HomeMy WebLinkAbout2017.08.22 CC Minutes - Midyear Budget Workshop MINUTES FOR THE HUGO CITY COUNCIL
MID-YEAR BUDGET REVIEW WORKSHOP
MONDAY,AUGUST 22, 2017
Mayor Weidt called the meeting to order at 3:30 p.m.
PRESENT: Haas, Klein, Miron, Petryk, Weidt
ABSENT: None
STAFF PRESENT: City Administrator Bryan Bear, Finance Director Ron Otkin, Accounting
Clerk Anna Wobse, and City Clerk Michele Lindau
2018 Budget Presentation
Finance Director Ron Otkin began by stating that the surplus of$329,109 from 2016 will allow
the City to do some things that were talked about last year but did not make it into the budget,
specifically the replacement of the fire hall roof, a space needs study, and the start of a building
maintenance fund. Ron talked about the on-going practice of contingency funding. Market
values have increased by 10.1%, and Washington Count estimates the City's tax capacity will
increase 11.7%. Ron acknowledged that the Council would like no increase in the urban tax rate,
and the Finance Department would like to see a balanced budget with no structural deficit.
He explained the Debt Service Levy for 2018 is $624,936. By 2020, the City will have
additional levy capacity for road projects, but for now, the CIP Levy will remain at $539,637.
He recommended reinstating the stormwater levy to pay for water reuse projects and future pond
maintenance. He also covered the levies for parks and sealcoating. He explained that the levy for
firefighter's relief will be banked as their funding schedules do not require a mandatory
contribution from the City next year.
Ron reviewed the general fund budget, which contains a 2% cost of living adjustment and step
increases totaling $47,929. Also, salary market data showed the City's utility billing clerk
should be moved to a higher paygrade. He recommend the position be increased from pay grade
four to five. Also budgeted was an hourly $.50 per year increase for firefighters who are between
five and ten years of service, as part of the fire chief s retention program. Health insurance has
increased by 6% due to age of employees and cost of health care, but there will be no changes in
the employees' deductibles. Law enforcement will increase in 2018 due to a full year of having
an investigator. This position was added midyear in 2017. With these increases equaling 2.36%,
the General Operating Budget would be $5,329,296. Finance Director Otkin proposed an overall
tax levy of$6,589,302 for 2018, resulting in a balance budget and no change in the urban tax
rate.
Hugo City Council Meeting Minutes for August 22,2017
Midyear Budget Review
Page 2 of 2
Discussion on Street CIP and Seal Coating Program- Public Works Director Scott
Anderson
Public Works Director Scott Anderson shared the list of projects completed over the past eight
years. Scott talked about the sealcoat program and the positive results they have experienced
until lately, possibly related to industry-wide changes to the type of rock or oil being used.
Benefits do not outweigh the negative and he recommended putting the sealcoat project on hold
and allocating the money to a mill and overlay program. The mill and overlay program would
run parallel to the CIP, but would change the cost estimates of some of the projects in the CIP.
Council talked about issues related to seal coating versus the mill and overlay on streets. Scott
stated that streets will be considered on a case by case basis.
Council agreed to move forward with exploring the Oneka Lake Boulevard and Henna Avenue
project.
Discussion on Replacement of 1991 Peterbilt Pumper Truck-Fire Chief Kevin Colvard
Fire Chief Kevin Colvard talked about the replacement of the 1991 engine, their oldest piece of
equipment. In 2013 a formal equipment replacement document was created and it was
determined they needed to replace diesel apparatuses on a 30 year cycle. The 1991 Peterbilt
engine truck should be replaced in 2021 and they would like to replace it with an aerial apparatus
to meet the growing and changing needs of the community. He reviewed the benefits and
shortcomings of purchasing a replacement pumper/tanker versus the aerial apparatus option.
Chief Colvard felt the aerial apparatus would better meet the future needs of the community.
The aerial apparatus is multi-purpose with five major functions for use, and would greatly assist
with taller and larger buildings and would allow for earlier response times, but shortcomings
were the price tag and need for additional training. If the department had their own aerial
apparatus, it would also reduce reliance on mutual aid departments. To procure an aerial, it
would take 2-3 years and cost approximately $1,400,000.
The Council discussed with Colvard the number and types of calls, proximity to hydrants versus
the larger capacity of water in a new engine truck, and the benefit of a ladder truck for rescue and
for suppressing a fire from above. Council asked that staff look at developing a plan to pursue
an aerial apparatus to replace the 1991 Fire Engine by 2021
Council also asked questions on the benefit of the $.50 step increase as a retention factor.
Colvard replied that it is working but probably not a deciding factor in retaining firefighters.
Removing the ambulance duties and dedicating more time for community events has brought
more interest in being a member of the department.
Hugo City Council Meeting Minutes for August 22,2017
Midyear Budget Review
Page 2 of 2
Direction to Staff
It was the Council's consensus to direct staff to prepare a preliminary tax levy resolution for
2018 that does not raise the urban tax rate. The Council also directed staff to continue with the
budget process as presented and provide guidance on how to fund the purchase of an aerial fire
truck.
Adiournment
Klein made motion, Miron seconded, to adjourn at 5:15 p.m.
All Ayes. Motion carried.
Respectfully Submitted,
Michele Lindau
City Clerk