result in Points:
unsubsidized, spin-off development. High 5
Moderate 3
Low 1
Sub - Total Points: of a possible 45 points.
8. Bonus Points Bonus Points:
The project will be 100% Pay-as-you-go TIF. 3 points
The project meets the goals of downtown redevelopment 2 points
Total Points•
Overall Project Analysis: 40-48 Points Max Remaining Term
35-39 Points 65-75% of Remaining Term
25-34 Points 40-50% of Remaining Term
15-24 Points 25-30% of Remaining Term
0-14 Points Not Eligible
14
EXHIBIT A
Description of the corporation or partnership
EXHIBIT B
Description of the proposed project
EXHIBIT C
Names of officers and shareholders/partners with more than five
percent (5%) interest in the corporation/partnership.
EXHIBIT D
But for analysis
EXHIBIT E
Prospective Lessees
15
SAMPLE BUT-FOR ANALYSIS
WITH NO WITH
TAX INCREMENT TAX INCREMENT
SOURCES AND USES SOURCES AND USES
SOURCES SOURCES
Mortgage 9,600,000 8,667,000
Equity 2,400,000 2,400,00
Tax Increment Financing 0 933,000
TOTAL SOURCES 12,000,000 12,000,000
USES USES
Land 1,500,000 1,500,000
Site Work 300,000 300,000
Soil Correction 468,000 468,000
Demolition 100,000 100,000
Relocation 65,000 65,000
Subtotal Land Costs 2,433,000 2,433,000
Construction 6,750,000 6,750,000
Finish Manufacturing 250,000 250,000
Subtotal Construction Costs 7,000,000 7,000,000
Soft Costs 350,000 350,000
Taxes 35,000 35,000
Finance Fees 850,000 850,000
Project Manager 542,000 542,000
Developer Fee 540,000 540,000
Contingency 250,000 250,000
Subtotal Soft Costs 2,567,000 2,567,000
TOTAL USES 12,000,000 12,000,000
Income Statement Income Statement
Sq. Ft. Per Sq. Ft. Sq. Ft. Per Sq. Ft.
Rent-Space 1 100,000 $8.00 800,000 100,000 $8.00 800,000
Rent-Space 2 25,000 $8.50 212,500 25,000 $8.50 212,500
Rent-Space 3 25,000 $9.00 225,000 25,000 $9.00 225,000
Other 0 $0.00 0 0 $0.00 0
1,237,500 1,237,500
Mortgage 20 Term 1,051,646 20 Term 949,439
9.00% Interest 9.00% Interest
9,600,000 Principal 8,667,000 Principal
Net Income 185,854 288,061
Total Return on Equity 7.74% 12.00%
16
EXHIBIT A
Description of the corporation or partnership
17
EXHIBIT B
Description of the proposed project
18
EXHIBIT C
Names of officers and shareholders/partners with more than five
percent (5%) interest in the corporation/partnership.
19
EXHIBIT D
But for analysis
20
EXHIBIT E
Prospective Lessees
21
IS
4 e
_
SL
N ,
FINALE
�. \I
L
' 1 .
LEY
c _
e �
•'.
,vw
LAY } n a , it k*taffy J
i
''-FONDACC FO _ -- -
1-4
•
WOXHILL
, AL
¢ ,
147TH
IT
fie; ;
.r
_ S-
_ LOWER 147TH
s �
ga
x
,
♦ r
1
x
0 s gym:
n<.
At—
i
Y ! T
'
a
r
;�; a rq i•'� * � . . y ,
n
4
/ */
ti + ae
4 Legend
145TH
u.
• • Lake Prop-rt
00—ft—setback
easement
y
---
--
iwater
"I
City of Hugo, Minnesota
Tax Increment Financing (Redevelopment)District No.
and
Tax Increment Financing Policy
Preliminary Time Schedule for Approval
1
November/December 2006 Complete building inspections of p ies within proposed boundaries
of Districtei
November/December 2006 Analyze blight findings,mniAA final determination of District boundaries
November/December 2006 TIF Subcommittee meeting to review boundaries,disctfs timeline and
process
December 2006 D „TIF Plan and TIF Policy
January 8,2007 City-� cil calls for public hearing for the TIF Plan to be held on
Marc+ ,a2007
(Resol ', o ' ed by Briggs&Morgan)
January 2007 bcome meeting—discuss what primary components should
_ i d i IF Policy
Februar ; 007 Council worksession to review draft TIF Plan and draft TIF Policy
On/Before'February 4,2007 County Commissioner receives notification letter
Y 30 days prior to publication of notice of public hearing
(Sent by SPRINGSTED)
On/Before February 15, ? County and School District receive impact letters&draft TIF plan
30 days prior to public hearing
(Sent by SPRINGSTED)
February 19, 2007 Economic Development Authority reviews TIF documents and TIF
Policy, makes recommendation to Council
February 28, 2007 City Planning Commission reviews TIF documents
(TIF documents provided by SPRINGSTED)
(Resolution provided by Briggs and Morgan)
1/11/2007
March 5, 000 City Cun,c|@/e� w TIF documents and Plic
March 7, 000 Publictio� n/nfc, eof public hearing
Deadline: March { 20 10-30days prior mpublic hearing
(Arrangements made by SPRINGS Eq
March 19, 000 CilCunclhlodspublic harng, and adopts resolutions
establishing TIF District, resolution approving TIF Policy
(Resolution/ovddbBriggs and U77"'r/
. .
After MJm ]% 000 State filing and regm4lro m tion%F$eTIF Dsnld
(Completedb SPRINGS
� .
<\ \ 77 r
\ \ >
�«<»
l
114412007
Rachel
From: Bryan Bear
Sent: Wednesday, January 10, 2007 12:35 PM
To: Rachel
Subject: FW: plan revised per our discussion
Attachments: SKMBT_C45007O11011480.pdf
SKMBT_C45007011
011480.pdf(45 ...
Please copy this e-mail as well as the drawing for the EDA meeting
-----Original Message-----
From: Carolyn Krall [mailto:ckrall@landformmsp.com]
Sent: Wednesday, January 10, 2007 12:14 PM
To: Bryan Bear
Cc: Kendra Lindahl
Subject: FW: plan revised per our discussion
Bryan:
this is still an unfinished sketch, but I wanted to get your input before we got it fully
rendered and colored up. I think this reflects our conversation last night, but do let me
know if I missed anything.
The plan shows a significant office complex on Hwy 61 (2-3 story building on the corner,
1-2 story building to the south) ; a branch bank with drive-through is shown on the western
corner; and two single story buildings with 22 office condo's are in the center. The
office condos have parking directly in front of the buildings, head-in along the street
(like an old-style Main Street) reducing the impermeable surface over a more traditional
parking lot and streets with no parking. Since there is no through traffic on this site, I
think it should be workable. Then the plan allows for significant open space and ponding
for the large office parking lots.
The only thing I might add for the EDA's consideration, is that if there was a residential
component -- if the southern-most office building was senior assisted living, for instance
-- then the large parking lot could be shared and the site would be more active 24/7.
Might be worth talking about with the EDA (without changing the plan) .
Let me know if you have suggestions or revisions and I'll try and get this back out to you
later today-tonight.
Thanks,
Carolyn
612-638-0253
-----Original Message-----
From: landform@landform.net [mailto:landform@landform.net]
Sent: Wednesday, January 10, 2007 11:53 AM
To: Carolyn Krall
Subject: Message from KMBT C450
The following document has been scanned on the Fiery and attached to this email:
SKMBT C45007011011480.pdf
1
Revised Planlor SW Corner : : Hwy 61
r
I
'40 Y41
c f
P I N I of i
a
Z =
a
0 50' rv17. 2DC m d
FORM
LAND._......
x
x
S
I*tY of
Hugo
Downtown
Plan
Desi* gn
Gui* deli* nes
January 16, 2007
Credits &Acknowledgements:
We would like to thank the City of Hugo's citizens—the residents and
business owners—who attended the workshops and meetings, sent in
their comments and gave their time to participate in the planning process.
Their input has been invaluable in developing a master plan and design
guidelines for the downtown area.
We would like to thank the City of Hugo's City Council, Planning
Commission, City staff and consultants for leading this planning process.
Funding for development of the downtown design guidelines and the
preparation of this document was provided by a Livable Communities
Opportunity Grant from the Metropolitan Council in 2004.
City Council
Fran Miron, Mayor
Becky Petryk, Council Member Ward 1
Frank Puleo, Council Member Ward 2
Chuck Haas, Council Member Ward 3
Mike Granger, Council Member At Large
Planning Commission
Dave Schumann, Chairperson
Bronwen Kleissler
Tom Weidt
Ron McRoberts
Victoria Hoffbeck
Bob Rosenquist
Kelly Bailly
City of Hugo
Mike Ericson, City Administrator
Bryan Bear, Community Development Director
Michele Lindau, Community Development Assistant
Mary Ann Creager, City Clerk
Jay Kennedy, City Engineer(WSB)
Kendra Lindahl, City Planner(Landform)
Planning & Urban Design Consultant
Carolyn Krall, AIA
LANDFORM
Page 1 of 23
Hugo Downtown Planning Framework
Incorporated in 1906, Hugo is a rural small town with a family-oriented feel. As Hugo grew,
the intersection of Forest Boulevard (now Highway 61) and Frenchman Road (now 145th
Street) became the center of town. With a train depot and an active feed mill, this was the
ideal location for local, small businesses. A downtown neighborhood began to grow into a
comfortable, rural village. It is this small village familiarity that the residents of Hugo wish to
preserve.
Aerial Photograph of Hugo in 1974
Minnesota Historical Society
The Hugo Downtown Framework Plan and Design Guidelines are intended to provide
direction to new development in downtown Hugo and, where needed, to shape plans for
redevelopment. The Plan illustrates the type of commercial and residential development, civic
and community facilities, and amenities envisioned by the citizens of Hugo. The Plan extends
beyond the central commercial business district (CBD)to illustrate the entire downtown
commercial area of Hugo, both existing and envisioned in the future. This vision of future
development in Hugo encourages commercial growth, while seeking to concentrate that
growth, around the downtown area.
The Planning Process
The Hugo downtown plan and preliminary design guidelines were originally developed in 1998
to address redevelopment of the downtown commercial "Main Street' on Forest Boulevard
(Highway 61). But the County Road 8 improvements and rerouting required that the original
plan be revisited. The new plan was needed to address the developable area along County
Road 8 and to consider the impact of the new County Road 8 and Highway 61 intersection.
This planning process began in the fall of 2003 and included workshops with the City Council
and downtown business and property owners. A community-wide open house was held in
May 2004 to encourage public input on the final plan. In August 2004, the City was awarded
an Opportunity Grant from the Livable Communities Demonstration Account to develop design
guidelines for the downtown area to assist in implementation of the downtown plan.
Page 2 of 23
The Influence of Transportation Improvements
A major influence on the plan is the County's re-alignment and improvement of County Road
8. The county's plan will widen and reroute the road to the south, connecting to Highway 61 at
approximately 143`d Street.
The County Road 8 re-
alignment will have a
significant impact on the
downtown, offering
61
opportunities for growth,
improved vehicle and
pedestrian access around
the downtown area, and $
the potential for ..
redevelopment to make
improvements to the core
of the downtown CBD and
surrounding public and
civic spaces. It is vital that 8
the CBD not be cut off from
County Road 8 and from
the high volume of traffic .
which will use this route to
access the interstate.
Highway 61 is planned to continue to run north = 4 Y
and south through downtown and the CBD.
Despite projections of increased traffic volumes,
this highway should not be widened beyond four
lanes except to provide for turn movements.
f ,ro5�
Instead, improvements to the roadway and
access improvements can help accommodate the tq `
increased volumes. "
�x.
The downtown plan ?
recommends
improvements to
improve street
access and
connectivity within '
downtown, as well as
tyw.e Re.a ugrwr.nn G
enhancements to w �ryN
pedestrian access
and walkability.
The plan also calls for extending the regional trail south across County Road 8 on the existing
railroad bed and allows for the possibility of future commuter transit within this corridor (either
in the railroad ROW or on Highway 61). If Hugo is to continue to have a healthy downtown, it
is important to plan for these future transportation changes.
Page 3 of 23
s
61
y
8
Defining Downtown
The downtown CBD in Hugo has always been located on Forest Boulevard (Highway 61)on
both sides of the main traffic signal at 145th Street. But over time, the commercial area has
grown and extended north and south along Highway 61, and the new development has been
less compact and more auto-or highway-oriented than the older, more traditional downtown
CBD. Without planning controls, this same pattern of commercial development could be
expected to occur along the improved and upgraded County Road 8.
While the core downtown central business district(CBD) is focused along Forest Boulevard-
Highway 61 from County Road 8 to 147th Street, the Downtown Plan extends north to the Post
Office and 1501h Street, south to 140th Street, and from the shores of Egg Lake on the east to
the bend in County Road 8 at the old LaValle farm to the west.
One of Hugo's planning goals is to maintain a more compact and concentrated downtown
CBD. This goal will be achieved by encouraging new development in and around the core of
the downtown area, while planning for limited but well-ordered commercial development in
specific areas along other commercial routes such as Highway 61 and County Road 8.
Community feedback has consistently supported new CBD uses which complement downtown
(such as restaurants and entertainment) and suggest that larger, single-use development and
auto sales/service businesses, for instance, be located in commercial areas planned closer to
1-35.
Page 4 of 23
Hurq<;r:+astrtr>t,�i Frar��?�a%)rk Fear,
To create a sense of arrival in downtown, the plan recommends placing gateway elements —a
landscaped sign, monument, or other feature— at these key entry points into downtown.
While the plan doesn't specify the elements at each location, when you enter downtown you
should know that you are downtown. New development at these "gateway" locations should
be planned not only to allow for these gateway elements but to convey the sense of quality
and character that the downtown plan envisions.
.` Gateway elements—signs,flags or
monuments—should be included in
the new downtown area to
welcome a resident or visitor into
an established and thriving
downtown. Elements depicting the
quality and character of downtown
a Hugo are displayed based on the
historical and current architectural
rte.. elements of Hugo.
ESTABLISHED IM
Wiwi
Proposed monument sign, Nov.29,2004
RSP Architects for Contractor Property Development Company
The Downtown Plan
The plan is a tool to help the City of Hugo create a pedestrian-friendly downtown and
concentrates new development and redevelopment around the existing intersection of 1451H
Street and Highway 61. As Hugo continues to develop, the actual projects built may differ
from the Illustrative Downtown Plan in the details of the development of any specific block or
site, but the primary elements of the plan, including the public infrastructure (roads, parks,
trails, open space) and the quality and character which makes this plan unique to Hugo are
expected to be maintained.
Page 5 of 23
Hugo Dr rn,vn Framework;Plar,
The Downtown Plan
Improved park with future
community center } j
rJL
%City park with trails,gazebo,
Traditional dock,pedestrian bridge
residential blocks 11 "
Shared public parking
Carpenters on the Lake
New mixed-use _ "' :
development with J
housing,offices and ,B
complementary 4
retail/commercial uses
3
a -,walkable community spaces
along trail ROW
New mixed-use I ��
development blending *' dditional downtown
office and multi-family r for housing
housing uses
r,
gghf
Proposed trail connections
h
J
t..�rt �• �ema� aeea� -` ;es.+N.r-.. _--
Lan w _ Hugo Downtown Framework (North
Page 6 of 23
Design Guidelines
The intent of the Hugo Downtown Design Guidelines is to provide a baseline for quality in
order to revitalize and expand the downtown business district. These guidelines are written to
meet the community's goals:
Goal 1: Preserve the rural small town character of Hugo
Goal 2: Establish a threshold or baseline for design and quality
Goal 3: Maintain a harmonious visual environment within the existing architectural context
Goal 4: Communicate the community's high expectations for new development in Hugo
Obiectives
The specific objectives for downtown Hugo design guidelines are:
• To establish a clear definition of urban design standards that informs property owners,
developers, builders and decision-makers.
• To serve as a tool that planners and designers can use and incorporate into their plans
to achieve and support the City's design objectives.
• To act as a basis for a uniform and consistent review of development and
redevelopment proposals by the City Council and Planning Commission.
The design guidelines which apply specifically to the CBD also include principles that can be
broadly applied to the entire Hugo Downtown Area.
Downtown CBD
The Design Guidelines apply
specifically to the central business
district or"Old Downtown" concentrated
around Highway 61, from 147th Street to
the new County Road 8 intersection.
The guidelines provide more detailed
definitions of requirements for site
planning, placement of building mass,
materials, architecture, lighting,
signage, and design of the public realm. e
61
s
Page 7 of 23
,`r,al Man,&,D sign t;luideknes
Framework Principles for Downtown Hugo
1. Preserve and celebrate Hugo's small
I {,, town character.
2. Enhance the public realm, to maintain a
ry pedestrian-oriented downtown.
3. Expand civic space and uses around
City Hall.
4. Add new retail which complements
' existing businesses and shops and
supports downtown neighborhoods.
4
_ I
t. 5. Encourage unique small businesses to
locate downtown and larger, single-use
developments closer to the 1-35 corridor.
6. Provide life-cycle housing to encourage
senior-living in the downtown area.
7. Provide recreational uses for diverse
age groups in the downtown area.
8. Improve downtown access and
circulation with improvements to
Highway 61 and downtown intersections
(147th, 145th, County Road 8).
9. Reduce the impact of development close
to Egg Lake to improve lake quality and
preserve wildlife habitat.
10. Build upon unique assets such as the
church, feed mill and City Hall with
complementary design and materials.
Page 8 of 23
Downtown District Design Guidelines
General Design Standards
• These design guidelines are intended to apply to the Downtown District CBD, but include
principles that can be broadly applied to the greater Hugo Downtown Area (as indicated
on the Downtown Plan), including the Central Business, Future Central Business and
Central Residential zones If the CBD development extends beyond this boundary, the
Downtown District boundaries may need to be extended accordingly.
• On all streets in the downtown district, the guidelines are intended to apply to street
frontage properties on both sides of the street.
• New downtown development shall provide for pedestrian as well as vehicular circulation
and shall create linkages to existing and proposed sidewalks and trails.
• All new development should be sensitive to existing downtown neighborhoods and
residences in the design and location of new uses and buildings with respect to shading,
views, light or noise pollution; where necessary appropriate screening or buffering shall
be provided.
• All new development shall be designed to value, respect, and preserve identified natural
features and resources.
• A sense of City history should be
encouraged, and landmarks such as St. YF
John's Cemetery and St. John's Church
should be preserved as important
contributors to Hugo's character.
• Key points which have been identified as
primary entrances to downtown Hugo H
should be designed as"gateways"to the
City; gateway elements could include
open space, unique landscaping, walls or
gates, water features and City identity signage.
These points include:
• From the west—the bend in the County Road 8 at the western edge of Hugo;
• From the east—At Egg Lake and the intersections where 147th and 140th meet
Highway 61;
• From the south —Where 140th meets Highway 61;
• From the north—Where 147th meets Highway 61.
• Along the west side of Highway 61, new downtown development will need to be designed
to integrate with the railway corridor as it comes through the center of town: as a public
open space, supporting the proposed trails, and considering future uses.
Page 9 of 23
General Land Use
• Downtown development should be appropriate for a traditional downtown area: mixed-
use buildings combining retail, commercial, and residential uses, and encouragement of
multi-story buildings in the downtown.
• Neighborhood retail, service, and commercial buildings and uses which support
downtown residential neighborhoods such as drug stores, banks, and specialty markets
or small grocers are encouraged.
• Destination retail, restaurant and entertainment uses, particularly mixed with compatible,
complementary, or other synergistic uses, are highly encouraged.
• New auto-dominated commercial development such as fast food, auto service, or similar
high traffic drive-through facilities and large, single-use developments are discouraged in
the downtown CBD.
• Uses appropriate to the downtown area such as banks, coffee shops and pharmacies
which enhance their business by providing drive-through services may be permitted
provided they are designed to minimize impact on local downtown traffic circulation and
pedestrian access.
• Parking lots should only be allowed as an accessory use, except for municipal or public
district parking; larger parking areas should be broken up into smaller areas to reduce the
overall area of paving and promote a friendlier pedestrian environment.
• New residential development should provide for the full range of life-cycle housing,
offering choices of housing types (single-level flats, condominiums or lofts, single-level
and multi-story townhouses, and single-family attached or detached), styles and prices, at
a density appropriate to the downtown area.
• New residential development should be sensitive to existing residential neighborhoods
and incorporate well-designed transitions from multi-family to existing single-family
residential areas.
• Traditional neighborhood design (TND) based on a traditional street grid is a desirable
option for downtown, medium-density areas. Single-family homes (detached or attached)
or row townhomes should line the street with front porches and stoops, front yards,
sidewalks and boulevards with regularly spaced trees and street lights.
I Garage access at rear of house
rh . TND example with traditional street grid and
porches facing the street
Sidewalks and boulevards on both sides of the
street with regularly spaced street trees
Page 10 of 23
• All downtown residential developments should be planned and designed to minimize
paving for driveways and surface parking. Garage-forward or"snout-house" homes or
townhomes are highly discouraged.
Highly Discouraged:
Example of Garage-forward
design,dominating view
from sidewalk and street.
Streets, Public Space &Amenities
• Forest Boulevard (Highway 61)and 1451h Street should be restored to be closer to their
original, traditional downtown "Main Street"form, lined with street trees and planters,
pedestrian street lights, and street furniture including benches and trash receptacles. The
fixtures that are selected for these streets should be required continuously within the
downtown CBD district and highly encouraged throughout the downtown commercial area
for visual continuity.
• Downtown intersections should be designed to be safe for pedestrians; enhancements to
safety include use of textured-colored paving or striping to mark crosswalks, narrowed or
throated intersections, pedestrian-oriented street lighting, planted center medians or
landscaped boulevards, and warning signage at busy crossings along Highway 61, such
as 147th, 145th and County Road 8.
Change in paving or striping marks the
8a safe crossing zone for pedestrians at
d t8 A major crosswalks.
o ¢ d
'" qs
d Planted center medians or landscaped
. €` boulevards provide resting points for
,u pedestrians at major crosswalks,facilitate
turning movements, and help calm traffic
speeds.
Page 11 of 23
r
,e
To be safe for both pedestrians
and vehicles,downtown Hugo
should include street
improvements: narrowed
intersections,pedestrian lighting
(top left),planted medians(top
right and bottom left),and visible
signs warning of pedestrian
crossings/vehicular speed
decrease(top right).
• The City street grid is a vital part of the way the downtown functions, so restoring streets
or adding new streets that connect to the existing street grid are encouraged;
disconnected streets and cul-de-sacs are highly discouraged.
• Forest Boulevard (Highway 61)and 145th Street are the original "Main Streets"of
downtown and, to an extent, the few remaining brick buildings along these streets should
be preserved, renovated, or restored to productive use; new buildings close to these older
structures warrant careful attention to design and detailing in order to relate well to the
original structures.
• The small park which is planned on Highway 61 across from City Hall is intended to act
as a Town Square or Village Green—a community focal point with passive uses (green
space, gardens, historical markers)and active uses (a gazebo, lake overlook, Farmers
Market) incorporated into the design. Civic and mixed-use buildings should be located
adjacent to the Town Square or Village Green, welcoming visitors to downtown Hugo.
• The plan proposes a future pedestrian bridge over Highway 61, connecting the park and
Egg Lake to City Hall and the bulk of the downtown area. This bridge, if well-designed,
could also act as a visual cue to drivers to reduce speed and could create a sense of
arrival and welcome for the downtown CBD.
Page 12 of 23
Hugo Dos lit; 9n f ';gin
The edge along the railroad ROW and the Hardwood Creek Regional Trail along the west side
of Highway 61 should be maintained as an open-space corridor connecting City Hall and the
CBD to new development to the south. This edge should include:
• trail connections for bicycles and winter sports
uses
• landscaping to act as a year-round buffer;
• pedestrian-oriented trail and street lighting;
• places to rest with benches, planters and trash
receptacles.
APR—
• On downtown streets where retail and commercial uses are proposed, on-street parking
is encouraged; streets should be designed with the parking lane designated either by
curbing or with a change in paving materials.
• Downtown district streets should allow for public right-of-way between the curb and the
building wall, a minimum 10'-12' wide. This area should be "zoned" to provide for street
signs, landscaping and street trees, and both street and sidewalk lighting closest to the
curb. There should be a clear pedestrian walking path in the center, and then an area
designated for seating or other street furniture (trash receptacles, bus benches, etc) and
commercial opportunities
(including newspaper boxes).
Where necessary, such as ,
where the street ROW does not
allow for a wider sidewalk,
these amenities may need to be
accommodated within the
parcel boundaries. .,: ,; ..
r
Page 13 of 23
Huge Ccw !:r�r, rarn._r;:t k PianFinai Pian&C nsiun Guidelines
Minimum ROW
from curb to building
(10'-12')
�' �` % ,✓' G i� ice' .-i ',,
2'-3' Shop related f v
furniture&amenities -
5'-6'Walking Area
3' Public Area: - —- --- — - —
trash receptacles,
newspaper stands, Defined 8' parallel
lanearking
streetlights, signs p -- -
&street trees planted
where sidewalk widens 1 �_ ;•
c
u
T �
f•y another option is a
t .'. defined 20' head-in
angled parking zone
ti
4� 'v
Page 14 of 23
HuyO k -st.wvn s.neev>t P lea i Fina)i 1--in&De.iqn Guideime5
Architecture
• Architecture of new buildings should be respectful of the existing historical structures which
enhance the character of Hugo; design which reflects the elements of vernacular"Main
Street", Hugo's French trading post roots, or mid-western "prairie style" architecture is
encouraged:
Well defined roof line
O
Cornice or roof —� tr------C -- ---�
line
distinguishes
15s story from /q 1S`story with glazed
2"d story ' display windows
c o F F E >= M A )z E T
Building base
expressed with
masonry
Awnings with accent
lighting and graphics Entry feature;well distinguished and covered
instead of applied signs from the weather
Y � b
Early trading post and mill buildings in rural
Minnesota were often made of stone with a simple
gabled roof and expressed chimney.
Page 15 of 23
Traditional Main Street style building:
flat roofs, often an extended or false parapet
on"front"side or marking the main entrance.
✓i H HLJIILI
9i fi
-- Prairie Style:
roofs are hipped, low and spreading with
Al �, � deep overhangs and eaves; Hugo City Hall
has many of these elements.
Pstissicr� _BOULANGER
BE Hugo was once a French trading
post,and many residents have
- -"01 expressed a desire to reflect those
roots in the architecture of the
rnal
downtown. Appropriate
architectural elements include:
steeper or mansard roofs with
a' dormer windows, open storefronts
® with awnings, and exterior plaster,
stone and brick.
Page 16 of 23
Hugo Downt-own Fra! ev k. =Ia , Finsi Pian,s Design Guidelmes
• Architecture of new buildings should be built
upon Hugo's existing assets such as the
church, the feed mill, and the new City Hall, r '
with complementary design and sense of
scale.
• Buildings should be designed to relate well to the existing natural and man-made
environment and stay within context in massing, materials, style and color; design of the
landscape and hardscape should be coordinated and harmonious with the building design
and materials.
• Buildings should be constructed and maintained for permanence and longevity; therefore
durable, maintainable materials (brick, stone, etc.) should be used; temporary buildings,
metal sheds, etc. shall not be permitted.
New"Main Street"buildings
should complement an
established downtown through
their architectural character.
t
rrl�I,
Building entries should be visible from the street, well lit, covered or protected from
weather, and include significant glazing and glass doors where the public will be entering
buildings.
Page 17 of 23
• Awnings, overhangs and arcades are encouraged where pedestrians are expected to
walk and shop ; flat awnings are preferred (no barrel awnings)with adequate clearance
above sidewalk.
• Building design elements should include an expression of a building base (of brick or
stone), a middle, and a top with cornice elements at the top of the first floor and the top of
the building.
• Buildings should be designed with "four-sided architecture", using the same quality
materials on all sides:
• all facades shall be articulated with a variety of materials, glazing, awnings, or other
details to add visual interest;
• roof lines and cornice details shall be completed in a three-dimensional manner so
that the features on the back of the roof or similar unfinished areas are not visible;
• the front fagade may have a unique design or more significant glazing.
• Buildings should be oriented to the street with fully articulated street facades based on
traditional storefronts (doors and display windows) along the sidewalk.
• Zero Lot Line commercial buildings are allowed and highly encouraged on all streets
within the downtown district.
• Along CR 8 and Hwy 61, entrances may be oriented to a side or rear parking lot, as long
as the entry also has good pedestrian access and visibility from the street, and any
building wall along these streets must contain significant amounts of"real' windows.
• Equipment, mechanical systems, transformers, trash enclosures, etc. must be screened
from view in a way that is integral to the architecture of the building with similar materials:
• metal fencing or a mechanical vent screen alone is not sufficient;
• access to these service areas needs to be provided at the alley, side or rear of the
building.
Rooftop equipment shall be screened
from the line of site of pedestrians and
_ integrated into the design and massing
of the roof form
Page 18 of 23
Parking & Service Areas
• Within the downtown CBD, shared parking is encouraged to take advantage of varying
parking demands between mixed uses.
• Businesses are encouraged to establish or participate in a municipal parking district
providing shared, public parking with reductions in required on-site parking.
• Parking should not be located between a building and the street or main road the
building faces and be distributed around the building, especially to the side and back of
buildings.
• Parking adjacent to the street should be minimized;
• Where a parking lot is located along a street, the same zero-lot-line or setback
conditions of the adjacent buildings should be maintained with a wall, ornamental
fence, or similar landscape elements to continue the built edge along the street.
• Where a parking lot is located along a street, it should be well landscaped and
screened with a combination of fencing or wall plantings along the street edge.
6'zone between parking and
sidewalk with fence or wall
centered in zone
/
� O f�
j Landscaped edge combines fence
-. with trees, low shrubs and ground
cover for parking lot screening and
buffering along the street
Page 19 of 23
^.a!Plan 8 D(7sign Gui e ine:3
Larger parking areas (over 25 vehicles)should be planned with internal landscaping,
pedestrian sidewalks or walkways and be divided into smaller areas where possible:
■ pedestrian walkways provided in larger parking lots should be landscaped, include
path lighting, and provide direct access for pedestrians to an entrance of a
commercial building;
■ walkways should be raised, paved areas or defined paths distinguished by striping
or a change in paving provided that pedestrians are kept safe from vehicular travel
on the route to an entrance of a commercial building.
O
Pedestrian walkways through
busy parking lots are
important because they
provide a safe,well lit,direct
access to the entrance of a
building. Larger parking lots
should have pedestrian
' walkways that are clearly
-: identified and combined with
~' landscaping to break up
large areas of pavement(top
illustration and bottom
photo).
Page 20 of 23
F U�tLiUI il(YN;?Y c 1N; Final nal Play 8 Elf frig ,G;Jldeltnes
• Buildings should be oriented to minimize views of service areas and loading docks
from the street; service areas should be buffered with a combination of landscaping
and screening; mechanical equipment and trash areas must be fully enclosed and
integrated into the architecture using the same materials as the building:
• metal fencing or a mechanical vent screen alone is not sufficient;
• access to these service areas needs to be provided at the alley, side or rear of the
building.
• Residential buildings (single-family homes and multi-family buildings)should be
oriented to minimize views of garages and parking areas from the street:
• free-standing or detached garages should not be allowed for multi-family
residences.
• parking should be located below buildings or underground where possible.
!Y
4 zc
a a
ov
Below-grade parking:side or rear
access. Garages should not be as
invisible from the street as possible to
create a traditional neighborhood feel.
Page 21 of 23
HII U(- D�-A f 111."' fJF �P '-t?AI h'1d C
Signage
• Downtown signage is critical to the character of the area, especially at night; all downtown
signage is subject to careful review with the City and must comply with all zoning and
ordinance requirements for size, placement, materials, etc;
• Signage and graphics should be integral to the building architecture or used as a
decorative design element. Back-lit, box signs are not acceptable downtown.
• Decorative neon, moving or other decorative sign types are desirable only when
displayed within storefront window interiors of downtown buildings.
• Corporate chains are encouraged to customize their architecture to express their design
"brand" within a design, context, and material appropriate to the character of downtown
Hugo.
Awning sign should be located on the
awning face or fringe
Awning Signs. --o0
Projecting orlL_j� LI 11 IEEE
Hanging tt— U
Sign
fMF"" D
Projuting or Hanging Signs. IrLLEK
tLJ uJ �
Wall Sign
integrated
into the
building
design
Binding Fare b Mndaw Signs,
Page 22 of 23
Open Space and Storm Water Management
• New development should provide both private and public usable open space, plazas
etc; these spaces should be connected to existing or proposed trail and sidewalk
networks.
• The downtown area is plmust plan cohesively for storm water management and for
improving the water quality of Hugo, however, where possible rain gardens or similar
infiltration and holding areas should be integrated into the design of parking areas;
design which harmonizes more groomed and landscaped areas with more natural
landscape is encouraged:
DP I(�� b
Trail or sidewalk
Swales planted as a rain garden;plants
and soil provide filtration
• Storm water ponds, rain gardens and other storm water management or holding areas
shall be designed to be attractive in both flooded and dry conditions; use of native
plants for filtration around pond and wetlands and other sustainable design approaches
to site and landscape design are encouraged:
+'t1
11 t t1� .4 0_ More formal
►! t Trail or and groomed
Sidewalk landscape
Filtration
Egg Lake Vegetation
Page 23 of 23
I am A� I WWII
so= Ago=
XMWW= Q City of Hugo ffisolm
�JO 2007 City Focus Goals
Target Date
Description.of Goal for Completion
1. Focus on Economic Development
a) Continued membership and active involvement in the HBA a)
b) Develop marketing and promotional strategy for Hugo and
the EDA, utilizing continued visits with existing businesses b)
in the City of Hugo
c) Promotion and establishment of TIF district c)
d) Begin master-planning Northern Gateway d)
• Industrial Park
• Infrastructure demand assessment
2. Transportation Planning
a) Traffic Signals a)
b) CSAH 14/1-35 Interchange b)
c) Street Reconstruction Implementation c)
3. Public Safety Goals
a) Review police protection services a)
b) Cooperative Agreement for BLS Ambulance Service b)
c) Fire Marshall Safety Report c)
4: > Multiple Parks Projects
a) Finalize Oak Shore Park Plan; prepare for 2008 a)
construction
b) Form Implementation Committee for Rice Lake Park b)
Soccer Complex
c) Ongoing evaluation of opportunities for parkland acquisition c)
(I.e., Ball field Complex)
d) Ongoing recreational programming d)
5. Comprehensive Plan Update
a) Update City Transportation Plan a)
b) Update Parks Master Plan b)
c) Update City Utilities c)
6. Rice Lake Management Plan
7 Recodification of City Code
a) Rural Preservation Ordinance a)
b) Nuisance Ordinance b)
c) Sign Ordinance c)
d) Board of Zoning d)
8. Historical Commission Projects
a) Regional Host for Historical Commissions a)
b) Continue verbal and written collection of history b)
c) Hugo Good Neighbor Days Display c)
EDA Goals For 2007
1. Hugo Business Association involvement as an active partner
2. Develop marketing and promotional strategy for Hugo and the EDA
' Create a list of businesses in Hugo
' Develop retention and attraction goals
3. Continue performing site visits with existing businesses in the City
4. Establish a Tax Increment Financing (TIF) District
■ Create TIF policy
■ Create TIF application
■ Continue working on downtown redevelopment
5. Identify a location for another industrial park
■ Northern gateway
' Future development in northern Hugo