Loading...
HomeMy WebLinkAbout2011.11.14 EDA Packet AGENDA CITY OF HUGO ECONOMIC DEVELOPMENT AUTHORITY MONDAY, NOVEMBER 14, 2011 8:30 AM 8:30 am 1. Call to Order 8:31 am 2. Roll Call 8:32 am 3. Approval of Minutes EDA Meeting of October 10, 2011 8:35 am 4. HealthEast Clinic Expansion • Dr. Joe Moriarity 9:00 am 5. Discussion on Development Fee Analysis 9:45 am 6. Update and Discussion on City Identity Workshop December 15, 2011 at 7 PM 10:00 am 7. Update on Boot Camp for Entrepreneurs 10:15 am 8. Update on Downtown Redevelopment 10:30 am 9. Adjournment BACKGROUND MEMO FOR THE EDA MEETING OF MONDAY, NOVEMBER 14, 2011 3. APPROVAL OF MINUTES Staff recommends approval of the minutes from the October 10, 2011, EDA Meeting as presented. 4. HEALTHEAST CLINIC EXPANSION Dr. Joe Moriarity will be present at the meeting to talk about the HealthEast expansion in Hugo. 5. DISCUSSION ON DEVELOPMENT FEE ANALYSIS At its October meeting, the EDA directed staff to put together a development scenario for a restaurant in downtown Hugo. The analysis includes city fees in regards to development in Hugo and surrounding cities. Staff has included a spreadsheet that outlines the fees for each city. 6. UPDATE AND DISCUSSION ON CITY IDENTITY WORKSHOP DECEMBER 15,2011 AT 7 PM The identity workshop has been set by the Planning Commission for Thursday, December 15, 2011. Staff recommends that the EDA discuss how they will participate and contribute to the workshop. Staff will also provide a preview of the ideas for the workshop. 7. UPDATE ON BOOT CAMP FOR ENTREPRENEURS Staff will update the EDA on the Boot Camp for Entrepreneurs that was held on October 18, 2011. Commissioner Graff will present the benefits and other topic ideas for the boot camp. 8. UPDATE ON DOWNTOWN REDEVELOPMENT Staff will update the EDA on the progress MINUTES FOR THE EDA MEETING OF OCTOBER 10,2011 Miron called the meeting to order at 8:35 am. PRESENT: Arcand, Bever, Denaway, Graff, Puleo, and Miron ABSENT: Klein STAFF: Mike Ericson, City Administrator Bryan Bear, Community Development Director Rachel Juba, Planner APPROVAL OF MINUTES FOR THE EDA MEETING OF SEPTEMBER 12, 2011 Arcand made motion, Denaway seconded, to approve minutes for the EDA meeting of September 12, 2011. All aye. Motion carried. UPDATE ON THE MARKETING CAMPAIGN Staff has started to compile information for the multimedia marketing campaign. The next steps are to showcase the information in an interesting way on the City's website. Staff is working with Gov Office, which hosts the website, to make updates to the website. Staff enclosed the strategic plan for the marketing campaign for the EDA's review. Rachel Juba, Planner, gave background on the strategic plan. Miron stated that he would like to see quality and unique restaurants in downtown Hugo. Bryan Bear, Community Development Director, asked if the City should target major chains or the private local restaurateur. Miron stated that the local restaurateurs may be more inclined to locate in the downtown. Arcand stated that we need something unique in downtown to attract other businesses. Miron agreed and stated that the downtown needs a project to spark development which may include significant assistance from the City. Bever talked about attracting projects that are geared towards kids. Graff stated that the goal for downtown should be a restaurant to spark development. He stated that it's a matter of effort and getting prospects to the City. Puleo agreed it's a great spot for a restaurant. Miron talked about a community center in downtown, it is shown on the downtown master plan. Miron stated there are several in other cities. Denaway stated that the cities are lucky to cover operating costs. Mike Ericson, City Administrator, stated that we thought of that as the new City Hall was built in 2004. The City decided to include a community room and donate one million dollars to Oneka Elementary School for an extra large gymnasium. Puleo stated that he does not think the City is ready for the community center,but maybe there is a way to partner with the development team with the purchase agreement for the City owned property. Bryan Bear, Community Development Director, stated that there have been meetings for the planning of Lions Park and there was a visual preference survey. No one mentioned having a community center, and a covered skating rink was desired. Denaway stated that we should also target professional serves, such as lawyers, medical, offices. Puleo stated that the downtown needs exposure. Graff stated that residents could be surveyed to see what they would like to see in downtown. Denaway stated it's also a matter of creating spaces several users can go into. Miron stated that we may have all the information on the services that people get out of town. Miron, Denaway, and Graff stated we need to compile of the information in the strategic plan and showcase Hugo. Denaway made a motion, seconded by Graff, for staff to do an analysis on a hypothetical development that includes a restaurant. This will show the EDA how much the development would cost in Hugo and in the surrounding cities. All aye. Motion carried. UPDATE ON GREATER MINNEAPOLIS/ST. PAUL ECONOMIC DEVELOPMENT PARTNERSHIP Staff attended the Greater MSP meeting on September 29, 2011. Bryan Bear, Community Development Director, attended the second meeting. He stated that our City marketing outline is not a lot different from Greater MSP. Their goal is to get contact information from cities and provide them with prospects. The focus has been on manufacturing and industrial businesses and they are doing regional marketing to get leads. Hugo is part of the group that is being responsive to Greater MSP. UPDATE ON DOWNTOWN REDEVELOPMENT Staff updated the EDA on the progress of downtown redevelopment. The LCDA Grant for Pete Sampair's property in downtown has moved to the second step of evaluation. The bids for the demolition of the Ricci's building should be in next week. There will be a sheriff's sale on the Carpenters and Antique Store properties on October 21, 2011. They will have six months to redeem the property. Anyone has an opportunity to bid on the property. Graff and Denaway stated that the City should not bid on the property. Bryan Bear, Community Development Director, stated that the one thing the City may lose if the full access onto and from Highway 61. UPDATE ON BOOT CAMP FOR ENTREPRENEURS Staff updated the EDA on the Boot Camp for Entrepreneurs on October 18, 2011. Miron made a motion, seconded by Graff, to post the boot camp as an EDA meeting. All aye. Motion carried. CITY WIDE BUS TOUR—OCTOBER 15,2011 The 6th Annual City Wide Bus Tour is on Saturday, October 15, 2011, at 10 am. EDA members were encouraged to attend. UPDATE ON MEETING DATE CHANGE FOR THE EDA/PLANNING COMMISSION CITY IDENTITY WORKSHOP—NOVEMBER 17, 2011 AT 7 PM There is a conflict with the previous meeting date of November 11, 2011. The I-35 W/E coalition is meeting that night. The Planning Commission rescheduled the date to November 17, 2011. Several members of the EDA were not able to make the November 17, 2011, date and asked for it to be rescheduled to December 81h or 15th. Staff will check with the Planning Commission and find out what date works best for them. ADJOURNMENT Denaway made a motion, seconded by Bever, to adjourn at 10:38 am. All aye. Motion carried. Restaurant Pad Ready Redevelopment Site 9,000 Square Feet-30 SAC Units- 1.5 Acre Parcel 1.1 Million Dollar Project Hugo Lino Lakes White Bear Lake Forest Lake Woodbury Cottage Grove Oakdale Stillwater Application Fees (fee +escrow ) Preliminary Plat $2,220 $5,000 $450 $1,000 $5,530 $15,400 $1,050 $3,100 Final Plat $2,220 $2,500 $0 $500 $5,530 $200 $1,050 $500 Site Plan $1,350 $1,500 $0 $1,000 $5,500 $5,300 $950 $500 Development Fees Stormwater Trunk Fee $4,573.80 $12,675.96 N/A N/A $21,502.00 $13,366 N/A N/A Park Dedication N/A $3,262.50 $5,250 $3,000 $3,200 $3,600 $4,419 $3,600 Sanitary Sewer Trunk Fee * $0 �4� N/A N/A $6,675 $10,478 $2,785 N/A $20,250 Water Trunk Fee * $0 N/A N/A $4,500 $4,350 $4,380 N/A Included in sewer fee Buidling Permit Fees SAC(sewer availablity charge) $17,640 $85,200 $15,000 $39,390 $9,450 $1,977 $16,500 $2,230 WAC(water availablity charge) $20,400 $112,800 $15,000 $36,000 $22,500 $3,573 $16,500 $30,000 REC(Met Council Charge) $70,950 $70,950 $70,950 $70,950 $70,950 $70,950 $70,950 $70,950 Plan Check Fee $4,124 $3,850.44 $3,850.44 $4,131.89 $4,624.95 $4,124 $4,124 $3,850.44 Permit Fee $6,345.25 $5,923.75 $5,923.75 $6,356.75 $7,115.30 $6,345.25 $6,345.25 $5,923.75 Total 1 $129,823.46 $303,662.65 $116,424.19 $173,503.64 $170,730.25 $132,000.66 $121,888.66 $140,904.19 * Redevelopment Properties in Hugo are not required to pay sanitary sewer trunk charges LESSONS LEARNED Mike Graff Commissioner Economic Development Authority City of Hugo Boot Camp for Entrepreneurs Advantages L Identifies new small business start ups 2. Identifies successful small business units that are looking to improve 3 . Generates income for the Hugo facility that hosts the Boot Camp Boot Camp for Entrepreneurs 4. Generates referrals for the guest speakers 5 . Positions the City of Hugo as business friendly place to locate a new business 6. Provides a foundation for building a business community network 7. Helps people succeed in a tough economy 8 . Differentiates the City of Hugo from other municipalities Boot Camp for Entrepreneurs • Ideas for next Boot Camp • 1 . Teach how to take an idea to increase business, convert the idea into a tailored direct mail piece that targets a small important target audience. • 2 . Teach how to back up the direct mail piece with a web supported follow up strategy. Boot Camp for Entrepreneurs 3 . Teach how to drive prospects to your web site and take out all the mystique that is a part of web experts confusing approach. • 4. Teach how to leverage this training so that Boot Camp attendees can implement this strategy for less than $ 150 within 30 days and get new business. Boot Camp for Entrepreneurs Wild Wings of Oneka,Hugo,Minnesota October 18, 2011 Agenda 8:00 a.m. Welcome and Introductions By Rachel Juba, Planner, City of Hugo 8:10 a.m. Vision,goals,focus and action By Liz Peterson, CPC - the Coach and Mentor Group, Cedar, Minnesota 8:40 a.m. Accounting for Entrepreneurs By Greg Kneisl, CPA, and Owner, Kneisl Associates, Forest Lake, Minnesota 1. Various methods of organizing a business (L.L.C., L. L. P. and "S" corporation) 2. Tax types, (Schedule C, 1065, and 1120's) 3. Advantages and disadvantages 4. Methods of accounting S. Costs to incorporate and tax returns 6. Compensation methods 7. Key financial documents required for running a business 9:30 a.m. Networking session # 1 1. Use the 3 by 5 cards provided and list two questions that you are concerned about and ask someone in the audience if they can help you 9:50 a.m. Finance for the entrepreneur By Bryan Rogers,Vice President Lake Area Bank, Hugo, Minnesota 1 1. How to develop a business relationship with a financial institution 2. How to set up a line of credit for your new business 3. Documentation you will need - two or three years of financial data, tax returns, an overview of your personal wealth 4. The Guarantee -what it is and why it is important and how it could impact your financial situation 5. Tools and resources: a. Automated Clearing House - demo b. Premier Banking- electronic transfer funds for payroll, accounts payable c. The VIP Teller- demo 10:30 a.m. The Legal Issues You Must Consider as an Entrepreneur By Steve Rose,Attorney, Mansfield, Tanick and Cohen, Minneapolis, Minnesota 1. Documents that should be read carefully 2. The legal impact of your decision on business organization 3. Why you need to tell customers what you will do and the importance of doing what you say. 4. When to meet with an attorney Marketing for the Entrepreneur 11:00 a.m. By Gretchen Boyd, Owner, Boyd's Promos 1. Referral marketing- the critical success factor for the new entrepreneur 2. How to leverage our local newspapers with cost effective advertising and professional public relations 3. Brand Awareness 11:40 a.m. By Brian Nosie, Owner, Emerging Business Systems, Forest Lake, Minnesota 1. How to leverage your work on traditional marketing on the Internet 2 2. The importance of a well planned out web strategy Resources Available to the Entrepreneur 12:30 a.m. (working lunch) By Rachel Juba, Planner, City of Hugo 1. A comprehensive "take home" piece that details all the free resources available to the entrepreneur. Rachel compiled this extensive resource document for the City of Hugo. 12:45 p.m. Professional consulting available from SCORE for the Life of Your Business By Jim Emanuelson, Mentor and Membership Chair 1. Introduction to SCORE -what we can do for the entrepreneur 2. The importance of a business plan - SCORE can help you build a business plan for your business 3. Mentoring- receive free and confidential individual help from an experienced business person 4. Training- seminars,workshops and events on current business topics to help you grow your business 1:30 p.m. The Newest Small Business in Hugo- What I have Learned about going out on my own By Patrick Flanagan,Attorney, Flanagan Law Office - Hugo, Minnesota 2:00 p.m. Quick Books demonstration By Nicole Williams, Kneisl &Associates, Ltd. Certified Public Accountants 2:30 p.m. Final networking opportunity By Shannon Sneep, Styl'n by the Lake 3 W" CITYOF Woo Ury 8301 Valley Creek Road•Woodbury, Minnesota 55125-3330•www.ci.woodbury.mmus 651/714-3543 9 TDD 651/714-3568• FAX 651/714-3501 COMMERCIAL BUILDING PERMIT FEES The following information(subject to change)has been prepared to provide a general guide to estimate permit fees. A combination permit system is used in Woodbury. The permit includes Building Permit,Plan Check,Plumbing,Fire Sprinkler, HVAC,Electric,Surcharge,S.A.C.,Sewer and Water Area and Connection,and Escrow fees for the project except grading fee. 1. BUILDING PERMIT FEE: Based on the total value of all work. Value includes,but is not limited to: Finish work,painting, roofing,electrical,plumbing,mechanical systems,structure,design,profit,and all other costs related to the project. PERMIT FEE VALUE OF WORK $ 84.75 FOR FIRST $ 2,000 + $16.60 EACH ADDITIONAL $1,000 $ 466.55 FOR FIRST $ 25,000 + $12.15 EACH ADDITIONAL $1,000 $ 770.30 FOR FIRST $ 50,000 + $ 8.50 EACH ADDITIONAL $1,000 $1,195.30 FOR FIRST $ 100,000 + $ 6.80 EACH ADDITIONAL $1,000 $3,915.30 FOR FIRST $ 500,000 + $ 5.60 EACH ADDITIONAL $1,000 �J $6,715.30 FOR FIRST $1,000,000 + $ 4.55 EACH ADDITIONAL $1,000 2. PLAN CHECK FEE: 65%of the Building Permit Fee. (This is in addition to the permit fee) Ji 3. PLUMBING PERMIT: 1.5%of Value or$ 75 minimum b 4. SEWER AND WATER: 1.5%of Value or$ 75 minimum 5. STORM SEWER: 1.5%of Value or$ 75 minimum 6. AUTOMATIC FIRE EXTINGUISHER: 2%of Value or$100 minimum 7. FIRE ALARM SYSTEMS: 2%of Value or$100 minimum 8. FIRE SERVICE FEES: Permit Value x.003 ALL OCCUPANCIES EXCEPT:U,R-3 AND R-2-12 UNITS OR LESS: 9. HVAC PERMIT: 1.5%of Value or$ 75 minimum 10. ELECTRICAL PERMIT: Commercial Electrical fee schedule is available on line,or upon request IL STATE SURCHARGE: Valuation of Structure Addition or Alteration Surcharge Commutation $1,000,000 or less .0005 X Value $1,000,000 to $2,000,000 $500 + .0004 X (Value-$1,000,000) $2,000,000 to $3,000,000 $900 + .0003 X (Value-$2,000,000) $3,000,000 to $4,000,000 $1200 + .0002 X (Value-$3,000,000) $4,000,000 to $5,000,000 $1400 + .0001 X (Value-$4,000,000) Greater than $5,000,000 $1500 + .00005 X (Value-$5,000,000) 12. S.A.C.(Sewer Availability Charge): Each SAC Unit=$2,100 The number of units is assigned by Metropolitan Council Environmental Services. Call the Metropolitan Council Environmental Services at(651)602-1378 for SAC unit assignment. 13. SEWER AND WATER CHARGES: 'TVVt'(G The Woodbury Engineering Department assigns Sewer and Water Area and Connection charges. Contactagmeenng Department at(651)714-3593 for these fees. 0 f -�--5 �14. GRADING PERMITS are required except for small jobs. Contact the Engineering Depart dt(651) 93 for grading information and fees. 15. ESCROW: $3000 each building. Escrow Administration fee$100 each building. J:\WP\Web\Comm]Bldg Permit Fees-Rev Feb 2010.doc City Fees For Amendment History See Last Page LICENSES/PERMITS 2011 FEES CITY CODE CITATION AMENDED BY Adult Entertainment-Principal Uses $51000.00 plus Investigation fee of$2,060.00 in-state;up to$10,300.00 11-5-4-C out-state Alarm User-Commercial $100.00 per calendar year(initial license prorated quarterly) 3-7-3-C RES 03-154 ORD 850 Amusement-Games of Skill,Jukebox,Child's Game $15.00 per device,table 3-14-A-1 Amusement-Bowling Alley,Billiard Games,Skating Rink, $50.00 per device,table,screen 3-14-A-1 RES 03-154 Theater,Golf Course Amusement-Juke Box $15.00 per device 3-1-4-A-1 Amusement-Child's Device $15.00 per device 3-14-A-1 Building Contractor $50.00 3-9-5 Burning Permit-Commercial $50.00 4-6-1-C-B Home Occupation $60.00 11-9-A-3-3 RES 02-238 Mixed Solid Waste/Recycling Collector/Hauler 4-2-6-D RES 03-154 Residential$550.00 per calendar year(initial license prorated quarterly) ORD 850 Commercial$350.00 per calendar year(initial license prorated quarterly) ORD 850 Cigarette/Tobacco $250.00 per calendar year(initial license prorated quarterly) 3-6-6 ORD 850 Fireworks License Retail Seller(Principal)$350.00 3-11-6 RES O4-018 Retail Seller(Accessory)$100.00 Gambling Permit and State Licensing Exemptions $100.00 3-2-8 Gambling Premises Permits and Bingo Halls $100.00 Investigation Fee 3-2-8 Gambling/Contribution Fund 10 percent of net profits 3-2-9-E On Sale Intoxicating Liquor $9,500.00 per calendar year(initial license prorated monthly) 3-3-6-A; RES 03-157 3-3-6-C-1-A ORD 850 On Sale Sunday Intoxicating Liquor $200.00 per calendar year(initial license prorated quarterly) 3-3-6-A; ORD 850 3-3-6-C-1-A On Sale Wine Intoxicating Liquor $2,000.00 per calendar year(initial license prorated quarterly) 3-3-6-A; ORD 850 3-3-6-C-1-A On Sale Club Intoxicating Liquor: Based on Membership: 3-3-6-A; ORD 850 3-3-6-C-1-A Under 200 $300.00 per calendar year(initial license prorated quarterly) 201-500 $500.00 per calendar year(initial license prorated quarterly) 501-1,000 $650.00 per calendar year(initial license prorated quarterly) 1,001-2,000 $800.00 per calendar year(initial license prorated quarterly) 2,0014,000 $1,000.00 per calendar year(initial license prorated quarterly) 4,001-6,000 $2,000.00 per calendar year(initial license prorated quarterly) Over 6,000 $3,000.00 per calendar year(initial license prorated quarterly) On Sale Temporary Intoxicating Liquor $50.00 per day for each location 3-3-3-F Off Sale Intoxicating Liquor $200.00 per calendar year(initial license prorated quarterly) 3-3-6-A; ORD 850 3-3-6-C-1-A On Sale 3.2 Beer $600.00 per calendar year(initial license prorated quarterly) 3-3-6-A; RES 03-157 3-3-6-C-1-A ORD 850 On Sale Club 3.2 Beer $100.00 per calendar year(initial license prorated quarterly) 3-3-6-A; ORD 850 3-3-6-C-1-A On Sale Temporary 3.2 Beer $50.00/Day for each location 3-3-6-A Off Sale 3.2 Beer $200.00 per calendar year(initial license prorated quarterly) 3-3-6-A; RES 03-157 3-3-6-C-1-A ORD 850 Consumption&Display Permit $300.00 per calendar year(initial license prorated quarterly) 3-3-3-G-1 RES 03-220 ORD 850 Investigation Fees-Intoxicating Liquor 3-3-8-A All Applicant Types $500.00 RES 03-154 Foreign Corporation Actual Cost Additional Investigation $200.00 Investigation Fees-On/Off Sale 3.2 Beer $250.00(except Temporary Licenses) 3-3-8-B RES 03-154 Pesticide Applicators $150.00 4-5-3-C RES 03-154 PeddlerNendor $100.00 3-4-5-A;3-4-5-C RES 03-154 Temporary Sales $100.00 3-4-2-B RES 04-223 Rental Dwelling-Single $50.00 9-7-8-F RES 02-238 Rental Dwelling-Twin $100.00 9-7-8-F RES 02-238 Rental Dwelling-Multiple $60.00 per building plus$5.00 per unit 9-7-8-F RES 02-238 Massage Business $200.00 per calendar year plus(initial license prorated quarterly)$50.00 3-8-2-C ORD 850 investigation fee/year(2 hr max). Additional investigation fee of$25.00 per hour charged for investigations exceeding 2 hours. $500.00 maximum Massage Therapist $100.00 per calendar year(initial license prorated quarterly)plus 3-8-3-B ORD 850 $100.00 initial investigation fee Special Event Permit $100.00 5-5-4-C ORD 846 Pawnbroker $1,000.00 per calendar year(initial license prorated quarterly)plus 3-5-2-C;3-5-3-A ORD 850 $530.00 investigation fee Secondhand Goods Dealer or $1,000.00 per calendar year(initial license prorated quarterly)plus 3-5-2-C;3-5-3-A ORD 850 Multiple Secondhand Goods Dealer $530.00 investigation fee Tattoo/Body Piercing City Maps--Urban or Rural $5.00 each RES 04-223 Copies-24"x 36" $2.00 Transparencies $0.25 per copy Copies $0.25 per copy Copy of City Council Minutes $50.00 annual charge Copy of City Code(2 Volumes) $300.00 per set RES 04-223 City Code Supplement Service $50.00 per year RES 03-154 Special Meeting Fee $500.00 Notary Fee $1.00 per document Assessment search $20.00 Election filing fee $5.00 Non Sufficient Fund Charge $20.00 Facility Use-Room Rentals $25.00 per hour RES 03-276 Facility Use-Parking Lots $25.00 per day RES 04-043 CITATION AMENDED BY Accessory Apartments $150.00 new; 11-9A-3-1-B-1; 11-9A-3-1-B-3 $50.00(biennial renewal) Conditional Use Permit $400.00 plus$4,000 escrow 11-2-11 ORD 828 Street Re-Naming $200.00 Public ROW&Easement Vacations $300.00 Interim Conditional Use Permit $300.00 annually Comprehensive Plan Amendment(map or text) $600.00 10-1-2 Minor Subdivision 1$300.00 plus$2,000 escrow Preliminary Plat 10-2-3-B-1 ORD 828 $400.00 plus$15,000 escrow Final Plat $200.00 10-2-5-B Street Sealcoating—New Subdivison $1.00 per square yard ORD 886 Site Plan $300.00+$5,000 deposit 11-2-4-A ORD 828 Variance(Pre-Construction) $200.00 11-2-7-A Variance(Post-Construction) $800.00 Zoning Amendment(text or map) $600.00 11-1-6 Environmental Assessment Worksheet(EAW) $600.00 plus actual costs 11-2-5-B Zoning Appeals $200.00 11-2-6 Financial guarantee,escrow for subdivision improvements Public improvements–150%of estimated cost. Boulevard, 10-3-4-C landscaping improvements-150%of estimated cost Lot grading compliance escrow $1,000.00 per lot 10-C-1(e) Mining-Permit Removal per occurrence Under 100,000 tons$250.00. Over 100,000 tons$500.00 3-10-6-A Mining-Annual Inspection and Review $2,000.00 Park Dedication Fees: 10-4-3C ORD 772 Residential—Land Dedication Minimum of 10%of the total gross area within development Residential--Cash in Lieu of Land Dedication$4,200.00 per unit ORD 828 (Collected at Final Plat Commercial/industrial 10%of undeveloped land or 4%cash based on fair market value of land Subdivision Ordinance $15.00 per paper copy/$10 Digital format RES 03-276 Agricultural Preservation Documentation Processing $50.00 Zoning Ordinance $30.00 per paper copy/$10 Digital Format Sign Ordinance $15.00 per paper copy/$10 Digitial Format RES 03-276 Structural Maintenance Ordinance $15.00 per paper copy/$10 Digitial Format RES 03-276 Comprehensive Plan $45.00 per paper copy/$10 Digitial Format Re-addressing $100.00 Pick-Up of Illegal Signs $5.00 per Sign RES 03-077 Residential Area Charges: Water Works West Draw Area 1 82: $3,127.00 per acre ORD 886 East Ravine Neighborhood 1:$2,922.00 ORD 886 Remainder of City$2,311.00 per acre ORD 886 Sanitary Sewer West Draw Area 1: $1,645.00 per acre ORD 886 West Draw Area 2:$2,729.00 per acre ORD 886 ORD 886 East Ravine Neighborhood 1:$6,763.00 Remainder of City$1,314.00 per acre ORD 886 Single Family:$3,938.00 ORD 886 Storm Water Facilities-East Ravine Neighborhood 1 Multiple Family:$4,660.00 ORD 886 Single Family:$6,618.00 per acre ORD 886 Estate:$4,966.00 per acre ORD 886 Stormwater Facilities-West Draw Medium Density:$8,275.00 per acre ORD 886 High Density:$9,926.00 per acre ORD 886 Ag Developed:$7,111.00 per acre ORD 886 Single Family:$6,683.00 per acre ORD 886 Stormwater Facilities-SW Drainage Area Multi-Family:$8,751.00 per acre ORD 886 Single Family:$6,097.00 per acre ORD 886 Estate:$4,443.00 per acre ORD 886 Storm Water Facilities-Remainder of City Medium Density:$7,432.00 per acre ORD 886 High Density:$8,911.00 per acre ORD 886 Ag Developed:$6,380.00 per acre ORD 886 Commercial/Industrial Area Charges: Waterworks$2,920.00 per acre ORD 886 Sanitary Sewer$1,857.00 per acre ORD 886 Storm Water Facilities Remainder of City: $8,911.00 per acre f n i VA ORD 886 West Draw: $9,926.00 per acre V ORD 886 Residential Sewer/Water Connection Fees Water Works Remainder of City$939.00 per unit ORD 886 West Draw: $1,243.00 per unit ORD 886 Sanitary Sewer Remainder of City: $311.00 per unit ORD 886 West Draw:$376.00 per unit ORD 886 Commercial/Industrial Water Connection Fees: Water Works:$2,382.00 per'let ORD 886 Sanitary Sewer$1,318.00 per7, A G ORD 886 Off-Site Stormwater Ponding Fee Reference BRAA report ORD 769 Metropolitan Council SAC Charge: 2,100.00 per unit for applicable 2010 permits 8-1-2;8-1-14; ORD 850 9-3-4.0 Sealcoating—Trails $2.50 per square yard ORD 850 Park and Open Space Identification Markers $115.00 per marker East Ravine AUAR Charge $116.00 per acre ORD 828 ADMINISTRATIVE FEES 2011 FEES CITY CODE CITATION AMENDED BY Tall Weeds Abatement Actual Cost plus $50.00 for first violation in 24-months $100.00 for second violation in 24-months commencing with first violation $200.00 for third and subsequent violations in 24-months commencing with first violation Engineering Administration 4.0% RES 03-058 Administration-Projects 2.0% Finance-Projects 3.0% Finance Charge on Accounts Receivable Aged Greater than 1.5%per month or$1.00 Minimum RES 04-223 30 Days Hourly Rate for Engineering&Staff Time Actual cost Tax-Exempt Revenue Bond financing 1%of the first$10 million in requested financing,with 1/2 of the 1%fee being char ed on the remainin issue. BUILDING/CONSTRUCTION PERMITS CITY CODE CITATION AMENDED BY Building Permit Fee Table(All new residential&commercial 30.00 minimum Unless specified herein construction,finishing,alterations,remodeling,additions,and swimming pools greater than 18 inches deep) Project Valuation Base Fee(+)per each,or increments thereof 500-2,000$25.00+$3.25 per 100.00 2,001-25,000$73.50+$14.75 per 1,000.00 25,001-50,000$415.75+$10.75 per 1,000.00 50,001-100,000$682.50+$7.50 per 1,000.00 100,001-500,000$1,053.50+$6.00 per 1,000.00 500,001-1,000,000$3,427.75+$5.00 per 1,000.00 Greater than 1,000,001 $5,945.25+$4.00 per 1,000.00 State Surcharge applicable to Building Permits Project Valuation Base+Factor 1,000,000 or less$0.00+.0005 x valuation 1,000,001-2,000,000$500+.0004 x valuation-$1,000,000 2,000,001-3,000,000$900+.0003 x valuation-$2,000,000 3,000,001-4,000,000$1,200+.0002 x valuation-$3,000,000 4,000,001-5,000,000$1,400+.0001 x valuation-$4,000,000 Greater than 5,000,001 $1,500+.00005 x valuation-$5,000,000 Building inspection card replacement $30.00 Plan Review Fee or Plan Revisions when required $20.00 minimum;65%max.of Building Permit Fee Grading Asbuilt Survey Certification $30.00 Grading/Excavation Permit Fee Table Cubic Yards Base+additional fee 0-50$23.50 51-100$37.00 101-1,000$37.00+$17.50 per ea.100 add'I cubic yds 1,001-10,000$194.40+$14.50 per ea.1,000 add'I cubic yds 10,001-100,000$325.00+$66.00 per ea.10,000 add'I cubic yds 100,001 or more$919.00+$36.50 per ea.10,000 add'I cubic yds Grading/Excavation Plan Review Fee Table Cubic Yards Base+additional fee 50$0.00 51-100$23.50 101-1,000$37.00 1,001-10,000$49.25 10,001-100,000$49.25+$24.50 per ea.10,000 add'I cubic yards 100,001-200,000$269.75+$13.25 per ea.10,000 add'I cubic yards 200,001 or more$402.25+$7,25 per ea.10,000 add'I cubic yards Site Grading Inspection Fee$60.00 Decks $60.00 Driveways/parking areas-Residential $30.00 7-2-3-e-2-13 Driveways/parking areas-Commercial plus surcharge-$300.00 minimum Electrical Permits: 0 to 400 Amp Power Source $35.00/source 17RD 892 401 to 800 Amp Power Source $60.00/source ORD 892 Over 800 Amp Power Source $100.00/source ORD 892 0 to 200 Amp Circuit or Feeder $6.00/feeder or circuit ORD 892 Over 200 Amp Circuit Feeder $15.00/feeder or circuit ORD 892 New One-or Two-Family Dwelling(up to 30 circuits and $100.00/dwelling unit ORD 892 New One-or Two-Family Dwelling(additional circuits over 30 $6.00/feeder or circuit ORD 892 Existing One-or Two-Family Dwelling(where 15 or more $100.00/dwelling unit ORD 892 Existing One-or Two-Family Dwelling(where less than 15 $6.00/feeder or circuit ORD 892 Reconnected Existing Circuit or Feeder(for panelboard $2.00/feeder or circuit ORD 892 Separate bonding inspection $35.00/inspection ORD 892 Inspection of concrete-encased grounding electrode $35.00/inspection ORD 892 Technology circuits and circuits less than 50 volts $.75/device or apparatus ORD 892 Additional inspection trip(s) $35.00/inspection trip ORD 892 Street,parking,and outdoor lighting standards $5.50/standard ORD 892 Traffic signals $5.50 each ORD 892 Transformers for light,heat,and power(0 to 10 KVA) $16.50 each ORD 892 Transformers for light,heat,and power(more than 10 KVA) $33.00 each ORD 892 Transformers for electronic power supplies,signs,and $5.50 each ORD 892 State Surcharge $5.00 ORD 892 Total inspection fee is the fee calculated using the above fee schedule or$35.00 multiplied by the number of required inspection trips ORD 892 plus the fees for feeders,circuits,devices,apparatus,standards,transformers,or signals,whichever is greater. Inspections outside normal business hours $100.00 minimum RES 03-276 Reinspection fee $47.50 max.per site/project visit RES 03-276 Inspections for which no fee is specifically indicated $47.50 per hour.Minimum 1-hour fee RES 03-276 Siding $90.00 Pool/Spa,Above Ground $50.00 Pool/Spa,Hot Tob $30.00 Pool/Spa,Inground $90.00 Inground Pool Demolition $50.00 ORD 850 Roofing-Residential $50.00 Roofing-Commercial Building Permit Fee Table 7-2-3-B-2-A Utility/storage sheds under 160 sf $30.00 Utility/storage sheds over 160 sf Building Permit Fee Table Signs-Pylon $75.00 Signs-Wall Mount $50.00 Signs-Temporary $50.00 Wrecking,moving,demolition $100.00 7-2-2 Investigative Fee ORD 850 Charge up to,but not exceeding permit fee Building Permit Renewal Fee 1/2 of the original permit fee 180 days from issuance date or 180 days from last inspection date. ECHANICAUPLUMBING PERMIT 2011 FEES CITY CODE CITATION AMENDED BY Residential Air Conditioner$30.00 Air Exchanger/Cleaner$30.00 Ductwork/Sheetmetal$30.00 Gas Piping$30.00 Heating System$30.00 HVAC-New Home$80.00 Plumbing Lawn Sprinkler$25.00 Plumbing New Home$60.00 1st bath;$30.00 ea add'[bath/rough-in Plumbing Remodel$30.00 Sewer Line Installation$40.00 Warm air/Air conditioner$45.00 Water heater$15.00 Water Line Installation$40.00 Water Softener$15.00 Commercial Fire Suppression/Protection 1%of contract price;$100.00 minimum ORD 850 Mechanical 1%of contract price;$50.00 minimum Plumbing-Domestic 1%of contract price;$50.00 minimum Plumbing-Irrigation 1%of contract price;$50.00 minimum Sewer Line$150.00 Water Line$150.00 UTILITIES 2011 FEES CITY CODE CITATION AMENDED BY Water reconnection or turn-on fee(outside Water $85.00 per occurrence;$170.00 on holidays 8-1-2-C;8-1-8.0&E RES 05-20-4 Department regular working hours) Water&Sewer restoration fee $5.00 plus 6%interest per annum 8-1-2 Accuracy test of water meter(requested by water user) 8-1-3-G ORD 850 outsource meter accuracy certification $150.00 Water usage rates: 8-1-7-A Base Charge per Month$1.50 per month ORD 828 Usage up to 15,000 gallons$1,30 per 1,000 gallons ORD 850 Usage from 15,001 to 30,000 gallons$1.90 per 1,000 gallons ORD 850 Usage over 30,000 gallons$2.15 per 1,000 gallons ORD 850 Sewer usage rates: 8-1-7 Residential Base Charge$1,65 per month ORD 850 Residential Usage 0 to 30,000 gallons$3.00 per 1,000 gallons ORD 850 Residential over 30,000 gallons$3.60 per 1,000 gallons ORD 850 Commercial Base Charge$1.65 per month ORD 850 Commercial up to 30,000 gallons$3.00 per 1,000 gallons ORD 850 Commercial over 30,000 gallons$3.60 per 1,000 gallons ORD 850 Stormwater Utility Fees: Single Family Home$4.00 per residential unit per month ORD 828/842 Townhomes$2.00 per residential unit per month ORD 828/842 Apartments$1.01 per residential unit per month ORD 828/842 1.5+acre Residential$3.00 per residential unit per month ORD 828/842 Commercial/Industrial$16.00 per impervious surface acre per month ORD 828/842 Schools$16.00 per impervious surface acre per month ORD 828/842 Churches$16.00 per impervious surface acre per month ORD 828/842 Golf Courses$8.04 per acre per year ORD 828/842 Mining$8.04 per acre per year ORD 828/842 Cemeteries$8.04 per acre per year ORD 828/842 Agricultural land w/Structure$48.00 per parcel w/structure per year ORD 828/842 Utility account turnoff fee $75.00 ORD 856 Utility account transfer fee $25.00 Water Meters (fee plus sales tax) 8-1-8-A RES 04-223 5/8"remote$272.25 3/4"remote$297.02 1-Inch$337.57 1%,Inch$509.40 1Y Inch Turbo$801.90 2-Inch$637.90 2-Inch Turbo$904.90 2-Inch Compound$1,650.40 3-Inch Turbo$1,104.21 3-Inch Compound$2,020.21 4-Inch Turbo$2,157.32 4-Inch Compound$3,165.32 6-Inch Compound$5,475.54 Water Meter-Radio Transmitter Radio read device-$136.10 Fire Hydrant Hookup Permit $50.00 3/4"Adapter Permit$50.00 3/4" -Adapter Rental Fee$5.00 per day 3/4"Adapter -Consumption Charge$1.30 per 1,000 gallons consumption RES 03-058 3/4" -Adapter Deposit$250.00 2'/:"Hydrant Water Meter-Permit Fee$50.00 2V Hydrant Water Meter-Rental Fee$5.00 per day 2%"Meter-Consumption Charge$1.30 per 1,000 gallons consumption RES 03-058 21/2"Hydrant Water Meter-Meter Deposit$650.00 STREET LIGHTING 2011 FEES City-owned Residential $2.45 per month per lot Res 99-206 ORD 828 City-owned Commercial $1.05 per front foot per year Res 99- ORD 828 Xcel owned $5.15 per month Res 99- ORD 828 City-owned residential maintenance surcharge $.85 per month IRes 99- ORD 828 Rural $3.75 per year Residential Pole $624.00 each ORD 886 Residential Luminaire $697.00 each ORD 886 Commercial Pole&Luminaire $4,600.00 each ORD 886 Decorative Commercial Pole $1,130.00 Luminaire and$1.117.00 Pole ORD 850 CITY"HT-OF-WAYS 2011 FEES CITY CODE CITATION AMENDED BY Curb Cuts $50.00 ORD 850 Load limit permit $50.00 each trip ORD 850 Right-of-Way Registration Fee $100.00 annually 7-6-12-A ORD 850 Right-of-Way Excavation Permit Fee:Hole $200.00 7.6-12-B ORD 850 Right-of-Way Excavation Permit Fee:Trench $70.00/100 Lineal Feet+Hole Fee($200.00) 7-6-12-B ORD 886 Right-of-Way Obstruction Permit Fee $200.00+$0.20/1-ineal Foot of obstruction 7-6-12-C ORD 886 Right-of-Way Permit Extension Fee $75.00 7-6-12-A ORD 850 Right-of-Way Delay Penalty Fee $75.00(up to 3 days)+$15.00/day(after 3 days) 7-6-12-A ORD 850 Right-of-Way sidewalk,apron,other $200.00 ORD 850 PUBLIC SAFETY NONNI' ATION AMENDED BY Animal Control Division: 5-4-4-A-2-A Dog/Cat Licenses 1 Calendar Year-Non-Spayed/Non-Neutered ORD 802 $20.00 renewal or 1st quarter initial license;$15.00 2nd quarter initial ORD 850 license;$10.00 3rd quarter initial license;$5.00 4th quarter initial license 2 Calendar Years-Non-Spayed/Non-Neutered ORD 802 $35.00 renewal or 1st quarter initial license;$30.00 2nd quarter initial ORD 850 license;$25.00 3rd quarter initial license;$20.00 4th quarter initial license 3 Calendar Years-Non-Spayed/Non-Neutered ORD 802 $50.00 renewal or 1st quarter initial license;$45.00 2nd quarter initial ORD 850 license;$40.00 3rd quarter initial license;$35.00 4th quarter initial license 1 Calendar Year-Spayed/Neutered ORD 802 $15.00 renewal or 1st quarter initial license;$11.25 2nd quarter initial ORD 850 license;$7.50 3rd quarter initial license;$3.75 4th quarter initial license 2 Calendar Years-Spayed/Neutered ORD 802 $25.00 renewal or 1st quarter initial license;$21.25 2nd quarter initial ORD 850 license;$17.50 3rd quarter initial license;$15.00 4th quarter initial license 3 Calendar Years-Spayed/Neutered ORD 802 $35.00 renewal or 1 st quarter initial license;$31.25 2nd quarter initial ORD 850 license;$27.50 3rd quarter initial license;$25.00 4th quarter initial license Multiple Animal License$100.00 per calendar year(initial license prorated quarterly) 54.4-D-3 ORD 802 Unlicensed dog/cat license late fee$2.50 per month 544-A-2-B RES 03-276 Duplicate dog/cat license tag$5.00 each 54-4-A-3-C ORD 850 Commercial Kennel license$50.00 per year 54.4-D Dangerous Dog Registration Fee:$85.00 per calendar year(initial registration prorated quarter) 54-4-C RES 03-276 Potentially Dangerous Dog Registration Fee:$45.00 per calendar year(initial registration prorated quarterly) ORD 838 Animal at large pick up fee$45.00 1st pick up,$66.00 2nd pick up,$88.00 3rd pick up,$105.00 all 54-2 RES 03-276 additional offenses within same year City ordered impoundment$52.00 impound fee 5-4-8-B RES 03-276 $10.00 administrative fee Actual fee paid to impound facility for boarding, care and/or disposal of animal Animal running at large violation(citation requested fine)$50.00 RES 03-276 Animal unlicensed(citation requested fine)$50.00 5-4-4-A-1 RES 03-276 Animal computer license records$100.00 RES 02-238 Fire Division: Fire permit 1st permit$20.00 per year,each add'permit$5.00 9-6-2-A-3 RES 02-238 Burning Permit-Commercial$50.00 Fire reports Actual costs RES 02-238 Photographs$5.00 plus actual cost of photo RES 02-238 $3.00 per page disk photos $5.00 per photo scanned Tank installation permit 1%of value;$100.00 minimum ORD 850 Hazardous materials&other charges for service$150.00 per hour per person plus materials. Minimum charge of 4 ORD 850 Lours Day Care facility inspection 1$50.00 RES 02-238 Title III facility inspection$50.00 Police Division: AudioNideo tapes$10.00 audio $25.00 video Blood alcohol test$60.00 RES 04-223 Clearance letters(i.e.adoption,passport,etc.)$20.00 RES 03-276 Daycare checks$20.00 per adult RES 03-276 False alarm fees 0-2 false alarms No charge 3-7- -B-1 RES 03-154 3-4 false alarms$75.00 Each 5-9 false alarms$150.00 Each 10+false alarms$300.00 Each Fingerprinting$30.00 residents,local businesses RES 03-276 $50.00 non-residents Law enforcement services$200.00 per hour,one hour minimum Lockouts(Car Door Unlocking)$50.00 per event RES 03-058 Special response team(outside of Washington County)Per Mutual Aid Agreement RES 02-238 Cottage Grove Impound Lot Rates: Towing Fee Per towing contract ORD 839 Storage Fee$10 per day for first 30 days ORD 839 $30 per month thereafter Administrative Fee$60.00 ORD 839 Towing/storage charge Per towing contract ORD 839 Vehicle impoundment Per towing contract ORD 839 Ambulance Services: Basic life support treatment and transport$1,330.00 ORD 886 Basic life support treatment without transport(Includes 12$200.00 ORD 890 lead,oral or nebulizer medication,02 delivery and blood sugar evaluation) Advanced life support treatment and transport-Tier 1 $1,640.00 ORD 886 Advanced fife support treatment and transport-Tier 2$1,890.00 ORD 886 Advanced life support treatment without transport(Includes$400.00 ORD 890 IV/IM/SQ medication infusion or injection such as an unresponsive diabetic) Mileage charge(per loaded mile from city limits)$24.00 ORD 886 Non-resident Fee$151.00 ORD 886 Vehicle Extrication$400 ORD 850 Basic life support stand-by(EMT&Paramedic)$75.00 per hour Advanced fife support stand-by(EMT&Paramedic)$160.00 per hour Part-time paramedic stand-by$30.00 per hour Cancelled calls,refusal of treatment/transport EMS No charge ORD 890 assessment,vitals,basic bandaging/splinting,ECG 3 lead monitoring,SP02 and CO monitoring PARKS 000000or 2011 FEES CITY CODE CITATION AMENDED BY Facility Use: Park building(per hour)$11.00/hr(resident);$19/hr(non-resident) ORD 886 Pavilion,shelter(per hour)$8.00/hr(resident);$11.00/hr(non-resident) ORD 886 Carnival Games$20/game ORD 850 Field lights$66.00 per night ORD 886 Outdoor courts(2 hr minimum)$5.50/hr(resident)or$8.80/hr(non-resident) ORD 886 Outdoor ballfields(2 hr minimum)$16.50/hr(resident)or$22.00/hr(non-resident) ORD 886 Outdoor rink rental$38.50 per hour resident;$38.50 per hour non-resident ORD 886 Cancellation Fee/Refund of Program Fee If program is cancelled by the City the registration fee is refunded in ORD 850 total.If participant cancels before the starting day the registration fee is refunded less a$5.00 service fee.After the first day of program no refunds will be issued. ICE ARENA 2011 FEES CITY CODE CITATION AMENDED BY North&West Rink Ice Rental Monday-Friday 2 PM-10:00 PM$200.00 plus tax 10:00 PM-2 PM$130.00 plus tax Saturday and Sunday 10 AM-10 PM$200.00 plus tax 10 PM-6 AM$130.00 plus tax ORD 850 South Rink Ice Rental IORD 850 Monday-Friday 2 PM- 9 PM$100.00 plus tax 9 PM-2 PM$90.00 plus tax Saturday and Sunday 6 AM-9 PM$100.00 plus tax 9 PM-6 AM$90.00 plus tax High School Hockey Games Single-admission charged 50/50 split-$1,250.00 minimum per game ORD 850 Varsity or JV games-Boys Double-admission charged 50/50 split-$1,650.00 minimum per game ORD 850 Varsity or JV games-Boys Single-admission charged 50/50 split-$850.00 minimum per game ORD 850 Varsity or JV games-Girls Double-admission charged 50/50 split-$1,250.00 minimum per game ORD 850 Varsity or JV games-Girls Public Skating Punch Card $35.00/10 Admissions ORD 850 Public Skating $4.00 per person ORD 828 Figure skater's practice $4.00 per person($8 on north or west rinks) ORD 886 Meeting Room Rental $15.00 per hour Smartboard Rental $10.00 per use Marquee sign rental $10.00 per day per side North&West Rink Off-Season Ice Time(April 1-Aug 31st) 1-10 hours$145.00 plus tax ORD 886 11-20 hours$135.00 plus tax ORD 886 21-35 hours$125.00 plus tax ORD 886 36-60 hours $120.00 plus tax ORD 886 61 or more $115.00 plus tax ORD 886 GOLF COURSE 2011 FEES CITY CODE CITATION AMENDED BY Patron $70.00 ORD 886 Season Pass Individual$1,175.00 ORD 828 Senior(Weekday)$675.00 ORD 850 Senior(7 Day)$875.00 ORD 850 Junior(Weekday)$350.00 RES 03-276 Couple(7 Day)$1,610.00 ORD 850 Couple(Weekday)$1,075.00 ORD 850 Tee Time Advance Reservation Card $40.00 ORD 850 Facility Rental: Main Banquet Room: Saturdays$695.00 RES 03-276 Ceremony Fee$295.00(indoor)$595.00(outdoor) RES 05-204 Food&Beverage Minimum RES 03-276 River Room$500(Sun-Thurs)$750(Fri)None(Sat) RES 03-276 Oak Room$500(Sun-Thurs)$750(Fri)None(Sat) RES 03-276 Main Banquet Room$1,250(Sun-Thurs)$2,500(Fri)$3,500(Sat) RES 03-276 Porch$500.00(Sun-Fri)N/A(Sat) RES O4-223 Lounge$500.00 RES O4-223 Security Deposit$250.00 RES O4-223 Cottage Grove Patron RES 03-276 9 hole-weekday$17.50 ORD 886 9 hole-weekend$17.50 ORD 886 18 hole-weekday$27.50 ORD 828 18 hole-weekend$30.00 ORD 828 Non-Patron 9 hole-weekday$19.50 RES 05-204 9 hole-weekend$19.50 RES 05-204 18 hole-weekday$30.50 ORD 828 18 hole-weekend$33.00 ORD 828 Juniors(time restrictions) 9 hole-weekday or weekend$10.00 ORD 850 18 hole-weekday or weekend$15.00 ORD 850 Seniors(time restrictions) 9 hole-weekday or weekend$14.00 ORD 850 18 hole-weekday or weekend$19.25 ORD 886 Twi-light Golf(Walking) 1$16.00 ORD 850 Twi-light Golf(Riding) $25.00 ORD 850 Power Cart rental $21.00 9 hole;$31.00 18 hole ORD 828 Seniors non-primetime power cart rental $14.00 9 hole;$21.00 18 hole ORD 828 Shot gun tournament(18 hole only) $71.95/person RES 05-204 Season Driving Range $199.00 ORD 850 Season Half Cart Pass $700.00 RES 03-276 Season Half Cart Pass(senior) $475.00 RES 03-276 Season Trail Fee(limited to 5 avail.Spots per year) $300.00 RES 03-276 Trail Fee $1000 RES 03-276 SPRING CLEAN UP 2011 FEES CITY CODE CITATION AMENDED BY Box Spring or Mattress $10.00 all sizes RES 05-204 Television $.20-$.40 per pound ORD 850 Computers $.20-$.40 per pound ORD 850 Small Appliances Electric $2.00-$10.00 each ORD 850 Water Heater $12.00 each ORD 850 Washer or Dryer $12.00 each ORD 850 Stove $12.00 each ORD 850 Water Softener $12.00 each ORD 850 Freezer $12.00 each ORD 850 Refrigerator $12.00 each ORD 850 Dishwasher $12.00 each ORD 850 Microwave $12.00 each ORD 850 Small Electronics $.20-$.40 per pound ORD 850 Air Conditioner $24.00 each ORD 850 Sofa $10.00 each Chair $5.00 each By Load Car trunk$15.00-$45.00 ORD 850 SUV/Station wagon$20.00-$60.00 ORD 850 Pick-up truck$40.00-$120.00 ORD 850 Tires and Batteries Car lire$3.00 RES 05-204 Truck tire$6.00 ORD 850 Tractor tire$20.00 ORD 850 Car Battery No charge ADMINISTRATIVE OFFENSE PENALTIES 2011 FEES CITY CODE CITATION AMENDED BY Administrative City Licensing Violations $25.00-$200.00 Alarm Violations No current license $50.00 3-7-3-A Alcohol 3-3-18 RES 00-4 Licensee Violations 1 st:$500.00 2nd:$1,000.00 in 24-month period 3rd:$1,500.00 in 24-month period 4th:$2,000.00 in 24-month period 8 1-day suspension 5th:$2,000.00 in 24-month period&5-day suspension 6th:In 24-mo.period:License revocation Consumption by minor-in park$75.00 7-34-G Consumption by minor-in public$75.00 3-3-13-C Possession by minor-in park$75.00 3-3-13-A-4 Possession by minor-in public$75.00 3-3-13-C Animals 5-4-3 RES 03-276 Feces accumulation$35.00 5-4-3-c RES 03-276 Bicycles,Roller Blades,Skateboards Improper use$25.00 5-1-6-C Equipment violations$20.00 6-5-6 Building/Housing Code Violations $100.00 Title 9 Unfenced Swimming Pool$50.00 9-114-C-1 Fire 4-6-1-A Illegal burning$100.00 4-6-B-1 Recreation fire violation$50.00 5-2-1-A Curfew 1$35.00 5-2-1-C Environment Boating/no wake$50.00 7-5-4 Compost pile$25.00 4-3-1-B Firewood storage$35.00 4-1-3-M-1 Watering ban$50.00 8-1-9-B-1 Excessive Noise/Disturbing the Peace Loud parties$50.00 5-1-2-B Boomboxes$20.00 5-1-2-C Noise prohibited$25.00 11-6-17 Garbage Collection violations Commercial$100.00 4-2-6-H Residential$50.00 4-2-6-H Exterior storage$100.00 11-6-2 Dumping of recyclable$50.00 4-2-10-13 Illegal dumping$100.00 4-2-10-B Junk and debris$100.00 4-2-10-A Littering$100.00 4-2-10-C Tall weeds$50.00 4-3-1-B RES 03-137 Hunting Illegal land use$100.00 5-3-6 Without permit$100.00 5-3-6-B-2 Loitering $25.00 5-1-4 Parking 6-2-1 Commercial vehicles$50.00 11-3-9-D-5 Fire hydrant$25.00 6-1-1 Fire lane$25.00 4-6-5-C Handicapped zone$200.00 6-2-2-A Mailbox$15.00 6-2-1-B-2 Stop sign(30 ft)$15.00 6-1-1 Truck parking$25.00 11-3-9-D-5 Winter parking(per season)$35.00-1st Violation 6-2-1-A RES O4-223 $50.00-2nd Violation $75.00-3rd Violation $100.00-4th Violation Other parking$15.00-$200.00 Parks After hours$25.00 7-3-3-A Animal waste$25.00 5-4-3-C Damage to turf$25.00-$200.00 7-3-4-J Dumping of grass clippings$25.00-$100.00 7-4-3-C Fence violations$100.00 7-3.4-H Fire pit$100.00 7-3.4-D-1 Illegal dumping$100.00 7-34-C Play equipment$100.00 7-3-3-N Retaining walls$100.00 7-34-H Unauthorized gardens$100.00 7-3-4-1 Unauthorized plantings$100.00 7-34-P Unlawful storage$100.00 7-3-4-H Vehicle storage$100.00 7-3-4-H Public Nuisance $100.00 4-1-2 Dumping in R-O-W$100.00 4-2-10-C-2 Soliciting violation$35.00 per person 3-4-2 Sign Ordinance Violations $100.00 9-8-17-A Tobacco State Statute Sale to minor Licensee$200.00-First violation 3-6-10-A ORD 785 $400.00-Second violation(wh 24 Mo) 3-6-10-A ORD 785 $600.00-Third&subsequent violations(wh 24 Mo)(license suspension 3-6-10-A ORD 785 for not less than seven days in addition to fine) Seller$75.00 3-6-10-A Underage possession$25.00-First violation 3-6-10-B $50.00-Second violation 3-6-40-B $75.00-Third violation 3-6-10-B $100.00-Fourth violation 3-6-10-B Underage use$25.00-First violation 3-6-10-C $50.00-Second violation 3-6-10-C $75.00-Third violation 3-6-10-C $100.00-Fourth violation Traffic MS 169;6-7-2 Recreational$25.00 Snowmobiles$25.00 14 Motor Inoperable vehicles$50.00 11-6-2 Load limit 6-1-1 Registration$35.00 6-1-1 Seatbelts$50.00 6-1-1 Trespassing $25.00 16-25 Zoning Ordinance Violations $100.00 Title 11 All Other Violations $25.00-$200.00 3-1-2-A Amusement device violation$35.00 SIGN COSTS 2011 FEES CITY CODE CITATION AMENDED BY Stop Sign-30"Visual Impact Perception(VIP) $61.60 plus labor fee&equipment cost ORD 850 Stop Sign-36"Visual Impact Perception(VIP) $81.90 plus labor fee&equipment cost ORD 850 Warning Sign-30"(VIP) $61.81 plus labor fee&equipment cost ORD 850 Warning Sign-36"(VIP) $82.66 plus labor fee&equipment cost ORD 850 Street Name Signs-24"(VIP) $71.11 plus labor fee&equipment cost ORD 850 Street Name Signs-30"(VIP) $75.80 plus labor fee&equipment cost ORD 850 Street Name Signs-36"(VIP) $84.62 plus labor fee&equipment cost ORD 850 Street Name Signs-42" $91.48plus labor fee&equipment cost ORD 850 Galvanized Round Post 10' $21.00 plus labor fee&equipment cost ORD 850 Galvanized Round Post 12 $22.10plus labor fee&equipment cost ORD 850 Heavy Duty cap bracket 12" $15.56 plus labor fee&equipment cost ORD 850 Heavy Duty T bracket 12" $15.56 plus labor fee&equipment cost ORD 850 Street Name Signs 48"VIP $98.33 plus labor fee and equipment ORD 850 6'3#Green channel Post $13.35 plus labor fee and equipment ORD 886 8'2#Green channel Post $12.33 plus labor fee and equipment ORD 886 7'3#Galvanized channel Post $19.35 plus labor fee and equipment ORD 850 Nuts and Bolts(hardware)avg. $6.37 per sign ORD 850 Band-It Hardware avg. $15.69 per sign installed ORD 850 AMENDMENTS This Fee Table was established as an independent document by City Council Resolution No.03-058 on March 19.2003. Reference No. Description Resolution No.03-077 4/16/2003 Bus Bench,Sign Removal,Sealcoating Resolution No.03-154 8/20/2003 Miscellaneous License Fee Increases Resolution No.03-157 820.2003 Liquor License Fee Increases Resolution No.03-220 10/1/2003 Consumption and Display Permit Fee Resolution No.03-276 12/17/2003 2004 General Fee Increases Resolution No.04-018 2/4/2004 Fireworks License Fees Resolution No.04-043 4/7/2004 Park Building,Pavilion Fees;Rec Resolution No.04-059 4/21/2004 Delete Amusement License Investigation Resolution No.04-085 6/2/2004 Hunting Fees Resolution No.04-223 12/15/2004 2005 General Fee Increases Resolution No.05-034 3/16/2005 Stormwater Utility Fee Increases Ordinance No.769 3/16/2005 Utility Area Charges Ordinance No.772 4/20/2005 Residential Park Dedication Fees Resolution No.05-086 6/1/2005 Advanced Life Support Ambulance Treat Resolution No.05-183 10/19/05 Utility Rates Resolution No.05-204 12/21/2005 General 2006 Fee Increases Resolution No.06-008 1/18/2006 Ambulance Service Fee Increases Ordinance No.784 2/15/2006 Adopt City Fee Table by Ordinance Ordinance No.785 2/15/2006 Tobacco Violation Fees Ordinance No.788 03/15/2006 Utility Area Charges Ordinance No.790 04/19/2006 Park Dedication Fee Ordinance No.788 03/15/2006 Utility Area Charges Ordinance No.802 10/4/2006 Animal License Fees Ordinance No.809 12/6/2006 General 2007 Fee Increases Ordinance No.828 10/17/2007 General 2008 Fee Increases Ordinance No.830 10/17/2007 Tattoo/Body Piercing Fees Ordinance No.835 12/19/2007 East Ravine Fees Ordinance No.838 3/19/2008 Potentially Dangerous Dog Registration F Ordinance No.839 4/2/2008 Impound Lot Fees Ordinance No.842 8/13/2008 Lower St.Croix Stormwater Fees Ordinance No.846 9/17/2008 Special Event Permit Fee Ordinance No.850 12/3/2008 General 2009 Fee Increases Ordinance No.856 4/15/2009 Utility Account Turn-Off Fee Ordinance No.862 9/2/2009 Ice Arena Community Room Fees Ordinance No.863 10/7/2009 General 2010 Fee Increases Ordinance No.886 12/1/2010 lGeneral 2011 Fee Increases Ordinance No.890 7/6/2011 jAmbulance No Transport Fees Ordinance No.891 7/6/2011 IfElectrical Permit Fees Ordinance No.892 7/20/2011 IfElectrical Permit Fees CITY OF OAKDALE 1584 Hadley Avenue North Oakdale, MN 55128 651 730-2721 FEE SCHEDULE EFFECTIVE 2011 (Subject to change) PLANNING DEPARTMENT FEES Comprehensive Plan Amendment Application Fee $550/Plus $550 Escrow Final Plat Application Fee $550/Plus *Escrow Interim Conditional Use Permit Application Fee $400/Non-Refundable License Application- Garden/Tent Application Fee $400 Minor Subdivision Application Fee $500/Plus $250 Escrow Planned Unit Development PUD Application Fee $650/Plus `Escrow Preliminary Plat Application Fee $550/Plus *Escrow Release of City Owned Property Application Fee $225/Plus $300 Escrow Rezoning Application Fee $550/Plus $550 Escrow Site Plan Application Fee $400/ Escrow See App. Special Use Permit SUP Application Fee $400/Non-Refundable Used Car Sales Lot License Application Fee $400 Variance - Standard Over 5 ft Application Fee $400/Non-Refundable Variance - Administrative Under 5 ft Application Fee $250/Non-Refundable Vacation of Property Application Fee $400 Zoning Ordinance Amendment Application Fee $525/Plus $525 Escrow FEES TO PURCHASE To Purchase: Zoning Book $80.00 plus $5.70 tax = $85.70 To Purchase: Comprehensive Plan $125.00 plus $8.91 tax = $133.91 To Purchase: City Ordinance $135.00 plus $9.62 tax = $144.62 (obtain from Sue or Peggy) To Purchase: Copies $.26 (no tax) Color Aerial Maps $15.75 (no tax) Address or Zoning Maps $11.25 (tax included) Zoning Letter 1$25.00 *Escrow Deposit is Determined by Acres: 0-10 acre site = $500 Over 10 acre site = $1000 FAX copies: $5.25 first page, $2.10 additional pages; Notary: $1 For further information on the above fees,contact the Planning Department at 651-730-2721. BUILDING DEPARTMENT FEES City Sewer Availability Charge Cit SAC $ 550.00/unit Fire Surcharge $6 Res/$18 Comm. 15% of Permit Fee Residential/Commercial Grade Escrow Single Family $1,000 Garage $500 Commercial $1,500/Acre Park Dedication Fees Cash Dedication Land Dedication Residential: $2,800/unit .0167 ac./unit Commercial: $491/ .0058 ac/ 1,000 1,000 sf Bld sf Bld Permit 2000 IBC based on valuation Sewer Availability Charge SAC $ 2230/ unit Determined by MWCC Street Clean-up $ 30.00 Surcharge .0005 x the Valuation $500/unit Surface Water Management Fund Engineering Calculated per fQrm ula (SWMF) ao 0=I aeu'4:�-t Water Availability Charge WAC $ 550.00/unit For further information on the above fees, contact the Building Department at 651-739-5150 CITY OF STILLWATER BUILDING PERMIT FEES FOR NEW CONSTRUCTION Permit Fee: Based upon valuation (call Building Dept. for approximate fee) Plan Review Fee: 65% of permit fee (call Building Dept. approximate fee) State Surcharge: Based upon valuation (call Building Dept.) Sewer Connection Fee: $100.00 Contractors License Verification: $5 Residential Commercial SAC: $2,230 SAC: $2,230 Sewer Availability Charge) WAC: $1,000 per SAC unit WAC: $1,000 per SAC unit Water Availability Charge) Water Meter Fee: $300 Water Meter Fee: Responsibility of applicant call Water Dept 439-6231 GRADING ESCROW: $1,650 ($1,500 GRADING ESCROW: $5,500 ($5,000 returned returned when final grading plan is when final grading plan is submitted and approved)* submitted and approved) * *See grading plan requirements or call the City's Engineering Department at 651- 430-8830 Inspection Department Office Hours are 7 a.m. - 9 a.m. and 1 p.m. to 2 p.m. When calling for inspections, please call during office hours and call one day in advance (24 hour notice). Give address or permit number, time of requested inspection and type of inspection and a telephone number that you can be contacted at. (We cannot give inspections during our office hours.) Commercial projects call Cindy Shilts, Building Official (651) 430-8827 Residential projects call John Nobles, Building Inspector (651) 430-8826 If you have scheduled an inspection and will not be ready, please call to cancel before the scheduled inspection time. A reinspection fee will be charged for noncancellation of inspections or multiple failures of same inspection. Permits must be pulled and paid for prior to inspections being made. OBTAINING A BUILDING PERMIT DOCUMENTS REQUIRED FOR SUBMITTAL: 1. Two sets of complete construction plans. The annexation area must also submit one set reduced to 11X17 (total of 3 sets). One set will be returned with comments/corrections. 2. Two sets of the proposed grading plan/survey. See grading plan handout for requirements. Include the building setbacks on the grading plan/survey. 3. Annexation area must also submit a copy of the Architectural Review Board approval. 4. Building permit application filled out completely. Any pertinent information that is not filled in will cause application to be rejected. 5. Copy of current Minnesota contractors license,plumbers license, excavator(sewer and water) license, or HVAC license. Excavation and HVAC licenses must be obtained with the City of Stillwater. 6. When the building permit is ready to be picked up, we will contact you. 7. A signature is required on permits, so they must be picked up. We do not mail them out. 8. The building permit and inspection sign off card must be posted on the job site. 9. All construction sites must have the house number clearly marked from the start of construction. This is an emergency vehicle safety requirement. SEPARATE PERMITS ARE REQUIRED FOR MECHANICAL AND PLUMBING. ELECTRICAL PERMITS ARE REQUIRED AND ARE ISSUED BY THE STATE BOARD OF ELECTRICITY DEPARTMENT-651-284-5064. SEWER AND WATER PERMITS ARE TO BE SUBMITTED ON A PLUMBING PERMIT WITH THE MINIMUM FEE OF $50.00 SPECIALTY CONTRACTORS WHO ARE EXEMPT FROM STATE LICENSING REQUIREMENTS MUST OBTAIN A CITY LICENSE. Fill out the appropriate contractor's license application and submit with the fee. QUESTIONS REGARDING ZONING/SETBACKS/FENCE PERMITS/SIGN PERMITS/STORAGE SHEDS/VARIANCE/SPECIAL USE PERMITS CALL: PLANNING DEPARTMENT Bill Turnblad, Community Development Director (651)430-8821 Mike Pogge, Planner (651)430-8822 GRADING/SITE PLANS/HOOK-UP TO CITY SEWER AND WATER CALL: ENGINEERING DEPARTMENT Shawn Sanders, City Engineer (651)430-8835 Torry Kraftson, Asst City Engineer (651)430-8831 Ryan Smith, Engineering Technician (651)430-8833 John Jurek, Engineering Technician (651)-430-8832 H:\mcnamara\sheila\BUILD\building permit fees for new construction.wpd e ORDINANCE NO.988 AN ORDINANCE ESTABLISHING PERMIT FEES TO BE COLLECTED BY THE CITY OF STILLWATER The City Council of the City of Stillwater does ordain: 1. A new Section 33.4 is hereby adopted to hereafter read as follows: PERMIT FEES. The applicant for a permit shall provide an estimated construction value at the time of application,except for fixed fees. Permit valuations shall include total value of all construction work, including materials and labor, for which the permit is being issued, such as gas, mechanical,plumbing equipment, and permanent systems. The building official shall make the final determination of value. Valuation is based on the building valuation data, dated May of 2004 or the most current valuation provided by the ICC via State of Minnesota Building Codes and Standards Division or contract bid price. The building official shall make the final determination. Exceptions: Building permit valuations for the following structures shall be based on the valuation of on-site work only: a. Manufactured homes containing a Housing and Urban Development(HUD) certification label; b. Prefabricated buildings with a Minnesota Building Codes and Standards Division prefabrication label; and c. Industrialized/modular buildings with an Industrialized Building Commission(IBC) label. PLAN REVIEW FEES. When submittal documents are required by the building official,a plan review fee shall be paid. Said plan review fee shall be 65 percent of the building permit fee. The plan review fees are separate fees from the permit fees and are in addition to the permit fees. When submittal documents are incomplete or changed so as to require additional plan review, fees shall be charged at the rate shown in Building Permit Fee Table. Plan review fees for similar plans falling under 1300.0160, subpart 6, shall be 25 percent of the building permit fee. FIXED FEES PLUMBING PERMIT COMMERCIAL: 1%of bid plus state surcharge. MINIMUM: $49.50 plus state surcharge RESIDENTIAL: $ 7.00 per opening plus state surcharge MINIMUM: $49.50 plus state surcharge Water Softeners: $15.00 plus state surcharge. Sewer and Water: $49.50 plus state surcharge. MECHANICAL PERMIT FEES COMMERCIAL: 1%of bid plus state surcharge MINIMUM: $49.50 plus state surcharge RESIDENTIAL: IF INSTALLING BOTH HEAT AND AIR CONDITIONING ON THE SAME PERMIT: Heating plant $49.50 Air conditioning $25.00 Plus State surcharge IF INSTALLING EITHER HEAT OR AIR CONDITIONING: Heating plant ONLY: $49.50 plus state surcharge Air conditioning ONLY: $49.50 plus state surcharge Heating plant includes fireplaces $50.00 Miscellaneous work such as duct work, new gas line, etc, has the minimum fee applied WORK COMMENCING BEFORE PERMIT ISSUANCE. If work for which a permit is required by the code has been commenced without first obtaining a permit, a special investigation shall be made before a permit may be issued for the work. An investigation fee shall be collected and is in addition to the required permit fee, and equal to the permit fee. FEE REFUNDS. The building official may authorize refunding of any fees paid here under which was erroneously paid or collected. The building official may authorize refunding of not more than 80 percent of the permit fee or plan review fee paid when no work has been done under a permit issued. The building official shall not authorize refunding of any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment. REINSPECTIONS. A reinspection fee may be assessed for each inspection or re- inspection when such portion of work for which inspection is called for is not complete or when corrections called for are not made. To obtain a reinspection, the permit applicant shall pay the reinspection fee in accordance with Building Permit Fee Table in the fee schedule adopted by this Municipality. In instances where reinspection fees have been assessed,no additional inspections of the work will be performed until the required fees have been paid. EXPIRATION. Every permit issued by the building official shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit,or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Before such work can be recommenced, a new permit shall be first obtained to do so,and the fee therefore shall be one half the amount required for a new permit for such work, excluding plan review fee,provided no changes have been made or will be made in the original plans and specifications for such work. The building official may grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated. EXPIRATION OF PLAN REVIEW. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the building official. In order to renew action on an application after expiration,the applicant shall resubmit plans and pay a new plan review fee. In the event of a hardship and at the discretion of the building official a new plan review fee may be waived. BUILDING PERMIT FEES TOTAL VALUATION FEE $1.00 to $500.00 $23.00 $23.50 for the first$500.00 plus$3.05 for each additional $100.00,or fraction thereof, to and including$2,000.00 $501.00 to $2,000.00 $69.25 for the first$2,000.00 plus$14.00 for each additional $1,000.00, or fraction thereof,to and including$25,000.00 $25,001.00 to $50,000.00 $391.25 for the first$25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof,to and including $50,000.00 $50,001.00 to $100,000.00 $643.75 for the first$50,000.00 plus$7.00 for each additional$1,000.00, or fraction thereof,to and including $100,000.00 $100,001.00 to $500,000.00 $993.75 for the first$100,000.00 plus $5.60 for each$1,000.00, or fraction thereof,to and including$500,000.00 $500,001.00 to $1,000,000.00 $3,233.75 for the first$500,000.00 plus $4.75 for each Additional $1,000.00, or fraction thereof,to and including $1,000,000.00 $1,000,001.00 and up $5,608.75 for the first$1,000,000.00 plus $3.15 for each additional $1,000.00, or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours $47.00 per hour* 2. Reinspection fees assessed under provisions of Section 305.8 $47.00 per hour* 3. Inspections for which no fee is specifically indicated $47.00 per hour* (minimum charge- one-half hour) 4. Additional plan review required by changes,additions or revisions to plans $47.00 per hour 5. For use of outside consultants for plan checking and inspections,or both Actual costs * Or the total hourly cost to the jurisdiction,whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. ** Actual costs include administrative and overhead costs. Enacted by the City Council of the City of Stillwater this 7th day of August 2007. CITY OF STILA.TER rte. Ken cki, �fayor ttest: A�&�_ Qom• L�����%�%!(ice... Diane F. Ward, City Clerk AFFIDAVIT OF PUBLICATION Stillwater Gazette 1931 Curve Crest Blvd. 8/13/07 Stillwater,MN 55082 (651)439-3130 Fax:(651)439-4713 State of Minnesota ss. County of Washington) The undersigned, being duly sworn, on oath, says that s/he is the Publisher or authorized agent and employee of the Publisher known as the Stillwater Gazette,and has full knowledge of the facts which are stated(A)The newspaper has complied with all of the requirements constituting qualification as a qualified newspaper,as provided by Minnesota State Statute 331A.02, 331A.07 and other applicable laws as amended.Printed below is a copy of the lowercase Alphabet,from A to Z,both inclusive,which is hereby acknowledged as being the size and kind type used in composition and publication of the of notice.abcdefghijklmnopgrstuvwxyz 4ish2/A:�t.:1th�o—rizzd Agent Subscribed and sworn to or affirmed to me 71 on this ! day of sedv a ,2007- 7 RK EDWARD BERRIM NNNOTARY PV9UC MINNESOTA Notary Public (0MA My Commlwlon Expinc.:an o,tui r City of Stillwater Invoice#: 00006659 216 4th St N. Stillwater, MN 55082 Terms: Net 30 Inches Description Price Total 38 1 Day City of Stillwater - $7.90 $300.20 Ordinance No.988-8/10 $300.20 Sub Total $300.20 Payment $0.00 Maximum rate per column inch under Balance Due $300.20 'tinnesota Law:$16.90 per 12-pica column 9111iMralrr atetb, ugust 10,2007 ORDINANCE NO.988 AN ORDINANCE ESTABLISHING PERMIT FEES -- --TO BE COLLECTED BY THE CITY OF STILLWATER v"- permit Per^ by ihebuildingm °hal 8 al l expire by limitation and and void If the building or work sull honied by such permit is not commenced The City Council d the City of Stillwater does ordain: .n 180 days from the dale of such permit,or If the building or work authorized by such psmhit is suspended or abandoned at any time after the work Is commenced for a ped- 1. Anew Section 33.4 fa hereby adopted to hereafter read as follows: od d 180 days. Before such work can be recommenced, a new permit shall be first obtained to do so'and the tee therefore shall be one had the amount required for a new PERMIT FEES.The applicant fora permit shall provides f estimated con- Pew s stnktloh value at the time d application,except for fixed fees.Permit valuations shell or eo In Pis and for such work include total value of all construction work,including materials and labor,for which the work,excluding review fee,provided no changes neve been made permit is being issued,such as gas,mechanical,plumbing equipment,and permanent The building official may grant,in writing,one or more extensions of time,for perlode not systems.The building official shall make the final determination of value, more than 180 days each.The extension shall be requested in writing and justifiable Valuation Is based on the building valuation data,dated May of 2004 or the most current Cause demonstrated. valuation provided by the ICC via State of Minnesota Building Codes and Standards EXPIRATION OF PLAN REVIEW.Applications for which no permit Is Issued within IW Division or Contract bid price.The building official shall make the final determination. days following the date of application shall expire by limitation,and plans and other data subrllted for review may thereafter be returned to the applicant or destroyed by the Etosptions:Building permit valuations for the following structures shall be based on the big official.In order to renew action on an application after expiration,the applicant valuation of on-site wok only: shill resubmit plane and pay a new plan review fee.In the eventof a hardship and at the a. Manufactured homes containing a Housing and Urban Devebprmenn(HUD) discretion of the building oficial a new pian review fee may be waived. certification label; BUILDING PERMIT FEES bi, Prefabricated buildings with a Minnesota Building Codes and Standards TOTAL VALUATION FEE Division prefabrication label;and $1.00 to$500.00 $23.00 c. Industrialized/modular buildings with an IndustrializednoMs Industrialized Building Corefmh $23.50 for the first$500.00 plus$3.05 for each (IBC)label. additional$100.00,or fraction thereof,to and PLAN REVIEW FEES.When submittal documents are required by the build- $M.00 10 a0w.00 Including uild- Including$2,000.00 Ing ollicial,a plan review fee shall be paid.Said pian review fee shall be 65 percent d b 52 000.00 to buk khg permit fee.The plan review fees are separate fees from the permit fan And addit$69.25tonal are first$2,000.00 plus$14.00 for each *a In addition to the pemit fees.When submittal documents are Incomplete or clanged Including 25,x10.00,or fraction thereof,b and W as o require additional platin review, fees shall be charged at the rate shown in Including$25,000.00 Bualtdktg Permit Fee Table.' Plan review fees for similar plans failing under 1300.0160, **,00140 t0*50,000:00 $391.25 for the first$25.000.00 plus$10.10 for each ahbpart 5,shall be 25 percent of the building permit fee. a additional$1,000.00,or fraction thereof,to and RXED FEES Including$50,000.00 PLUMBING PERMIT $50,1x11.00 to$100,000.00 $643.75 for the first$50,000.00 plus$7.00 for each additional$1,000.00,or fraction thereof,to and COMMERCIAL: 1%of bid plus state surcharge. including$100,000.00 MINIMUM: $49.50 plus state surcharge RESIDENTIAL: $ 7.00 per opening plus state surcharge $100,001.00 td 5500,000.00 $993.75 for the first$100,dOd.00 plus$5.60 for each MINIMUM: $49.50 plus state surcharge $1,000.00,or fraction ihered,to'and Yldudfrrg $500,000.00 Walw Softeners: $15.00 plus state surcharge. 5500,001.00 to$1,000,000.00 $3,233.75 for the first 5500,000.00 Alio f4.76 ler Sewer and Water: $49.50 plus state surcharge. each Additional$1,000.00,or inaction thsreol,band MECHANICAL PERMIT FEES including$1,000,000.00 COMMERCIAL: t%d bid plus state surcharge $1,000,001 AO and up $5,608.75 for the first$1,000,000.00 plus$2.15 for • MINIMUM: $49.50 plus state surcharge each additional$1,000.00,or fraction tftered Other Ihepecttons and Fees: RESIDENTIAL: 1. Inspections outside of normal business tours $47.00 par hour'. 5.8 NBTALLDIG BOTH HEAT AND AL4 CONDITIONING ON THE SAME PERIf1'. 2 Refnspeotlon Nes assessed Ander provisions d Section 30 Kieft plant $49.50 $ 447.7. 00 no 3. inspect AAIr aondttioning $Moo Plus State surcharge brheYor vNhich fee a spedficdy Indicated 547.00 per hour' (rdnImurh charge-w*4mlt hour) OF IIBTAIL JNG EITHER HEAT OR AIR CONDITIONING: 4. Additional plan review required by changes,addMlons Hsslfrp plant ONLY: $49.50 plus state surcharge or revislons to plan $47.00 per four' Air conditioning ONLY:$49.50 plus state surcharge 5. For use of outside consultants for plan checking and Cos 'Heating pent Includes fireplaces $60.00 ion'or both AotwMts•• Miecollarbous work such as duct work,new gas line,etc,has the minimum fee applied Or the total hourly coat to the WAedictlon,whichever is the greatest.Tl1M rlDet ahaA WORK COMMENCING BEFORE PERM ISSUANCE If work for which a permit is include supervision, overhead, equipment, hourly wages and fringe befhawta-of 1tN wriplayses Involved. required try the code has been commenced without first obtaining a pemnit,a special »Auld oats Include administrative and overhead costs. Investigation shall be made before a permit may be issued for the work.An Investigation fee shall be collected and is in addition to the required permit fee,and equal to the per- MR in. Emoted by the City Council of the City of Stillwater this 7th day of August 2007. FOE REFUNDS.The building official may authorize refunding of any fees paid there CITY OF STFLLWA11!R under which was erroneously paid or collected. Ken H&rVq*l,Mow811-percent �40"hg,ofecal MAY" rip Ai�krSHPfp tli4R, d t�,�tNt Afles<:Diane F.want,Cay C1rrk iy►e gf-Alan reuiaw tee ppb oq,hatprk ho been.tlone.und.a perms issued.The building otfiaet shoe rat authorize refunding of any fee paid except on written applicaibn 111IM0 filed by the original pertnitee not later than 180 days after the date of fee payment. REINSPECTIONS.A relrispection fee may be assessed for each inspection or re4nepec ton when such portion of work for which Inspection Is called for Is not Complete or when corrections called for are not made. To obtain a reinspeotlon,the Permit applicant shall pay the relntpecton fee in m000r- darloe with Building Penult Fee Tobe In the lee schedule adopted by this Muridpailty M lnstanoes where nknpecdon fees have been assessed,no additional inspetxions of the work will be performed unYl the required fen haus been paid. RESOLUTION 2011- 14 FEES FOR SERVICES/PUBLICATIONS ADMINISTRATIVE CITATIONS FINE SCHEDULE 2011 NOW THEREFORE, BE IT RESOLVED that the Stillwater City Council hereby adopts the following fee schedule and administrative citations fine schedule for 2011, effective January 1, 2011. PLANNING PERMIT REVIEWS AND APPEALS: Comprehensive Plan Amendment Fee Escrow $1,000 $500- 0-5 acres $2,500 $5,000 6-40 acres $5,000 $10,000 41-80 acres $7,500 $20,000 over 80 acres Zoning Amendment (text or map) Fee Escrow $500 $500 0-5 acres $2,500 $2,500 6-40 acres $5,000 $5,000 41-80 acres $7,500 $10,000 over 80 acres Planned Unit Development(PUD) Concept Fee Escrow $3,000 $5,000 05 acres $5,000 $5,000 6-40 acres $7,500 $10,000 41-80 acres $10,000 $10,000 over 80 acres Final Fee Escrow $1,000 -0- 0-5 acres $2,000 -0- 6-40 acres $3,000 -0- 41-80 acres $5,000 -0- over 80 acres Subdivision Preliminary Plat Fee Escrow $500 + $100 per lot $2,500 0-5 acres $1,000 + $100 per lot $5,000 6-40 acres $2,000 + $100 per lot $7,50041-80 acres $5,000 + $100 per lot $10,000 over 80 acres Final Plat Fee $500 0-5 acres $1,000 6-40 acres $2,000 41-80 acres $5,000 over 80 acres 1 1/27/2011 Resubdivision $100 Lot Line Adjustment Application $25 Conditional/Special Use Permit Residential $150 Commercial $500 *Escrow amount dependent on Project location, Site conditions and type of development Tax Increment Financing App. Fee $5,000 Home Occupations Type 1 $25.00 Type II &Type III $150.00 (Hard Cost to City $102.00) Commercial/Industrial $500 Use Determination $500 Infill Design Permit $150 Variance Residential $150 Commercial/Industrial $500* *Escrow amount dependent on Project location, Site conditions and type of development Certification of Compliance $100 Design Review Permit $25 Sign Permit $50 Fence Permit $25 Bed & Breakfast Inspection $100 Zoning Letter $100 Annexation Permit $1000.00 up to 10 acres $2000.00 10 acres + Administrative Charges - Mowing, Cleanup & Snow Removal Services (in addition to all costs billed to the City for service) One time service call or the first reoccurring service call $100.00 Second and each additional reoccurring services call $50.00 Application for Joint Board Approval Escrow amount dependent on project location, site condition and type of development Fee Escrow Site Alteration Permit $25 n/a Demolition Permit $150 n/a Street Vacation $250 n/a Grading Permit- Residential $150 Engineering Fee $1,500 escrow Grading Permit—Commercial $500 Engineering Fee $5,000 escrow An escrow shall be established as indicated above to cover engineering and legal fees incurred by the City as part of the plan review. 1) The fee shall be doubled for after-the-fact permit applications 2) The Uniform Building Code establishes a fee schedule for grading permits Appeals $50 Permit Modifications Same fee as original permit Right of Way Permit Dependent on amount of work done Obstruction Permit $90 for two week period Contractor License $100 Contractor License Verification $5 Lead Certification/Verification $5 SANITARY SEWER RATES First Minimum Charge $39.00 Overage Charge $3.70 2 1127/2011 SEWER &WATER HOOKUP CHARGES - INFILL LOTS Sanitary Sewer $3,549 Water $3,549 STORM WATER RATES $10.00 SIGN & LIGHTING Residents - $8.00 per quarter- Commercial based on acreage PUBLICATIONS/MINUTES/AGENDAS: City Code Book $100 unbound/$125 bound Zoning Book $25.00 Downtown Plan $10.00 Design Manual $5.00 Comprehensive Plan $50.00 (printed & bound) Comprehensive Plan CD $15.00 Mailed minutes -per year $60.00 + Postage Mailed agendas - per year $20.00 + Postage Budget Book $25.00 Financial Report $50.00 PREPARED MAPS Black/White/Blue Line City Map (8.5 X 11) $2.00 City Map (11 x 17) $2.00 City Map (30 X 36) or copies of this size $12.00 Zoning (8.5 x 11) $2.00 Zoning (11 x 17) $4.00 Land Use Map (11 x 17) $4.00 Asbuilt Drawings (11 x 17) $10.00 minimum or$3.00 per page Asbuilt Drawings (24 x 36) $10.00 minimum or$6.00 per page Color City Map (30 x 36) $24.00 Zoning Map (36 X 48) $30.00 Zoning Map (8.5 x 11) $5.00 Zoning Map (11 X 17) $7.00 Land Use Map (11 x 17) $7.00 Topographic Maps $5.00 per acre plus staff time Parcel Map $10.00 minimum or$2.00 per page Electronic Data Via Mail* $25.00 each project plus staff time and postage Electronic Data Via e-mail* $15.00 each project plus staff time and postage *Electronic data fee must be paid and license agreement signed before sending information. OTHER SERVICES: Assessment Searches $20.00 Assessment Roll Copy (each) $20.00 Copies (B/W) per sheet 25¢ (8.5 X 11) 50¢ (8.5 X 14) 75¢ (11 X 17) Color Prints/Copies $2.00 per side (8.5 X 11) (1-5 pages) $1.75 per side (8.5 X 11) (6-50 pages) $2.50 per side (8.5 X 14) (1-5 pages) $2.25 per side (8.5 X 14) (6-50 pages) $3.00 per side (11 X 17) (1-5 pages) $2.75 per side (11 X 17) (6-50 pages) Audio Copies $15.00 DVD Copies $10.00 (Meetings the DVD available through Valley Cable) CD Copies $15.00 3 1/27/2011 LIQUOR & TOBACCO LICENSES: (requires public hearing to change fees of licenses) Per year On-Sale $2887.50 On-Sale Club $446.25 On-Sale Sunday $200 Off-Sale $200 On-Sale Wine $315 On-Sale Wine w/Strong Beer $477.75 On-Sale 3.2 Malt Liquor $162.75 Off-Sale 3.2% Malt Liquor $57.25 Tobacco $250 Initial Tobacco Investigation Fee $250 Initial Liquor Investigation Fee $300 Permit to consume $35 (local non-profits no charge) Annual Investigation (Liquor & Tobacco) $150 Temporary Liquor License Fee (12 per year—on-sale) $25 per day Temporary Liquor License Fee (3.2 unlimited) $25 per day PAWN BROKER FEE $5,000 plus monthly fee of$200 for computer access charges ST. CROIX VALLEY RECREATION CENTER RATES (Park Board approval 5/10 retroactive to September 10, 2010) Hourly Rates: Prime Time Non Prime Time Summer Ice Rec Center Ice $175/hour $150/hour $150/hour Lily Lake Ice $170/hour $150/hour $150/hour Full Field Hours $250/hour $190/hour $190/hour Half Field House $150/hour $135/hour $135/hour Other Rates: Open Skating $3.00/child $4.00/adult $7.00/family Open Field $3.00/child $4.00/adult $7.00/family STILLWATER PARK FEES All private individuals, religious institutions, and for-profit groups shall pay normal fees. The City does not charge not-for-profit groups and educational institutions to use City Parks, unless otherwise noted. The City does require a refundable damage deposit from ALL groups and persons renting parks facilities. Picnic Shelters and Gazebos $100 refundable damage deposit plus one of the following fees: $50/day for Stillwater city resident or $100/day for non-Stillwater city resident. Ballfields (for tournaments): $300 fee & refundable damage deposit $150 Park Open Space A $100 refundable damage deposit (i.e. weddings) - Non-Resident Fee of$50.00 Pioneer Park Bandshell $100.00 refundable damage deposit and $125.00 fee for residents and nonresidents (anytime). All groups, including not-for-profit groups and educational institutions must pay to use the Bandshell, 4 1/27/2011 Teddy Bear Park Building Rate Schedule A $100 refundable damage deposit per floor is required plus the following. Mon-Thurs Resident Non-Resident Non-profit Group For-Profit Group First 3 hrs 1 S floor $50 $80 $50 $80 dd'I hour (1"floor) $15 $25 $15 $25 First 3 hrs, (25,1floor) $40 $60 $40/$10* $60 dd'I hour 2 nd floor $10 $15 $10/$5* $15 Li * Rate based on a minimum of 10 meetings per year with no food at the meeting. Fri-Sun Resident Non-Resident Non-profit Group For-Profit Group First 3 hrs 16 floor $90 $160 $90 $160 Add] hour 1 st floor $25 $45 $25 $45 First 3 hrs (2" floor) $70 $125 $70 $125 dd'I hour 2" floor $20 $35 $20 $35 EVENTS & SPECIAL EVENTS Event Application Fee - $0.00 Special Event Application Fee - $50.00 Special Event with Contract Application Fee- $50.00 Special Event held in Stillwater Parks $500 Damage Deposit $250 Materials Picnic Tables $10.00/table/each day of event Orange Fencing $2.50/lineal foot Trash Containers $8.00/container/each day of event Refuse Collection Cost of staff time Portable toilets $60/event/unit Portable toilet—Handicapped $150/event/unit Electrical use (Parks, except Lowell Park)$10.00/each day of event Electrical use (Lowell Park) $20.00 per elec. box/each day of event Barricade 4'to 12' $2.00/barricade/each day of event Barricade 4'to 12'with flasher $5.00/barricade/each day of event Drums $1.00/drum/each day of event Reflective Cones $1.00/cone/each day of event Traffic Sign on stand $2.00/sign/each day of event PD No Parking Signs $1.00/sign/each day of event POLICE FEES: Administrative Citation Fees (see attached) Dog Licenses - per year $10.00 Dog Impound $50 Audio Copy $15 Video Copy $40 State Accident Reports No fee Police Reports No fee Peddler Background Check $25 per applicant and each representative In-house statistical computer run $25 Bicycle License $1 5 1/27/2011 FIRE INSPECTION 1. Automatic fire extinguishing systems 1.2% of value, $100.00 minimum 2. Fire alarm systems 1.2% of value, $100.00 minimum 3. Annual license for retail sales of consumer fireworks $100.00 4. Residential daycare and foster care inspection $50.00 5. Open burning permit $15.00 6. Tank removal permit $75.00 7. Residential yearly nuisance/false alarm fees—fees based on a per call basis 1-2 No charge 3-4 $75.00 5-6 $150.00 7-8 $300.00 9 + $400.00 Commercial yearly nuisance/false alarm fees—fees based on a per call basis 1-2 No charge 3-4 $90.00 5-6 $180.00 7-8 $360.00 9 + $425.00 False alarm fees based on calendar year PARKING RAMP FEES 1. Contract Parking. a. Business Hours Permit. This permit is for the use of one parking space on weekdays from 6:00 AM to 6:00 PM. Parking before or after the permitted hours is subject to the flat fee for transient parking, or the event parking fee if that applies. Note that all rates are given in monthly equivalents, however permits must be purchased in quarterly increments. The minimum purchase is one quarter. The prices listed are for each permit. i. Uncovered space (fourth level) $10/month [$30/quarter] ii. Covered space $15/month [$45/quarter] iii. Covered space, bulk rate (5 permit minimum) $12/month [$36/quarter] iv. Covered reserved space $20/month [$60/quarter] 2. Event Parking. Parking during events does not include overnight parking. Any vehicle parked at the event rate after 2:30 AM will be subject to towing. a. Summer weekends. For the purposes of the municipal parking ramp, "summer weekends" are defined as occurring between May 15t and October 31st. A summer weekend begins at 5:00 PM on Friday evening and runs through Sunday evening at 8:00 PM. i. The parking fee for summer weekends will be a flat$5. b. Special Events. Currently Lumberjack Days, 4th of July Fireworks and the Stillwater Criterium annual bike race are considered Special Events. The list of Special Events can be changed by the City Council. i. The parking fee for Special Events will be a flat $10. 3. Transient Parking. Transient parking is sometimes referred to as hourly parking. It is any parking that is not for special events or by contract. Any transient use vehicle that is parked past 2:30 AM will be subject to towing. a. The parking fee for transient parking will be a flat rate of$3 6 1/27/2011 Parkinq Space Usage Fee Peak Season Parking Rates Off Season Parking Rates Lot 1 $15/day/space' II city parking lots: 3 hours Free r less II other city parking lots $9/day/space2 II city parking lots : > 3 $3/day/space ours On-street parking $9/day/space2 On-street parking $3/day/space (except on Main St.) (except on Main St. Partial day use (or reservation) will incur only a partial day fee as follows: 0-2 hours = $5; >2 but <4 hours = $10; more than 4 hours = $15. 2 Partial day use (or reservation) will incur only a partial day fee as follows: 0-2 hours = $3; >2 but <4 hours = $6; more than 4 hours = $9. PARKING FINES: $10 any violation not preceded by another parking violation the prior 90 days $20 any violation preceded by one parking violation within prior 90 days $30 any violation preceded by two parking violations within prior 90 days $25 added to fine if not paid within 10 business days of issuance PERMIT PARKING FEES (PARKING LOTS): $10 permit parking per month per vehicle ($5 per month if after 15`h of month) 7 1/27/2011 ADMINISTRATIVE CITATIONS FINE SCHEDULE -Speeding 1-9 MPH over limit $60.00 MINN. STAT. §169.14 Sto Line Violation $60.00 MINN. STAT. 169.20, Subd. 3 Snowmobiles $70.00 City Code Sec. 51-6 Roller Skates; Skateboards $50.00 City Code Sec. 51-8 Jake Braking-Loud Muffler $75.00 City Code Sec. 51-8 Recreational Vehicles violation $50.00 City Code Sec. 51-7 Method of Parking $50.00 City Code Sec. 51-2 Winter Parking; Snow Emergencies $50.00 City Code Sec. 51-5 Oen Burning or Leaves $100.00 City Code Sec. 23-1, Subd. 10 Noise, Noisy Parties or Gatherings Electronic $100.00 City Code Sec. 38-2 Sound System/Audio Equipment $100.00 City Code Sec. 38-3 Public Nuisance Defined $75.00 City Code Sec. 38-1, Subd. 2 Public Nuisances Affecting Health $75.00 City Code Sec. 38-1, Subd. 2 1 Public Nuisances Affecting Peace and Safety $75.00 City Code Sec. 38-1, Subd. 2 2 Animal Violations $50.00 City Code Sec. 27-1-5 Public Parks: Hours of operation, permitted $50.00 City Code Sec. 48-5 activities Public Parks: Prohibited Acts $50.00 City Code Sec. 48-2 Conducted on Licensed Premises/Disorderly $50.00 City Code Sec. 43-1 Conduct, Disorderly House, Alcohol, etc. Minn. Stat. 609.72 Curfew $50.00 City Code Sec. 52-11 Disturbing the Peace $150.00 City Code Sec. 52-1 Sign Violations $100.00 City Code Sec. 31-214 Possession of Alcohol in Public $75.00 City Code Sec, 52-15 ALCOHOL VIOLATIONS, Chapter 43, Sec. 43-134 Type of Violation I't Offense 2ndOffence 3rd Offense 4th Offense 1. Commission of a felony Revocation N/A N/A N/A related to the licensed activity 2. Sale of Alcoholic Beverages Revocation N/A N/A N/A while license is under suspension 3. Sale/purchase of alcoholic $500.00 $750.00 & $1,000.00& Revocation beverages to/by underage person 3 day Suspension 9 day Suspension 4. Sales of alcoholic beverage to $500.00 $750 & $1,000 & Revocation obviously intoxicated person 3 day Suspension 9 day Suspension 5. After hours sales of alcoholic 3 day 6 day Suspension 9 day Revocation beverages Suspension Suspension S. After hours display or 3 day 6 day Suspension 9 day Revocation consumption of alcoholic Suspension Suspension beverages 7. Refusal to allow City 5 day 15 day Suspension Revocation N/A Inspectors or Police admission to Suspension inspect premises 8. Illegal gambling on premises 3 day 6 day Suspension 9 day Revocation Suspension Suspension 9. Failure to take reasonable 3 day 6 day Suspension 9 day Revocation steps to stop person from leaving Suspension Suspension remises with alcoholic beverages 8 1/27/2011 TOBACCO VIOLATIONS, Chapter 41, Sec. 41-2 Type of Violation V Offense 2 nd Offence 3rd Offense 1. Sale/purchase to/by underage person $75.00 $200.00 $250.00 & Revocation 2. Unlawful Vending Machine $75.00 $200.00 $250.00 & Revocation 3. Unlawful Self Service Sale $75.00 $200.00 $250.00 & Revocation 4. Refusal to allow City Inspectors& Police $75.00 $200.00 $250.00 & Revocation addition to inspect premises 5. All other tobacco violations $75.00 $200.00 $250.00 & Revocation Adopted by Council this 18th day of January, 2011. Ken Har ,ci, ay or Attest: Diane F. Ward, City Clerk 9 1/27/2011 CITY OF FOREST LAKE ORDINANCE NO.609 AN ORDINANCE RESCINDING ORDINANCE NOs.561 &572,579,590&603 AND HEREBY ESTABLISHING FEES AND CHARGES FOR LICENSES, PERMITS,SERVICES AND OTHER CHARGES WITHIN THE CITY OF FOREST LAKE,MINNESOTA. The City Council of the City of Forest Lake,Minnesota hereby ordains: The following schedule of license,permit,and service fees and other City charges is hereby adopted by the City Council of the City of Forest Lake,Minnesota as follows: ADMINISTRATION and SERVICES Assessment Search $ 25.00 each Audiotape/Copy of Public Meetings $ 10.00 each Faxes(send or receive) $ 1.00 per page Non-Sufficient Fund Check Fee $ 25.00 each Notary Fee $ 1.00 per document Photocopies $ .25 per page City Code $ 20.00 per CD ADMINISTRATION LICENSES AND PERMITS Adult Oriented Business $ 50.00 annual Background Check Fee $ 25.00 per City Code Antenna Lease $ varies per lease Billboard $ 50.00 per sign-annual Carnival/Circus $ 100.00 per event Dog License $ 10.00 plus proof of rabies vaccination Dog Kennel License $ 50.00 plus Certificate of Compliance or Conditional Use Permit(depends upon zoning) Fertilizer/Pesticide $ 50.00 annual Gambling Licenses 50.00 per application Garbage/Rubbish Hauler $ 50.00 annual plus insurance binder Liquor Off Sale $ 200.00 annual On Sale $ 3,000.00 annual 3.2 Beer Off Sale $ 200.00 annual 3.2 Beer On Sale $ 200.00 annual Club $ 300.00 annual Wine On-Sale $ 500.00 annual Investigation Fee $ 500.00 initial application/new business Set Up $ 100.00 annual Massage Location $ 50.00 annual Massage Therapist $ 50.00 annual Outdoor Entertainment $ 50.00 per application Pawnbroker $ 100.00 annual license fee plus $1.00 per billable transaction plus bond Peddler$ Per Ordinance Solicitor $ Per Ordinance Transient Merchant $ Per Ordinance 2011 City Fee Schedule(Amended 6.27.2011) Page 1 Taxi/Limousine $ 25.00 annual plus proof of insurance Tobacco $ 250.00 annual AIRPORT COMMISSION Hangar Lease Transfer $ 200.00 per transaction BUILDING CONSTRUCTION PERMIT FEES AND LICENSES BUILDING PERMIT FEE Permit fee to be based on job cost valuation or a fixed fee as stated in the following. The determination of value or valuation shall be made by the building official. The value to be used in computing the building permit and building plan review fees shall be the total of all construction work for which the permit is issued,as well as all finish work,painting,roofing,electrical,plumbing,heating,air conditioning, elevators,fire-extinguishing systems and any other permanent equipment. Valuation Based Permit Fee Schedule: See Exhibit A Fixed Fee Schedule for One and Two Family Dwellings(including townhomes)* Deck $ 100.00* Drain Tile $ 75.00* Fence Over Six(6)Feet in Height $ 75.00* Siding $ 100.00* (valuation based permit fee schedule to be used for stucco and brick and masonry veneer,minimum fee $100.00) Roof $ 100.00* Swimming Pool,Above Ground $ 100.00* Swimming Pool,Below Ground $ 150.00* Window and/or Door Replacement $ 25.00 per opening with a$100.00 maximum* Demolition and Moving Structure from Site Permit Fee* Structures not connected to utilities $ 25.00* Structures connected to City utilities $ 50.00* Manufactured Home Permit Fee(installed in a manufactured home park)* New installation or replacement $ 100.00* (valuation based fee schedule to be used for manufactured homes installed in other areas,fee based on work to be done on site, minimum fee$100.00) Moving Permit Fee* Moving within or into the City $ 50.00* (permit for moving only,valuation based fee schedule to be used for all work done at new location of building being moved) Inspection fee prior to moving building $ 55.00 per hr One-hr min BUILDING SERVICE EQUIPMENT PERMITS Plumbing Permit Fee* Residential: $9.00 for each fixture opening plus $ 40.00* Note: the minimum fee to be charged for a residential plumbing permit shall be$50.00 Commercial: 2%of estimated job cost plus $ 85.00* Mechanical Permit Fee* Residential Gas piping—Repair or new installation $ 15.00 Gas or oil fired furnace or boiler $ 30.00 2011 City Fee Schedule(Amended 6.27.2011) Page 2 Warm air ducting or hot water heating system $ 20.00 Alteration of any warm air ducting or hot water system $ 10.00 Air conditioning—new or replacement $ 20.00 Wood burning furnace,stove or factory built fireplace per unit $ 30.00 (valuation based fee schedule to be used for masonry fireplace) Swimming pool heater per unit $ 30.00 Air exchanger $ 20.00 Gas or oil heater,fireplace,log and/or insert per unit $ 20.00 Other Equipment $ 30.00 Note: the minimum fee to be charged for a residential mechanical permit shall be$50.00* Commercial: 1.5 %of estimated job cost plus $ 75.00* *Note: A State Surcharge of one-half mill (.0005)of the fee or 50 cents,whichever amount is greater is charged on all fixed fee permits. OTHER INSPECTIONS AND FEES Inspections Inspections outside of normal business hours: $80.00 per hour with a two(2)hour minimum Reinspection fees: $55.00 per hour with a one(1)hour minimum Inspections for which no fee is specifically indicated: $55.00 per hour with a one(1)hour minimum Investigation Fee: Work Without A Permit Whenever any work for which a permit is required from the city has been commenced without first obtaining said permit,a special investigation shall be made before a permit may be issued for such work. An investigation fee,in addition to the permit fee,shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law. Plan Review Fee • When a building permit is required and a plan is required to be submitted,a plan review fee shall be paid. Plan review fees for all buildings shall be sixty-five percent(65%)of the building permit fee.The fee for similar plans shall be twenty-five percent(25%)of the normal building permit fee as defined in M.S.B.C. Section 1300. • The plan review fees specified are separate fees from the building permit fees specified and are in addition to the permit fees and are to be charged when a plan review is done even if the permit is not issued. • When submittal documents are incomplete or changed so as to require additional plan review,or when the project involves deferred submittal items,an additional plan review fee shall be charged at the above rate. • Expiration of plan review. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation,and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the building official. The building official may extend the time for action by the applicant for a period not exceeding 180 days on request by the applicant showing that circum-stances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration,the applicant shall resubmit plans and pay a new plan review fee. Refund Fee • The building official may authorize refunding of any fee paid hereunder that was erroneously paid or collected. • The building official may authorize refunding of not more than eighty percent(80%)of the permit fee paid when no work has been done under a permit issued in accordance with this code. 2011 City Fee Schedule(Amended 6.27.2011) Page 3 • The building official shall not authorize refunding of the plan review fee when an application for a permit is withdrawn or canceled after a plan review has been done. • The building official shall not authorize refunding of any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment. Renewal Fee • Permits renewed within six(6)months after a permit has expired shall be charged a permit fee of $25.00. • Permits not renewed within six(6)months after a permit has expired and work remains to be done shall be charged as required for a new permit. License Fees Gas Installers License $50.00 FIRE DEPARTMENT Fire Reports Incident Report $20.00 Investigation Report $20.00 Fire Photographs $10.00 Fire Video $30.00 FIRE INSPECTIONS Permit fee to be based on job cost valuation or a fixed fee as stated in the following.The determination of value or valuation shall be determined by the fire official.The value to be used in computing the fire permit and fire plan review fees shall be the total of all work for which the permit is issued. REQUIRED CONSTRUCTION PERMITS Fire Suppression: (Installation of or modification to) Permit,value based See Exhibit A Plan Review 65%of Permit Fee Fire Alarm: (Installation of or modification to) Permit Valuation based permit fee: See Exhibit A Plan Review 65%of Permit Fee Temporary Assembly/Tent(Greater than 100 sq. ft.) $50.00 per tent Construction Permits Required in IFC Section 105.7 Valuation based permit fee: See Exhibit A REQUIRED OPERATIONAL PERMITS Fire Code Inspection Structures under 10,000 square feet $100.00 per(Initial+1 Reinspection) Structures 10,000-50,000 square feet $200.00 per(Initial+1 Reinspection) Structures over 50,000 square feet $300.00 per(Initial+1 Reinspection) 2°d and subsequent inspections $50.00 per hour—one hour minimum *Inspections outside of normal business hours: $80.00 per hour with a two(2)hour minimum. *Inspections for which no fee is specifically indicated will be$55.00 per hour with a one(1) hour minimum. Open Burning Permit(Maintaining open fire) No Charge Fireworks/Pyrotechnic Display(To use) $250.00 each event(waive American Legion 4`"of July) 2011 City Fee Schedule(Amended 6.27.2011) Page 4 Hazardous Materials(Storage tank) $150.00 per tank Permits Required in Section 105.6,IFC $200.00 per application Activities representing a higher than normal community hazard,at the discretion of the authority having jurisdiction. OTHER INSPECTIONS AND FEES Permit Re-inspection $55.00/hour(one hour minimum) Upon request of owner/occupant whose permit has been suspended or revoked. Double Permit 2x Normal Permit Fee Daycare Inspection $50.00 per Inspection Retail Sale of Fireworks $350.00 per application Work Without A Permit Whenever any work for which a permit is required from the city has commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The payment of such investigation fee shall not exempt any persons from compliance with all other provisions of this code nor from any penalty prescribed by law. Plan Review Fee • When a fire permit is required and a plan is required to be submitted, a plan review fee shall be paid. Plan review fee shall be sixty-five percent(65%)of the fire permit fee. • The plan review fees specified are separate fees from the permit fees specified and are in addition to the permit fees. • When submittal documents are incomplete or changed so as to require additional plan review, an additional plan review fee shall be charged at the above rate. Expiration of Permit • Permit becomes void if the work does not begin within 180 days or is suspended at any time for over 180 days. Permits issued and inspections made by the city are a public service and do not constitute any representation, guarantee, or warranty, either implied or expressed, to any person as to the condition of the building or the conformance to applicable construction codes. In order to renew action on a permit after expiration,the applicant shall resubmit plans and pay a new permit fee. Refund Fee • The fire official may authorize refunding of any fee paid hereunder that was erroneously paid or collected. • The fire official may authorize refunding of not more than eighty percent (80%) of the permit fee paid when no work has been done under a permit issued in accordance with this code. • The fire official shall not authorize refunding of the plan review fee when an application for a permit is withdrawn or cancelled after a plan review has been done. • The fire official shall not authorize refunding of any fee paid except on written application filed by the original permitted no later than 180 days after the date of fee payment. Renewal Fee • Permits renewed within 180 days after a permit has expired shall be charged a permit fee of$25.00. • Permits not renewed within 180 days after a permit has expired and work remains to be done shall be charged as required for a new permit. PARKS DEPARTMENT Farmers Market Booth Fees Commercial $ 50.00 Non-Profit/Exhibit No Charge 2011 City Fee Schedule(Amended 6.27.2011) Page 5 Food Vendors $ 150.00 Produce,Crafts $ 35.00 Gazebo Rental $ 150.00 per event plus refundable$150 damage deposit* Gazebo Electrical Surcharge $ 25.00* Athletic Field Rental $To be determined. *Fees waived for City and non-profit organizations PLANNING AND ZONING Appeals $ 200.00 Comprehensive Guide Plan Amendment Application Fee $ 4,000.00 Conditional Use Permit(includes site plan review) $ 1,000.00 Conditional Use Permit Amendment $ 500.00 Interim Use Permit $ 1,000.00 Documents Comprehensive Guide Plan Cost of production+tax Zoning Ordinance Cost of production+tax Other Studies and Ordinances Cost of production+tax Zoning Maps Color(8'/i x 11) $ 5.00+tax Color(11 x 17) $ 10.00+tax Color(17 x 20) $ 15.00+tax Color(24 x 36) $ 20.00+tax Color(35 x 39) $ 25.00+tax GIS Map $ 3.20+tax Environmental Assessment Worksheets Escrow Fee for City Consultant services(applicant will be responsible for actual costs incurred by the City) $10,000.00 Certificate of Compliance $ 50.00 Certificate of Compliance for Temporary Seasonal Sales $ 250.00 Grading Permit 50— 100 cubic yards $ 50.00 More than 100 cubic yards $ 500.00 Planned Unit Development Concept Plan $ 500.00 Preliminary Plan $ 1,500.00 Plus per acre charge $ 20.00 per acre Final Plan $ 1,500.00 PUD Amendment $ 1,000.00 Rezoning $ 1,000.00 Signs Permanent Installation: use the building permit valuation-based permit fee schedule,Exhibit A Temporary Banner Sign Permit(10-day event) $ 25.00 Temporary Annual Sandwich Board Sign Permit 50.00 Site Plan Review Site: One(1)acre or more $ 1,000.00 Site: Less than one(1)acre $ 500.00 Site Plan Review Amendment $ 500.00 Subdivision Fees Concept Plan $ 500.00 Preliminary Plat $ 1,000.00 plus Residential $ 10.00 per unit 2011 City Fee Schedule(Amended 6.27.2011) Page 6 plus Commercial/Industrial $ 50.00 per unit Final Plat $ 500.00 Minor $ 500.00 Administrative(lot line adjustment) $ 250.00 Other Subdivision(waiver of subdivision as allowed by state statute) $ 250.00 Lot Combination $ 250.00 Vacation of Row or Easement $ 200.00 Variance $ 500.00 Zoning Ordinance Text Amendment $ 1,000.00 Single Family Landscape Escrow(to be paid at time of building permit) $ 1,000.00 per unit Single Family Erosion Control Escrow(to be paid at time of bldg.permit) $ 1,000.00 per unit (Unless the same or greater amount is being required by the Watershed District as part of a permit for a specific site.) Park Dedication Fee per housing unit/residential $2,000.00 Park Dedication Fee for commercial: $2,000 per acre or$50.00 per 1,000 sq.ft. Woodland Preservation Performance Guarantee An amount to guarantee preservation of all trees identified by the approved Woodland Preservation Plan to be preserved within the construction zone shall be deposited with the City.The amount shall be calculated by multiplying the total caliper inches of significant trees to be preserved by the rate of payment of$75.00 per caliper inch and/or the total square feet of woodlands to be preserved at the rate of$1.50 per square foot. Tree Mitigation Fee $ 100.00 per caliper inch Development Fees see Exhibit B City Staff and Consultant Billing For applications that include excessive staff time,services performed by City personnel will be billed at two and one-half(2.5)times the actual payroll hourly rate. Services provided by City consultants will be billed at the current consultant rates.All recording fees to be billed at current rate. POLICE DEPARTMENT Audio Tape $ 10.00 Background Check $ 25.00 Finger Printing $ 10.00 Lock-Out(opening locked car) $ 25.00 Parking Ticket $ 35.00(On a City Street between 2:00 a.m. & 6:00 a.m.) Photograph Copies(traditional) $ 33.00 Photograph Copies(digital) $ 14.00 Video Tape $ 65.00 PUBLIC WORKS FEES Equipment-Per hour charge(does not include operator)Jetter/Vacuumed Truck $ 200.00 924G Cat Loader $ 85.00 143H Cat Road Grader $ 85.00 Street Sweeper $ 60.00 5-foot Snow Blower $ 65.00 Bucket Truck $ 55.00 Tandem-axle Truck $ 55.00 Single-axle Truck $ 45.00 Tractor Loader Backhoe $ 60.00 8-foot Ditch Mower $ 45.00 60-inch Boom Mower $ 50.00 2011 City Fee Schedule(Amended 6.27.2011) Page 7 21-foot Wing Mower $ 45.00 Skid Loader $ 56.00 Compact Tractor $ 45.00 12-foot Wing Mower $ 32.00 Air Compressor $ 40.00 1-ton Dump Truck $ 35.00 Pick-up Truck $ 32.00 Front-Mount Mower $ 32.00 Equipment Trailer $ 26.00 Brush Chipper S 25.00 Paint Stripper $ 22.00 Asphalt Roller $ $30.00 Asphalt Saw $ 28.00 Plate Compactor $ 26.00 21-inch Push Mower $ 9.00 Weed Whip $ 5.00 3-inch Water Pump $ 24.00 Streets& Signs Street Name,per Blade $ 35.00 24-inch sign $ 39.50 30-inch sign $ 52.35 36-inch sign $ 74.00 6-foot Extension Post $ 15.86 7-foot Extension Post $ 21.40 12-foot 2-inch Round Post $ 35.80 Sign bracket Cross Pieces $ 6.70 Street Light Utility $ 1.00 per REF per month/billed annually Driveway Escrow $2,500.00 Swing Away Mailbox&Post $ 109.38 Heavy Equipment Operator Per Hour $ 40.62 Administration Fee of Total 30% Utilities-Water and Sewer Meter Disconnection $ 50.00 Meter Reconnection $ 50.00 Water Turn On $ 50.00 Water Turn Off $ 50.00 Water Emergency Turn On $ 100.00 Water Emergency Turn Off $ 100.00 Water Meter Accuracy Check $ 125.00 [over 1-inch=consulting fee plus 25%] Water Meter Installation $ 50.00 [over 1-inch plumber installed] Water&Sewer Inspection Fee $ 50.00 Storm Water Utility $ 32.00 per REF per year/billed annually Water User Fees Exhibit C Sewer User Fees Exhibit C Met. Council SAC Fee $ 2,230.00 per sac unit or as set by Metropolitan Council Water Availability Charge $ 1,313.00 per unit Sanitary Sewer Core Charge $ 1,200.00 Street Opening Excavator's License $ 50.00 Street Opening Permit $ 50.00 Street Opening Deposit $ 3,500.00 Meters: 2011 City Fee Schedule(Amended 6.27.2011) Page 8 3/4"includes reader $ 256.73 1"includes reader $ 410.58 2"Compound(includes flanges&reader) $ 2,213.29 3"Compound(includes flanges&reader) $ 3,266.80 4"Compound(includes flanges&reader)$4,312.89 Utility Operator Charge $ 39.05 Horns: '/-inch(includes UFR&2 swivels) $ 152.58. 1-inch(includes 2 swivels) $ 126.95. 3/-inch copperhorn/UFR Resetter $ 143.75 Corp Valve 1-inch $ 55.53 Curb Stops 1-inch $ 92.24 1 '/curb box w/rod $ 54.83 Lockable Valve Box $ 279.96 Locking Valve Box Lid(replacement) $ 36.80 Hydrant Meter Deposit 2 '/z"meter $ 1,050.00 Hydrant Water Rental&Usage Fee 21/2"meter rental $ 114.00(includes use of meter and 5,000 gallons of water) usage per 1,000 gallons $ 3.64 Hydrant Meter Monthly Base Fee 21/2"meter $ 80.00 Fill Station(per 1,000 gallons) $ 3.00 Sewer/water capping or on-site septic abandonment,and/or well sealing escrow$500.00 Late Payment Charge 3% Non-compliant Sump Pump Charge $ 100.00 per month Demolition Escrow 125%of the total project removal costs All prices are subject to change as they are based on manufacture cost PLUS sales tax Some data requests may fall under the Minnesota Data Practices Act, Minnesota Statutes Chapter 13,and may have different fees charged. Section 2. EFFECTIVE DATE. This ordinance becomes effective upon its adoption and publication according to law but not prior to January 1,2011. Adopted by the City Council of the City of Forest Lake on this 27`x'day of June 2011. Chris Johnson,Mayor Chantal M.Doriott,Deputy Clerk 2011 City Fee Schedule(Amended 6.27.2011) Page 9 EXHIBIT A VALUATION BASED PERMIT FEE SCHEDULE TOTAL VALUATION FEE $1.00 to $500.00 $25.00 $501.00 to $2,000.00 $25.00 for the first$500.00 plus $3.25 for each additional $100.00, or fraction thereof,to and including$2,000.00 $2,001.00 to $25,000.00 $73.75 for the first$2,000.00 plus $14.75 for each additional $1,000.00, or fraction thereof, to and including$25,000.00 $25,001.00 to $50,000.00 $413.00 for the first$25,000.00 plus $10.75 for each additional $1,000.00, or fraction thereof,to and including$50,000.00 $50,001.00 to $100,000.00 $681.75 for the first$50,000.00 plus$7.50 for each additional $1,000.00, or fraction thereof,to and including$100,000.00 $100,001.00 to $500,000.00 $1056.75 for the first $100,000.00 plus$6.00 for each additional $1,000.00, or fraction thereof, to and including$500,000.00 $3,456.75 for the first $500,000.00 plus$5.00 for each $500,001.00 to $1,000,000.00 additional$1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $5,956.75 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00, or fraction thereof Note: A State Surcharge is added to all valuation based fees equaling the following: (1) if the valuation of the structure, addition, or alteration is $1,000,000 or less, the surcharge is equivalent to one-half mill (.0005)of the valuation of the structure, addition, or alteration; (2)if the valuation is greater than$1,000,000, the surcharge is$500 plus two-fifths mill(.0004) of the value between$1,000,000 and $2,000,000; (3)if the valuation is greater than$2,000,000, the surcharge is $900 plus three-tenths mill (.0003) of the value between$2,000,000 and$3,000,000; (4)if the valuation is greater than$3,000,000, the surcharge is $1,200 plus one-fifth mill (.0002) of the value between$3,000,000 and$4,000,000; (5)if the valuation is greater than $4,000,000, the surcharge is $1,400 plus one-tenth mill (.0001) of the value between$4,000,000 and$5,000,000; and (6)if the valuation exceeds $5,000,000,the surcharge is $1,500 plus one-twentieth mill(.00005) of the value that exceeds $5,000,000. 2011 City Fee Schedule(Amended 6.27.2011) Page 10 EXHIBIT B FEES FOR DEVELOPMENT PROJECTS Project Design Letter of Credit 15-20% of construction cost(determined by City Engineer) Public/Private Improvement Costs 125% of construction costs Letter of Credit Landscaping Letter of Credit 125% of approved landscaping costs Water System Area Charges $4,450 per acre(pay at time of signing Development Agreement) Sanitary Sewer Area Charges $3,000 per acres(pay at time of signing Development Agreement) Metropolitan Council SAC Fee $2,230 per SAC unit or as set by Metropolitan Council (pay at time of Building Permit) City WAC Fee $1,313 per unit(pay at time of Building Permit) City Core Sewer Core Fee $1,200 per unit(pay at time of Building Permit) Parkland Dedication Fee Residential zoned areas $2,000 per residential unit Commercial/Industrial zoned areas $2,000 base fee and$2,000 per acre Other fees or costs may be required as part of the Development Agreement for special public improvement needs associated with the project, such as existing street improvements,traffic signals, drainage, etc. All plans for public improvement projects, including private streets projects with public utilities, are to be prepared by the City Engineer. Construction is to be funded privately by the project developer. Financial guaranty's in the form of a letter of credit for Engineering and 125%of construction cost is to be posted with the City prior to the start of construction. Construction is to begin within 90 days of the bid opening. 2011 City Fee Schedule(Amended 6.27.2011) Page 11 EXHIBIT C SANITARY SEWER AND WATER WORKS USER RATES/CHARGES WATER RATE SCHEDULE Service Minimum Cost Fixed Water Fall/Winter Spring/ Water Fall/Winter Spring/ Meter Units Per Per Quarter Quarter Charge Above Summer Above Summer Size- Quarterly Units/ Quarter Units/ Quarter Inches Quarter Unit Bill Quarter Cost/Unit Cost/Unit Quarter Cost/Unit Cost/Unit 3/4 5 $3.58 $ 17.90 5 $2.54 $2.80 15 $2.67 $3.64 1 10 $3.45 $ 34.50 10 $2.54 $2.80 30 $2.67 $3.64 1-1/2 22 $3.45 $ 75.90 22 $2.54 $2.80 66 $2.67 $3.64 2 40 $3.45 $138.00 40 $2.54 $2.80 120 $2.67 $3.64 3 90 $3.45 $310.50 90 $2.54 $2.80 270 $2.67 $3.64 4 160 $3.45 $552.00 160 $2.54 $2.80 480 $2.67 $3.64 6 320 $3.45 $1,104.00 320 $2.54 $2.80 960 $2.67 $3.64 Lead testing$1.59 per quarter. SEWER RATE SCHEDULE Meter Size Minimum Cost Minimum Sewer Cost Per Unit Above Units Per Quarter Per Unit Quarterly Bill Above Units Minimum* 3/4 10 $4.25 $42.50 10 $4.70 1"or larger 10 $4.25 $42.50 10 $4.70 * Maximum of$75.00 for residential. * Sewer charge based on winter quarter water use on residential accounts. *The sewer charge shall not exceed$75.00 per quarter on residential accounts. *The sewer flat rate charge for unmetered residential or other accounts shall be$75.00 per quarter multiplied by the number of SAC units. 2011 City Fee Schedule Page 12 CITY OF HUGO 2011 FEES,RATES AND CHARGES ESCROW FEES AND OTHER BUSINESS LICENSES: ALCOHOL RELATED: On/Off Sale Liquor License Application $ 500.00 3.2 Off-Sale $ 100.00 3.2 On-Sale $ 150.00 Club On-Sale $ 200.00 Intoxicating Off-Sale $ 100.00 Intoxicating On-Sale $ 2,300.00 Sunday On-Sale $ 200.00 Wine On-Sale $ 200.00 Temporary 3.2 or Intoxicating Liquor $ 15.00 per day ALCOHOL LAW VIOLATIONS: Type of Violation 1st 2nd 3rd 4th Violation Violation Violation Violation Sale of alcoholic beverage while license is under suspension Revocation N/A N/A N/A Sale/purchase of alcoholic beverages tolby underage person $ 300.00 $ 750.00 $ 1,000.00 Revocation "and mandatory alcohol awareness class for all employees Sale of alcoholic beverages to obviously intoxicated person $ 200.00 $ 500.00 $ 1,000.00 Revocation After hours sale of alcoholic beverages $ 300.00 $ 750.00 $ 1,500.00 Revocation After hours display or consumption of alcoholic beverages $ 200.00 $ 500.00 $ 1,000.00 Revocation GAMING RELATED: Billiards(per table) $ 10.00 Pinball(per machine) $ 15.00 Video(per location) $ 15.00 +$15 per machine TOBACCO RELATED: Cigarette/Tobacco $ 100.00 n T .. s TOBACCO LAW VIOLATIONS: Type of Violation 1 st 2nd 3rd 4th Violation Violation Violation Violation Prohibited sale and/or other illegal acts as defined by ordinance(or permit a person under $150 and a 5-day $150 and license the age of 18 years to use tobacco products license suspension determined At City Council's on the licensed premises) $ 50 00 suspension by City Council discretion OTHER BUSINESSES: Auto Dismantling/Junk Yard $ 200.00 Mining $ 275.00 $ 5,000.00 Peddlers Permit $ 25.00 Utility Installation $ 75.00 Waste Hauler License Application $ 540.00 Waste Hauler $ 165 00 NON-BUSINESS LICENSES&PERMITS: DOG LICENSES: License Duration 6 months to 1 year $ 5.00 $ 4.00 if spayed or neutered 1 Year and over $ 10.00 $ 8.00 if spayed or neutered Late License Fee $ 5.00 one month or less Late License Fee $ 10.00 over one month Open Burning-Commercial $ 50.00 Open Burning-Residential $ 15.00 Special Event Permit $ 75.00 Special Event Sign Permit $ 20.00 Temporary Mobile Home/Sales Trailer $ 110.00 $ 2,500.00 Page 1 CITY OF HUGO 2011 FEES,RATES AND CHARGES ESCROW FEES AND OTHER BUILDING PERMITS: Schedule Adopted by LMC/AMM Bldg Permit Fee Working Group VALUE RANGE $1-$500 $ 25.00 $501-$2,000 $ 25.00 for the first $ 500.00 $ 3.25 each additional $ 100.00 $2,001-$25,000 $ 73.50 for the first $ 2,000.00 $ 14.75 each additional $ 1,000.00 $25,001-$50,000 $ 415.75 for the first $ 25,000.00 $ 10.75 each additional $ 1,000.00 $50,001-$100,000 $ 682.50 for the first $ 50,000.00 $ 7.50 each additional $ 1,000.00 $100,001-$500,000 $ 1,053.50 for the first $ 100,000.00 $ 6.00 each additional $ 1,000.00 $500,001-$1,000,000 $ 3,427.75 for the frst $ 500,000.00 $ 5.00 each additional $ 1,000.00 $1,000,001 and up $ 5,945.25 for the first $ 1,000,000.00 $ 4.00 each additional $ 1,000.00 BUILDING RELATED: Air Conditioning(central) $ 30.00 Air-to-Air Heat Exchanger $ 30.00 Building Moving $ 110.00 $ 2,500.00 City Inspection Fee(one hour minimum) $ 58.00 per hour Building Permit Refund Charge 20%of permit Driveway $ 55.00 Fireplace(zero-clearance) $ 30.00 Gas Piping $ 30.00 Mechanical $ 35.00 Plumbing(per fixture) $ 8.00 Plan Review Fee-Identical Plans 25%of building permit fee Plan Review Fee-Non-Identical Plans 65%of building permit fee DEMOLITION RELATED: Accessory Building $ 50.00 Commercial or Residential Building $ 120.00 $ 1,000.00 DEVELOPMENT FEES: Escrow for Engineering&Legal 4% of cost of improvements Letter of Credit or Cash Escrow 125% of cost of improvements City Engineering Technician Inspections $ 77.00 per hour Parkland Dedication: Commercial and Industrial Exempt Residential $ 2,400.00 per unit Sealcoating $ 4.00 per lineal foot Snowplowing $ 0.500 per lineal foot • Stormwater Trunk Fee $ 0.07 per square foot of net developable area LOCAL GOVERNMENT UNIT(LGU)FEES: No-Loss Exemption Determination $ 200.00 Delineation Approval: Less than 10 acres site $ 200.00 10 acre site or larger $ 300.00 Replacement Plan Application: Less than 10 acres site $ 500.00 TBD upon review 10 acre site or larger $ 750.00 TBD upon review Wetland Banking Application $ 1,500.00 TBD upon review Annual Wetland Mitigation Monitoring $ 2,500.00 5-year escrow All Other Wetland Services $ 200.00 TBD upon review LGU fees are in addition to planning&zoning fees(and escrows)identified below. PLANNING&ZONING RELATED: CONDITIONAUINTERIM USE RELATED: Conditional/Interim Use Permit Application $ 500.00 $ 1,000.00 Commercial Only Conditional/Interim Use Permit Amendments $ 250.00 COMPREHENSIVE PLAN RELATED: Comprehensive Plan Amendment $ 540.00 PLANNED UNIT DEVELOPMENT RELATED: Planned Unit Development Application $800+$20 per lot $ 5,000.00 Planned Unit Development Amendment $ 325.00 $ 2,500.00 Page 2 CITY OF HUGO 2011 FEES,RATES AND CHARGES ESCROW FEES AND OTHER PLANNING B ZONING RELATED(continued): PROPERTY LINE RELATED: Encroachment Agreements $ 120.00 Property Line Adjustment Application $ 150.00 REZONING RELATED: Rezoning Application(less than 5 acres) $ 540.00 $ 1,000.00 Rezoning Application(more than 5 acres) $ 1,080.00 $ 1,000.00 Rezoning to Long-Term Agricultural $ 135.00 SITE PLAN RELATED: Commercial or Industrial Site Plan $ 350,00 $ 5,000.00 Farm Site Plan $ 30.00 Sketch Plan Review $ 110.00 STREET&ROADWAY RELATED: Street and Easement Vacation $ 110.00 $ 1,000.00 SUBDIVISION RELATED: Payable with Preliminary AND Final Plat Applications Minor Subdivision-Rural(3 lots or less) $ 220.00 $ 1,000.00 ♦ Minor Subdivision-Urban(3 lots or less) $ 220.00 $ 2,000.00 Subdivision-4 to 15 lots $ 540.00 $ 5,000.00 Subdivision-16 to 30 lots $ 700.00 $ 10,000.00 Subdivision-Over 30 lots $23 per lot $ 20,000.00 VARIANCE RELATED: Variance to Zoning Ordinance $ 200.00 _�..�,a. .#�.fit,'ws.x �...�. .uG. .:;,.+'S, •"ri:.s ...,«�x,.�' . xrler�: :� r�ay.""r'�3'w . .xcrs ?,?,�°._a.,ws��tk....»� .i.�.L..e '" PUBLICATIONS: Audit $ 55.00 Comprehensive Plan $ 55.00 Municipal Code $ 125.00 Zoning Map $ 7.00 Zoning Ordinance $ 65.00 Other Publications Cost+10% DVD Recordings $ 10.00 Official Newspaper Exempt PUBLIC WORKS RELATED: Grass/Weed Mowing $ 75.00 first half hour(minimum charge) Grass/Weed Mowing $ 50.00 each additional hour or fraction thereof Street Sweeping $ 150.00 per hour ROADWAY RECONSTRUCTION/REHAB: Single-Family Residential/Duplex Rates: Complete Reconstruction $ 5,200.00 per unit Partial Reconstruction $ 4,100.00 per unit Roadway Redamation/Overlay $ 3,400.00 per unit Urban Roadway Overlay $ 2,100.00 per unit Rural Roadway Overlay $ 1,800.00 per unit UTILITY RELATED: Hydrant Water(per truck load) $ 20.00 Hydrant Meter Rental Deposit $ 700.00 Hydrant Meter Rental $ 20.00 per day+$2.20/thousand gallons Sewer Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit Sewer Infrastructure Trunk Fee $ 1,632.00 per SAC unit r'1'1 0 Sewer Infrastructure(SAC)Fee $ 588.00 per SAC unit, Sewer Utility Permit $ 30.00 o co Water Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit m V Water Infrastructure Trunk Fee $ 1,960.00 per SACunit '1,��D G Water Infrastructure(WAC)Fee $ 680.00 per SAC unit OC Water Meter Rental-Residential $ 285.00 Water Meter Rental-Commercial-1&1/2"Meter $ 575.00 T Vr Water Meter Rental-Commercial-2"Meter $ 695.00 Water Meter Rental-Commercial-Larger than 2" Cost+10% Water Meter Rental-Irrigation-1&1l2"Meter $ 575.00 +2 WACs Water Meter Rental-Irrigation-2"Meter $ 695.00 +2 WACs Water Meter Rental-Irrigation-Larger than 2" Cost+10% +WACs to be determined by City Engineer Water Meter Testing $ 80.00 Refundable if meter is faulty Water Meter No-Access Penalty $ 75.00 Water Utility Permit $ 30.00 Page 3 CITY OF HUGO 2011 FEES,RATES AND CHARGES ESCROW FEES AND OTHER '; n.�r �F` `��rtt"�"i.:�,p�k. s 9«r� - "''^2e' `µ '` a ..fid r; ?.`'�.�.k.�°trr «.,iK..�z..-,� 7. � U.ta.� :x,.rk�.... .;e.. ..ka��«sn.dY�'..R..w..,�h. RENTALS: Room Rental(City Hall&Rice Lake Centre,Hanifl Shelter): Residents(per event) $ 100.00 $ 100.00 Damage Deposit Non-Residents(per event) $ 200.00 $ 100.00 Damage Deposit Homeowners Associations(per year) $ 100.00 $ 100.00 Damage Deposit Park Shelter Rental: Permit $ 5.00 per permit Soccer Field Rental: Permit for Youth Organizations(full-sized field) $ 3,250.00 per season Permit for Youth Organizations(U11/U12 or other) $ 2,750.00 per season Youth Tournament Fee $ 40.00 per game Permit for Adult or Other Organziations $ 75.00 per hour Baseball Field Rental: Permit for Youth Organizations $ 10.00 per day Permit for Other Organizations $ 30.00 per day '101- ""M .,-.. 44 �n,...tS^.�... MISCELLANEOUS CHARGES: Assessment Search $ 25.00 Copies $ 0.300 Document Certification $ 20.00 Document Recording $ 80.00 Property Ownership Search $ 55.00 Records Search $ 55.00 per hour Service Charge for Returned Checks $ 30.00 Special Meetings: City Council $ 1,030.00 Planning Commission $ 515.00 �e mw*s4'i1r�? Page 4 WHITE BEAR AREA INSPECTION BUILDING FEES - 2011 TOTAL VALUATION FEE $1.00 to $500.00 $23.00 $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00. $2001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $993.75 for the first $100,000 plus $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.15 for each additional $1,000.00 or fraction thereof. Other Inspection and Plan Review Fees: ■ Inspections outside of normal business hours (minimum charge - two hours)......................................................................$47.00 per hour* • Re-inspection fees -------------------- ---.___.$47.00 per hour* ■ Inspection for which no fee is specifically indicated (minimum charge - one-half hour) -------------$47.00 per hour* ■ Plan Review Fees: Residential........................................•----•----•--------------•--•---------- .......................50% of permit fee Commercial.------------ --- ------------------ ------------------------------------•-------------:........-•-------65% of permit fee ■ Additional plan review required by changes, additions or revisions to plans (minimum charge - one-half hour)............................................. ....$47.00 per hour* ■ Outside consultants for plan checking and inspections or both-----------------Actual costs** * Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. ** Actual cost includes administrative and overhead costs. 11/7/11 BUILDING DEMOLITION PERMITS The permit fee shall be $25.00 for the first 1,000 square feet, plus $10.00 for each additional 1,000 square feet or fraction thereof. The minimum permit shall be $25.00. SURCHARGE VALUATION OF STRUCTURE ADDITION OR SURCHARGE COMPUTATION ALTERATION $1,000,000 or less .0005 x valuation (minimum $.50) $1,000,000 to $2,000,000 $500 + .0004 x (Value - $1,000.000) $2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000) $3,000,000 to $4,000,000 $1200 +.0002 x (Value - $3,000,000) $4,000,000 to $5,000,000 $1400 +.0001 x (Value - $4,000,000) Greater than $5,000,000 $1500 +.00005 x (Value -$5,000,000) PARK DEDICATION FEES a. Single family........................................... $1,000.00 b. Townhomes, Condos, and Duplex Dwellings...................................... $750.00 per unit c. Apartment Dwellings................................. $500.00 per unit for a 1 bedroom or efficiency plus $100.00 for each additional bedroom d. Commercial and Industrial $3,500.00 per acre CERTIFICATE OF OCCUPANCY...................... $10.00 (when required) ZONING PERMIT FEES PERMIT FEE FENCE All fences 4 feet and over require a zoning permit...........................................$30.00 DRIVEWAYS All new and replacement driveways require a zoning permit ..............................$30.00 SHEDS All sheds up to 120 square feet in size require a zoning permit............................$30.00 11/7/11 SEWER AVAILABILITY AND WATER CHARGES New commercial buildings, additions to commercial buildings, change of occupancy in existing buildings, and alterations that include new plumbing fixtures require a Metropolitan Council SAC Determination. The number of SAC units determined by the Metropolitan Council is applied to the three different SAC and WAC fee categories listed below: Metro SAC, White Bear Lake SAC, and White Bear Lake WAC. METROPOLITAN COUNCIL SEWER AVAILABILITY CHARGE (SAC) a. Single Family Dwellings.............................. $2,230.00 per dwelling Call Metro Waste for Commercial.................. 651-602-1378 CITY OF WHITE BEAR LAKE SEWER AVAILABILITY CHARGE (SAC) a. Single Family Dwellings.............................. $500.00 per dwelling b. Two Family Dwellings................................ $1,000.00 per dwelling c. Multiple Dwellings .................................... $300.00 per unit d. Commercial and Industrial.......................... $850.00 per acre or $500 per unit for each 100,000 gallons of estimated annual flow (a minimum of 1 unit charge). CITY OF WHITE BEAR LAKE WATER CHARGE (WAC) a. Single Family Dwellings.............................. $500.00 per home b. Two Family Dwellings................................ $1,000.00 per dwelling c. Multiple Dwellings .................................... $300.00 per unit d. Commercial and Industrial.......................... $850.00 per acre or $500 per unit for each 100,000 gallons of estimated annual flow (a minimum of 1 unit charge). 11/7/11 I"Reading: Publication: November 22,2010 December 21,2010 2°d Reading: Effective: December 13,2010 January 20,2011 Amended 2/28/11 (effective 4/7/11) Amended 7/11/11 (effective 7/11/11 City of Lino Lakes Ordinance No. 12-10 AN ORDINANCE ADOPTING THE 2011 CITY OF LINO LAKES FEE SCHEDULE AND PROVIDING FOR THE ISSUANCE OF LICENSES,PERMITS AND COLLECTION OF FEES THEREOF; REPEALS ALL ORDINANCES,PARTS OF ORDINANCES AND PREVIOUS FEE SCHEDULES THAT CONFLICT THEREWITH. The City of Lino Lakes City Council does ordain the following: Section 1. Findings. Pursuant to Minnesota Law, the Lino Lakes City Charter, and the Lino Lakes City Code, and upon a review of a study conducted by City Staff, a fee schedule for City services and licensing is hereby adopted as follows: 2011 FEE SCHEDULE ALCOHOLIC BEVERAGES 3.2 Beer Investigation $250.00(1 or 2); $450.00(3+) 3.2 Beer Off-Sale $200.00/Year 3.2 Beer On-Sale $300.00/Year 3.2 Beer On-Sale Temporary $50.00+ $5.00/Day Club License $300.00 Liquor License Investigation Fee $250.00 (1 or 2); $450.00(3+) Liquor On-Sale License $4,500.00/Year Liquor Off-Sale $200.00 Liquor Temporary Permit $50.00 Temporary Set-Up License $25.00 Wine License Investigation Fee $250.00(1 or 2); $450.00 (3+) Wine $500.00/Year Sunday Liquor $200.00/Year AMUSEMENT & COMMERCIAL RECREATION Cabaret License $35.00 Dances $200.00/Year Gambling Permit Application $10.00 State Licensed Gambling Regulation Tax 0.10%of gross receipts less prizes paid (amended by Ordinance No. 07-11, passed February 28, 2011) BUSINESS & MISCELLANEOUS Assessment Search Fee $20.00/Search Burning Permit $50.00 Dog Kennel- Private $20.00/Year Dog Kennel—Commercial $100.00/Year Dog License Male/Female $10.00 Dog License Male/Female $5.00(Spayed or Neutered) 1 Copies: Mailed Minutes $36.00/Year Copies: Mailed Agenda $12.00/Year Copies: Per Page 1St 10 Copies Free, then .25 per Page Copies: New Resident Labels $5.00 per Month Flat Fee Copies: Aerial/Topo Map $10.00 City Charter 1St Copy Free; $10.00 Each Add'] City Code Book $75.00 City Map $2.50 Comp. Plan. $55.00 Computer Disk or DVD $7.00 Environmental Handbook $55.00 Fax Charge 0 10 Pages Free,then .25 per Page Garbage Hauler License $75.00/First Truck; $45.00 each add'1 Overweight Permit $20.00 Pawn Shop Class A $10,000.00 Pawn Shop Class B $7,000.00 Class A Secondhand Goods Dealer $720.00 Class B Secondhand Goods Dealer $105.00 Class C Secondhand Goods Dealer No Fee Pawn Shop Investigation $15,000(deposit on costs) Pawn Shop In-State Investigation $750.00 Pawn Shop Out-State Investigation $20,000.00 Peddler, Solicitor, Transient Merchant $250.00/6 months Recycling Container Purchase 1St Free/$8.00 for each Additional Rental License(annual) $50.00 for 1 or 2 units $50.00+ $10 per unit for 3 or more units (fee to be reduced by 50% if issues less than six months from expiration date) Rental License Re-inspection Fee $50.00 Special Event Permit $50.00 Tapes: Audio $10.00 Tapes: Video $15.00 Tobacco License $50.00 Return Check Charge $30.00 Zoning Maps $5.00/Large or Colored Zoning Ordinance $25.00 PARK& RECREATION USER FEES Field Rental-Resident Only Baseball/Softball Drag Only $20/Evening Baseball/Softball Drag&Chalk $30/Evening Soccer(Excluding Youth) $65/Evening Picnic Shelter Reservation Residents-No Fee Non-Resident- $25 Playground Grab Bags $10.00/$25.00 FIRE REGULATIONS Annual Permit for Sale 2 Of Consumer Fireworks $350 exclusive retail seller/$100 in conjunction with existing retail store POLICE FEES Achieving Compliance through Education(ACE) Program Fees Equipment Violation $50.00 Moving Violation $100.00 Ordinance Violation $75.00 Parking Violation $100.00 Status Offense $50.00 Other Violations $100.00 Copy of Report Free to subject of data up to 3 pages; 4`h page$1.00; then$.25 add'l pages up to 100 Copy of Report-Mail In $4.00 up to 4 pages; $.25 per page thereafter Vehicle Lockouts No charge Clearance Letter $5.00 Fingerprinting $10.00,by appt. Video Image Printing $5.00 Photographs $25.00 plus developing cost Booking Photographs $5.00 Electronic Photographs $5.00 per page of four False Alarms 3 free; 4-10 $50.00; 11 or more$100.00/calendar yr. Vehicle Forfeiture Fee $100.00 per vehicle Videotape Copy $25.00 (Costs include all applicable taxes) Dangerous Dog_Registration $250/Year BUILDING- CONSTRUCTION UTILITIES Building Permit Fee Schedule Fee Table Total Valuation Fee $1.00 to $500.00 $23.50 $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof,to and including$2,000.00 $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof,to and including$25,000.00 $25,001.00 to $50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof,to and including$50,000.00 $50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof,to and including$100,000.00 $100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof,to and including$500,000.00 $500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including$1,000,000.00 $1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.15 for each additional $1,000.00, or fraction thereof Building Permit Fees shall be based on the Fee Table. 3 �J 10dg•�J 31'5.06 S 19,3 -7 5' Fire Suppression Permit fee shall be based on Fee Table Minimum fee of$50.00 for all permits Other Inspections and Fees: Work commencing before permit issuance Double Permit Fee Erosion Control Inspection Fee(single,two-family,townhomes up to 8 units) $150.00 Multi-family> 8 units, Commercial, Industrial and Institutional determined by separate agreement. Erosion Control Re-inspection Fee $50.00 per trip Inspections outside of normal business hours $50.00 per hour* Re-inspection fee $50.00 per trip Inspections for which no fee is specifically designed $50.00 per trip Additional plan review required by changes, additions, or revisions $50.00 per hour** For use of outside consultants for plan checking and inspections, or both Actual Cost*** In Ground Swimming Pool $141.00 Above Ground Swimming Pool $50.00 Plan Review Fee a. 65%of the Building Permit Fee b. 25% of the Building Permit Fee for review of similar plans (Master Plan) in a 12 month period Easement Encroachment Fee $55.00 Fence Permit $50.00 Roofing Permit $100.00 Siding Permit $100.00 Replacement Windows/Door Permit $100.00 Retaining Wall Permit $50.00 All Residential Mechanical Permits, (except new construction and air conditioning $50.00 Residential New Construction Mechanical Permit $60.00 Residential Air Conditioning Permit 1% of the contract price($50.00 minimum fee) Commercial Mechanical Permit 1% of the contract price($50.00 minimum fee) Manufactured Home Permits $90.00 Plumbing Permit 9.00 per fixture ($50.00 minimum fee) Electrical Permit (Emergency Ordinance No. 16-11,passed July 11, 2011) Services, Generators, Feeders to Separate Structures and Other Power Supply Resources 4 0 ampere to and including 200 ampere capacity $45.00 Each additional 100 amps or fraction thereof an additional $15.00 For services and circuits operating over 250 volts Scheduled fee doubles Circuits, Feeders, Feeder Taps or Sets of Transformer Secondary Conductors 0 amps to and including3p capacity $8.00 31 amps to and including 100 amp capacity $10.00 Each additional 100 amps or fraction of an additional $5.00 One—Family dwelling and each unit of two- family dwelling—Up to including 200 amps services (includes up to 3 inspections) $175.00 Multifamily dwellings each unit(up to 20 circuits and feeder) at $100.00 Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders at the above fees) $3.00 Electrical supply for each manufactured home park lot $45.00 Recreational vehicle site, electrical supply equipment each includingf_actory installed $10.00 Street, parking lot or outdoor area lighting standards, and traffic signal standard each $8.00 Transformers for Lighting, Heat and Power Up to and including 10 kilo-volt amps each $20.00 Over 10 kilo-volt amps each $40.00 Transformers and electronic power supplies for electric signs and outline lighting each $8.00 Swimming pool bonding inspection(each separate inspection) Bonding conductors and connections require inspection before concealed $45.00 Retrofit Modifications to existinglightingfixtures each $0.50 Transient Projects-Power supply fee as indentified above,plus 1 hour $90.00 Each attraction or concession inspection $45.00 Special inspection or inspections not covered by above fee is $90.00/hr plus mileage at the rate established by the IRS $90.00 Re-inspection fee when inspection is necessary to determine whether the unsafe conditions have been corrected a fee will be assessed by the inspector $45.00 Minimum Fee per Trip $45.00 5 All fees are subject to State of MN surcharge fees of $5.00 *Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay $75 or two times the permit fee(whichever isrg eater)not to exceed $1000.00. *For purposes of interpretation, Minnesota Rules, Chapter 3800, and the most recently adopted edition of the National Electric Code shall be prime facie evidence of the definitions, interpretations, and scope of words and terms used. Sewer Connection Fee $200.00 Water Connection Fee $250.00 Contractor License Verification $5.00 per permit Contractor Lead Certification Verification(effective Feb 1, 2011) $5.00 per permit Contractor License $50.00 SAC (Sewer Availability Charge) Per Met Council 3/4" Water Meter City cost plus 10%handling fee and sales tax I" Water Meter City cost plus 10%handling fee and sales tax MXU Unit City cost plus 10%handling fee and sales tax Touch Pad $18.00 plus sales tax Curb Stop Covers $70.00 plus sales tax Septic Installation or Repair Permit $150.00 Septic Pumping Permit $5.00 Demolition Permit $50.00 Lawn Sprinkler/Irrigation System Permit(effective June 26, 2008) $50.00 Irrigating or Watering of New Landscaping Permit(sod or seed) No Charge Lawn Sprinkling Violation $25.00 for first violation $50.00 for each subsequent citation Driveway Replacement Permit $50.00 Fee Refund—Per applicant request, City staff may refund permit fees up to 80% for voided permits. Plan review fees and state surcharge fees are non-refundable.—No refund shall be provided if permit has expired. All permits issued are subject to applicable State surcharge fees. * Inspections made out side of normal business hours is a three-hour minimum charge 6 ** Or the total hourly cost to the jurisdiction,whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. *** Actual costs include administrative and overhead costs. Sign Permit-Temporary(portable/banner) $25.00/Term Sandwich Board $25.00 An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan revision and construction observation. ESCROW DEPOSITS In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be completed due to inclement weather, as determined by City Staff,whereupon a Temporary Certificate of Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any unfinished work must be completed within six months(weather permitting) from the date of issuance. The following escrow amounts are hereby established: a. Driveway- $1,000.00 b. Exterior Concrete- $1,000.00 c. As-built Surveys- $1,000.00 d. Stucco (final coat only) - $1,000.00 e. Garage Floor- $1,000.00 f. Landscaping- $2,500.00(landscaping may be escrowed year-round per City Staff) Escrow deposits include a$50.00 non-refundable administrative fee. Escrow deposits can be submitted through one of the following procedures: a.) Escrow can be paid to the City upon execution of an agreement signed by both the payee and the City. b.) The title company or lending institution can hold the escrow upon execution of an agreement signed by both the title company or lending institution and the City. RIGHT-OF-WAY MANAGEMENT Excavation Permit Fees Hole (includes administration, plan review, inspection, testing and mapping).................$125.00 Trench(includes administration,plan review, inspection, testing&mapping)...$70.00 per 100 lineal feet plus hole fee Obstruction Permit Fee(includes administration,recording, review& inspection)...$50.00 plus $.05 per lineal foot Permit Extension Fee(includes administration, recording& review)....................................$55.00 DelayPenalty ....................................................................................................$60.00 for up to three days of non-completion and non-prior notice before specified date. After three days an additional charter of$10.00 per day will be levied Degradation Fee Formula: 7 This formula covers degradation for depreciation caused by intrusion into the right-of-way. The depreciation applies to the original surface of the right-of-way and to the overlays and seal-coats applied to the surface. The formula includes life expectancy schedules for each and has an estimated cost per square yard based on the quality of the right-of-way surface required for different levels of traffic. This formula creates a degradation fee which is determined by the cost per square yard for street, overlay, and seal-coat, multiplied by the depreciation schedule, multiplied by the area of the street patch. Degradation Fee: (cost per square yard for street overlay, and seal-coat x depreciation schedule rates) x area of street patch=degradation fee. UTILITY FEES Sewer Rate $52.00/Quarter/Reu+$1.00 Per 1000 Gallons Over 10,000 Gallons Water Meter Rental $400.00(Deposit)/$25 Per Month Additional Accessories $25.00 Per Month Utility Non-Payment Certification Fee $30.00 Underground Utility Permit $50.00 Meter Testing(Our Cost,Delivered To Minneapolis) 5/8"—3/4" Meter Test $50.00 1"Meter Test $65.00 1-1/2"—2" Meter Test $100.00 City Trunk Utility Connection Fees Sanitary Sewer Unit $2,840.00 Per Sac Unit Water Unit $3,760.00 Per Sac Unit Water Utility Rates (as amended December 8, 2008) Residential $10.00 per Quarter/REU*,plus $1.80 per Thousand Gallons(0—20,000 Gal.) $2.00 per Thousand Gallons(20,001 —40,000 Gal.) $2.50 per Thousand Gallons(40,001 —80,000 Gal.) $3.00 per Thousand Gallons(80,001 — 120,000 Gal.) $3.50 per Thousand Gallons(over 120,000 Gal.) Non-Residential Domestic $10.00 per Quarter/REU*,plus $1.80 per Thousand Gallons(0—20,000 Gal.) $2.00 per Thousand Gallons(20,001 —40,000 Gal.) $2.25 per Thousand Gallons(over 40,000 Gal.) Non-Residential Irrigation $2.50 per Thousand Gallons(0—40,000 Gal.) $3.00 per Thousand Gallons(40,001 —80,000 Gal.) $3.50 per Thousand Gallons(over 80,000 Gal.) * REU=a residential equivalent connection: 1. Residential—a single housing unit 2. Non-Residential REU=per Met Council Service Availability Charge Procedures Manual SURFACE WATER MGMT Land Use Type 8 I. II. III. Single/Two Multi Family Commercial/Industrial/ Family Lots Lots Institutional Property Fee Charge per Sq. Ft. of Development $ 0.132 $ 0.175 $ 0.194 Area Surface Water Management Charge: Applied to developing parcels in accordance with the policy provisions established in Resolution No. 92-70. Credits may be earned for watershed improvements. CULVERT PRICES All culvert prices are based on market prices and include tax &delivery and 15% administration fee ESCROW LAND USE FEE DEPOSIT* Alternative Urban Area-wide Review(AUAR) $269 per acre To be charged to land development applications within I-35E Corridor AUAR area that require preliminary plats; conditional use permits; site and building plans; and planned unit developments. Once paid, the same land will not be charged again. Administrative Permit- Home Occupation Level B $20 Application Fee(Required With Each Submittal) $100.00 Comprehensive Plan Amendment 40 Acres or Less $1,500 More Than 40 Acres $5,000 Conditional Use Permit Residential $750 Commercial/Industrial/Institutional $5,000 Environmental Assessment Worksheet $10,000 Interim Use Permit $750 Ordinance Amendment Map Amendment(Rezone) 40 Acres or Less $1,500 Over 40 Acres $5,000 Text Amendment $1,500 Planned Unit Development General Concept Plan $200 Development Stage Plan $10,000 Final Plan $2,500 Park Dedication-Residential $2,500 per unit 9 Park Dedication—Commercial/Industrial $2,175 per acre Site Plan Review $5,000 Subdivision Concept Plan Review $1,500 Minor Subdivision/Lot Split $1,000 Preliminary Plat 40 Acres or Less $2,500 Over 40 Acres $10,000 Final Plat $1,500 Tax Increment Financing or Tax Abatement $7,500 Vacation(Street,Utility, Drainage) $500 Variance or appeal $500 Zoning Confirmation Letter $25 *An escrow account shall be established as indicated above to cover all expenses incurred by the City as part of the plan review. In the case of applications including multiple requests the highest escrow deposit amount will be the only one initially required. The applicant is responsible for all costs incurred by the City during plan review. If the escrow account drops below 10% of the original deposit amount the City will require the submittal of an additional escrow deposit sufficient to cover any anticipated expenses. Upon City determination that the project is complete or expired, the City will return the remaining escrow deposit to the applicant. ENGINEERING Flood Plain Elevation Certificate $200.00 Fee Elevation Certificate Survey Add'l $1,000.00 Escrow Deposit Digital Contour Mapping $800 per% Section Increment STAFF TIME Staff time for chargeable event/projects shall be charged as the employee's hourly rate of pay plus benefits plus calculated overhead costs(when applicable). Overtime will be charged at 1.5 times the calculated hourly rate. LATE FEE Late penalty fee: a late charge of 10% or$25.00, whichever is greater, will be charged for any fees not paid when due. Section 2. Effective Date of Ordinance. This Ordinance shall be effective January 20, 2011. Passed by the Lino Lakes City Council this 13a`day of December 2010. 10 Jeff Reinert, Mayor ATTEST: Julie Bartell,City Clerk 11 CITY OF HUGO PERMIT NO.: 2007-01738 14669 FITZGERALD AVE. N. HUGO, MN 55038 DATE ISSUED: 12/11/2007 651/762-6300 FAX: 651/426-2859 REPRINTED ON 11/8/2011 ADDRESS 14725 VICTOR HUGO BLVD N PIN : 1903121230219 LEGAL DESC VICTOR GARDENS VILLAGE NORTH LOT 1 BLOCK 1 PERMIT TYPE BUILDING PROPERTY TYPE COMMERCIAL CONSTRUCTION TYPE NEW CONSTRUCTION ACTIVITY 318 AMUSEMENT, SOCIAL&RECREATION VALUATION $ 1,100,000.00 NOTE: PROPER LOWEST FLOOR ELEVATION.INSPECTIONS REQUIRED. ASSESSED$50,000 PER CITY AGREEMENT. SAC UNITS 27 APPLICANT PERMIT FEE 6,345.25 STATE SURCHARGE-BUILDING 540.00 RJ MARCO CONSTRUCTION PLAN CHECK FEE 4,124.41 75 WEST VIKING DR. SUITE 104 SAC(SEWER AVAIL CHARGE) 45,225.00 LITTLE CANADA,MN 55117- REC(RESI EQUIV CHARGE) 34,400.50 (651)484-5635 WAC(WATER AVAIL CHARGE) 34,400.50 TOTAL 125,035.66 OWNER PAID WITH CHECK# 39725 BLUE HERON GRILL ASSOC INC WAGNER,CHAD 8001 LAKE DRIVE CIRCLE PINES,MN 55014- AGREEMENT AND SWORN STATEMENT I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Applicant Signature City of Hugo-Authorized Signature This permit becomes null and void if work is not commenced within 180 days.Or if work is suspended for a period of 180 days at any time after work is commenced. SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. • r EXHIBIT C ESCROWS,FEES AND CHARGES a) Escrow for City Costs and Fees. Developer shall deposit sufficient escrow with the City as outlined in Section A. 1. The required beginning balance in the account is calculated at $8,546.76. This sum is calculated to be four percent (4%) of the estimate of the required improvements to be installed to serve the development. b) Cash Escrow or Letter of Credit. Developer shall provide a financial guarantee to the City, in the form of a cash escrow or letter of credit, in the amount equal to one hundred twenty-five percent (125%) of the estimated amount of the required improvements to be installed to serve the development. This amount has been calculated by the City's Engineer to be two hundred sixty seven thousand and eighty six dollars$267,086). This amount may be reduced upon request of the Developer and approved by the City. At no point shall the Letter of Credit be reduced below 10% of the original amount. The City shall have the right to retain the financial guarantee until the improvements have been completed to the satisfaction of the City and the warranty period has expired. c) Storm Water Trunk Fee. The Developer shall pay the City a Storm Water Trunk Fee in the amount of$9,568.51. This sum is calculated to be$0.07 per square foot for the 136,693 square feet of Net Developable Area within the Plat. This fee shall be paid before the Final Plat is signed by the City. d) Storm Water Ponding Fee.The storm water ponding requirement has been met by the Developer within the plat. No storm water ponding fee will be applied. e) Snow Plowing. Developer agrees to pay a cash escrow to the City to cover the cost of snowplowing the roads within the plat, during the first snow season, before the roads are formally accepted by the City of$.50 per lineal foot. The Developer shall post a cash escrow with the City in the amount of$157.50(i.e.,$0.50 x 315=$157.50). f) Sealcoatin . The Developer shall post a cash escrow with the City in the amount of$1,260.00 to cover the cost of the first sealcoating of the streets in the Plat. This sum is calculated to be$4.00 per foot for the 315 feet of streets within the Plat. g) Park Dedication. Developer agrees to pay a park dedication fee of$1,956 per lot for residential development payable before the final plat is signed by the City. Said fee shall be due for each of the 6 lots within the plat(i.e.total due$11,736). Prairie V111age r1 rst Addition 18 h) Cul-de-sac Escrow. N/A i) >acrow for Street Signage. Developer shall deposit$250.00 into an escrow account with the City. This amount represents an estimated cost to install signage within the development. The final amount shall be based on actual costs. j) Sanitary Sewer Trunk Fee. The developer shall pay the City a sanitary sewer mink fee in the amount of$9,792.00. This sum is calculated to be$1,632 per lot for the 6 residential lots within this phase. k) Water Trunk Fee.The development shall pay the City water trunk fee in the amount of$11,760.00. This sum is calculated to be $1,960 per lot for the 6 residential lots within this phase. Frairic V111age First Addition 19