Background
Manager Waller discussed possible changes to Pubic Waters Inventory
Aug 7, 2017
Discussion was about sending letter to DNR expressing concerns
Staff has obtained additional information
3
History
1979 designation of “Public Waters” by DNR
An “Inventory” was created ----------- PWI
Includes a list and a map
Process included public input before adoption
2015 Buffer Law
“Public
Waters” are relevant to the buffer law
Original PWI Maps were reviewed
Some ditches are on the map but not on the list
Proper notice was not provided to landowners – they might not know
their ditches are shown as “public waters”
JD-2 (Hardwood Creek) is one of these
April 2017 order removed these ditches from the PWI
4
Recent developments
RCWD received some communication from DNR indicating DNR’s recommendation to put JD-2 back on the PWI.
RCWD wants DNR to follow the original statutory process (with notice to landowners)
for PWI inclusion.
RCWD does not know what process DNR will follow
2017 DNR order anticipates a review of subject ditches for PWI inclusion subject to public comment.
RCWD has not taken
an stance on PWI designation
One of the 2017 City Council focus goals was to evaluate possible solar panel installation at City facilities. Staff believed the replacement of the Fire Hall roof would be a good opportunity
to investigate the opportunity to put solar panels on the roof of the facility.
Staff worked with a solar company who provided us with two potential systems. The first allows the
City for apply for the Xcel solar rewards program. This program helps offset the cost of the install. It is a 19.8 kW system, which is 59 panels. The system would save the City $1,426/year.
With using the Xcel rewards program, the system would cost approximately $35,600 and there would be a 25 year payback.
The second system maximizes the space on the fire hall roof by
using 147 panels for a 49.245 kW system. The project would cost $108,000 and the City would save $3,567/year. This would mean there would be a 30 year payback.
None of these numbers
include the degradation of the panel production nor any maintenance costs post install.
5
Conclusion
PWI inclusion (designating the ditch as “public waters”) could have multiple consequences to landowners, City, RCWD, etc.
Staff has not analyzed this matter
Would prefer to do so through
a proper process…
6
Recommendation
Staff will contact DNR staff to inquire about intended process
Staff will follow-up with letter